M-CCUN-ROL-001,M-CCUN-ROL-002,M-CCUN-ROL-003,M-CCUN-ROL-004,M-CCUN-ROL-005,M-CCUN-ROL-006,M-CCUN-RO
Numaligarh Refinery Limited
GOLAGHAT, ASSAM
Progress
Quantity
1010
Category
M-SRBB-0002
Bid Type
Two Packet Bid
Numaligarh Refinery Limited invites bids under multiple M-SRBB categories for a 12-item BOQ shared in the tender package. The data sheet must accompany bids, and bidders must submit product data sheets for cross-verification. An option clause allows quantity adjustments up to 25% of bid quantity during contract placement and within the currency period, with delivery time recalculated accordingly. The terms specify that GST is bidder’s responsibility and reimbursement is at actuals or prevailing rate, capped to the quoted GST percentage. There is a requirement to demonstrate financial stability (no liquidation or bankruptcy) and to upload an undertaking. The procurement aims to preserve delivery discipline and compliance with the detailed ATC/Policy attachments. This tender may encompass security equipment or related items under the listed M-SRBB categories, with emphasis on conformance to contractual terms and data-sheet alignment.
Product category: 12-item BOQ with unspecified item details
Delivery terms: adjusted delivery period based on 25% quantity variation
Standards/certifications: not specified in public data; refer to ATC for exact requirements
Data Sheet: mandatory for all offered products
GST: bidder bears liability; reimbursement capped to quoted GST
Financial viability: no liquidation or bankruptcy; required undertaking
Documentation: upload all required certificates as per ATC
Quality control: data-sheet vs. product parameter mismatch may lead to rejection
Option to increase quantity by up to 25% with proportional delivery extension
Bidder must declare financial soundness and upload undertaking
GST responsibility lies with bidder; reimbursement as actuals or rate up to quoted GST
Mandatory data sheets and certificates; non-submission leads to rejection
GST handling by bidder; reimbursement as actuals or as per applicable rate, not exceeding quoted GST percentage
Delivery period may extend with 25% quantity variation; extension formula: (Increased quantity / Original quantity) × Original delivery period, minimum 30 days
Not disclosed in provided data; refer to detailed ATC and tender documents for LD terms
Not under liquidation, court receivership, or bankruptcy
Authorized to submit technical data sheets and certificates
GST applicable to bidder; data sheet alignment with offered product
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Numaligarh Refinery Limited
GOLAGHAT, ASSAM
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | M-SRBB-0002 | Seamless CS (IBR) boiler tube Size 38.1 | 70 | nos | dibakarbarhoi | 90 |
| 2 | M-SRBB-0003 | 180 deg bend R 58 38.1 OD X 3.66 thk SA | 110 | nos | dibakarbarhoi | 90 |
| 3 | M-SRBB-0004 | 90 deg bend R 58 38.1 OD X 3.66 thk SA 2 | 260 | nos | dibakarbarhoi | 90 |
| 4 | M-SRBB-0015 | Evaporator coil module as per drwg | 5 | nos | dibakarbarhoi | 90 |
| 5 | M-SRBB-0006 | Seamless CS (IBR) boiler tube,50.8 ODX4 | 500 | m | dibakarbarhoi | 90 |
| 6 | M-SRBB-0005 | Economiser coil 38.1 OD X 3.66 thk SA 2 | 5 | nos | dibakarbarhoi | 90 |
| 7 | M-SRBB-0009 | Bend Wall tube CS (IBR) Part No 701G | 10 | nos | dibakarbarhoi | 90 |
| 8 | M-SRBB-0010 | Bend Wall tube CS (IBR) Part No 702G | 10 | nos | dibakarbarhoi | 90 |
| 9 | M-SRBB-0011 | Bend Wall tube CS (IBR) Part No 703G | 10 | nos | dibakarbarhoi | 90 |
| 10 | M-SRBB-0012 | Bend Wall tube CS (IBR) Part No 704G | 10 | nos | dibakarbarhoi | 90 |
| 11 | M-SRBB-0013 | Bend Wall tube CS (IBR) Part No 705G | 10 | nos | dibakarbarhoi | 90 |
| 12 | M-SRBB-0014 | Bend Wall tube CS (IBR) Part No 706G | 10 | nos | dibakarbarhoi | 90 |
GST registration certificate
PAN card
Data Sheet of offered product(s)
