TenderDekho Logo
GEM

Open Tender for Provn of Sentry Post Shelter part only FOR ORAK,Provn of Sentry Post Shelter part only FOR GELEMO,P in DHEMAJI, ASSAM

Bid Publish Date

29-Apr-2025, 9:24 am

Bid End Date

21-May-2025, 10:00 am

EMD

₹29,000

Progress

RA
Issue29-Apr-2025, 9:24 am
Reverse Auction26-May-2025, 10:00 pm
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

27

Bid Type

Two Packet Bid

Categories 19

Public procurement opportunity for Indian Army Provn of Sentry Post Shelter part only FOR ORAK, Provn of Sentry Post Shelter part only FOR GELEMO, Provn of Construction Material for Sentry Post and Provn of Internal Pathway 20. 00 x 1. 00 Mtr FOR ORAK, Provn of Construction Material for Sentry Post and Provn of Internal Pathway 20. 00 x 1. 00 Mtr FOR GELEMO, Provn of Furniture and Provn of Fire Alarm System for Sentry Post FOR ORAK, Provn of Furniture and Provn of Fire Alarm System for Sentry Post FOR GELEMO in DHEMAJI, ASSAM. Quantity: 27 issued by. Submission Deadline: 21-05-2025 10: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Provn of Sentry Post Shelter part only FOR ORAK , Provn of Sentry Post Shelter part only FOR GELEMO , Provn of Construction Material for Sentry Post and Provn of Internal Pathway 20.00 x 1.00 Mtr FOR ORAK , Provn of Construction Material for Sentry Post and Provn of Internal Pathway 20.00 x 1.00 Mtr FOR GELEMO , Provn of Furniture and Provn of Fire Alarm System for Sentry Post FOR ORAK , Provn of Furniture and Provn of Fire Alarm System for Sentry Post FOR GELEMO

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7784221.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Provn of Sentry Post Shelter part only FOR ORAK

Provn of Prefabricated Sentry Post Elevated of size 6.00m x 5.00m ground floor with Puf panel wall with 30mm thick false ceiling with all arrangement including roof covered with PPGI Sheet and first and second floor with MS structure consisting of column comma truss comma cross bracings etc The structure shall be fabricated and erected on the basis of parameters for seismic Zone V as per attached drawings Detailed technical specification as per Appx A

2 set Delivery: 60 days
#2

Provn of Sentry Post Shelter part only FOR GELEMO

Provn of Prefabricated Sentry Post Elevated of size 6.00m x 5.00m ground floor with Puf panel wall with 30mm thick false ceiling with all arrangement including roof covered with PPGI Sheet and first and second floor with MS structure consisting of column comma truss comma cross bracings etc The structure shall be fabricated and erected on the basis of parameters for seismic Zone V as per attached drawings Detailed technical specification as per Appx A

7 set Delivery: 60 days
#3

Provn of Construction Material for Sentry Post and Provn of Internal Pathway 20.00 x 1.00 Mtr FOR ORAK

Constr Mtrl for electric items and B oblique R items of shelter Detailed technical specification as per Appx B att and store list att as per Annx I and Annx II. Provn of interlocking paving blocks for pathway of as per detailed specifications given as per Appx D and store list as per Annx III.

2 set Delivery: 60 days
#4

Provn of Construction Material for Sentry Post and Provn of Internal Pathway 20.00 x 1.00 Mtr FOR GELEMO

Constr Mtrl for electric items and B oblique R items of shelter Detailed technical specification as per Appx B att and store list att as per Annx I and Annx II. Provn of interlocking paving blocks for pathway of as per detailed specifications given as per Appx D and store list as per Annx III.

7 set Delivery: 60 days
#5

Provn of Furniture and Provn of Fire Alarm System for Sentry Post FOR ORAK

Provn of Furniture and Provn of Fire Alarm System as given in Ser No 3a to 3k at page No 02 of RFP and Detailed technical specification given as per Appx C.

2 set Delivery: 60 days
#6

Provn of Furniture and Provn of Fire Alarm System for Sentry Post FOR GELEMO

Provn of Furniture and Provn of Fire Alarm System as given in Ser No 3a to 3k at page No 02 of RFP and Detailed technical specification given as per Appx C.

7 set Delivery: 60 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Reverse Auction Schedule

Completed

Start

26-May-2025, 10:00 pm

End

28-May-2025, 9:00 am

Duration: 35 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-20-05-2025 17:35:38
2
**********   Under PMA
-20-05-2025 22:28:08
3
**********   Under PMA
-20-05-2025 08:54:52
4
**********   Under PMA
-20-05-2025 23:06:07
5
**********   Under PMA
-20-05-2025 13:38:22
6
**********   Under PMA
-21-05-2025 09:33:43
7
**********   Under PMA
-07-05-2025 16:30:03
8
**********   Under PMA
-21-05-2025 00:52:04
9
**********   Under PMA
-20-05-2025 22:39:57
10
**********   Under PMA
-20-05-2025 17:29:42
11
**********   Under PMA
-21-05-2025 00:24:08
12
**********   Under PMA
-21-05-2025 00:39:10
13
**********   Under PMA
-20-05-2025 22:16:01

Frequently Asked Questions

Key insights about ASSAM tender market

What are the eligibility requirements for GEM/2025/B/6180156?

The eligibility requirements include being a registered entity, possessing relevant technical certifications, and complying with military standards. Bidders must demonstrate applicable past experience in similar projects and ensure they maintain necessary health and safety credentials. A clear submission of all documentation evidencing compliance is crucial for consideration.

What documents are required to submit along with bids for the SENTRY POST tender?

Bidders must submit a complete set of documents including technical and financial proposals, proof of registration, compliance certifications, and detailed technical specifications. All submissions must be made electronically and adhere to the formats mentioned in the tender documents for acceptance.

What are the financial requirements for participating in the SENTRY POST procurement process?

The financial requirements involve submission of an earnest money deposit (EMD) as indicated in the tender specifications, alongside a proposal that clearly outlines payment terms and conditions. Successful bidders will be required to provide performance security to ensure compliance throughout the project lifecycle.

How will the evaluation and selection process work for this tender?

The evaluation will involve a systematic review of submitted technical and financial proposals. Bids will be assessed on technical compliance, quality standards adherence, pricing, and past project performance. Once evaluations are completed, bidders will be notified of the results based on established criteria.

What benefits do Micro, Small, and Medium Enterprises (MSEs) receive from participating in this tender?

MSEs may enjoy preferential financial criteria, access to special partnerships, and opportunities to enhance their competitive edge in the procurement process. Additionally, provisions supporting local manufacturing under 'Make in India' policies contribute to fostering entrepreneurial growth in the sector.