Technical compliance certificates
OEM authorizations (if applicable)
Undertaking on financial standing (no liquidation/bankruptcy)
Bid security/EMD documents (as applicable in ATC)
Experience certificates or turnover data (as required in ATC)
Extended Deadline
05-Dec-2025, 4:00 pm
Opening Date
05-Dec-2025, 4:30 pm
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ENCON ENTERPRISES PRIVATE LIMITED Under PMA | - | 19-11-2025 12:29:18 | Qualified |
| 2 | PRIVILEGE BIKSONS BOILERS PRIVATE LIMITED Under PMA | - | 04-12-2025 23:26:01 | Qualified |
| 3 | RIBO INDUSTRIES PRIVATE LIMITED Under PMA | - | 05-12-2025 11:15:11 | Qualified |
| 4 | SHANTA TECHNO PRIVATE LIMITED Under PMA | - | 05-12-2025 15:40:40 | Qualified |
| 5 | THE BOILER COMPONENTS MFG.CO Under PMA | - | 04-12-2025 13:12:07 | Qualified |
| 6 | TPP BOILERS PRIVATE LIMITED Under PMA | - | 26-11-2025 12:35:10 | Qualified |
| 7 | ZION ENGINEERING WORKS (UNIT-2) Under PMA | - | 20-11-2025 15:58:43 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | ENCON ENTERPRISES PRIVATE LIMITED(MSE)( MSE Social Category:General ) Under PMA | ₹17,04,522 | Item Categories : M-SRBB-0002,M-SRBB-0003,M-SRBB-0004,M-SRBB-0015,M-SRBB-0006,M-SRBB-0005,M-SRBB-0009,M-SRBB-0010,M-S |
| L2 | SHANTA TECHNO PRIVATE LIMITED (MSE)( MSE Social Category:General ) Under PMA | ₹18,26,935 | Item Categories : M-SRBB-0002,M-SRBB-0003,M-SRBB-0004,M-SRBB-0015,M-SRBB-0006,M-SRBB-0005,M-SRBB-0009,M-SRBB-0010,M-S |
| L3 | TPP BOILERS PRIVATE LIMITED (MSE)( MSE Social Category:General ) Under PMA | ₹20,44,770 | Item Categories : M-SRBB-0002,M-SRBB-0003,M-SRBB-0004,M-SRBB-0015,M-SRBB-0006,M-SRBB-0005,M-SRBB-0009,M-SRBB-0010,M-S |
| L4 | THE BOILER COMPONENTS MFG.CO (MSE)( MSE Social Category:General ) Under PMA | ₹22,03,900 | Item Categories : M-SRBB-0002,M-SRBB-0003,M-SRBB-0004,M-SRBB-0015,M-SRBB-0006,M-SRBB-0005,M-SRBB-0009,M-SRBB-0010,M-S |
| L5 | PRIVILEGE BIKSONS BOILERS PRIVATE LIMITED Under PMA | ₹24,52,665 | Item Categories : M-SRBB-0002,M-SRBB-0003,M-SRBB-0004,M-SRBB-0015,M-SRBB-0006,M-SRBB-0005,M-SRBB-0009,M-SRBB-0010,M-S |
| L6 | RIBO INDUSTRIES PRIVATE LIMITED (MSE)( MSE Social Category:OBC ) Under PMA | ₹30,83,670 | Item Categories : M-SRBB-0002,M-SRBB-0003,M-SRBB-0004,M-SRBB-0015,M-SRBB-0006,M-SRBB-0005,M-SRBB-0009,M-SRBB-0010,M-S |
| L7 | ZION ENGINEERING WORKS (UNIT-2) (MSE)( MSE Social Category:General ) Under PMA | ₹54,27,000 | Item Categories : M-SRBB-0002,M-SRBB-0003,M-SRBB-0004,M-SRBB-0015,M-SRBB-0006,M-SRBB-0005,M-SRBB-0009,M-SRBB-0010,M-S |
Key insights about ASSAM tender market
Bidders must consult the detailed ATC, upload Product Data Sheets, supply GST information, and provide certificates. Ensure no liquidation, submit an undertaking, and comply with the 25% quantity option clause. Delivery terms follow the original period with adjusted time for any quantity increase.
Submit GST certificate, PAN card, product Data Sheet, technical certificates, OEM authorizations if applicable, financial statements, and an undertakings confirming no liquidation. Include EMD documents as specified in the ATC and ensure all certificates are uploaded.
The purchaser may increase ordered quantity by up to 25% and extend the delivery period accordingly using the formula: (Increased quantity / Original quantity) × Original delivery period, with a minimum extension of 30 days.
Bidders bear GST liability; reimbursement will be based on actuals or applicable rates, whichever is lower, and cannot exceed the quoted GST percentage in the bid. Ensure GST compliance in bid documentation.
Any mismatch between data sheet parameters and offered product can lead to bid rejection. Ensure the Data Sheet precisely reflects the actual product specifications and performance characteristics offered.
Mandatory certificates include GST, PAN, data sheets, and technical compliance certificates; OEM authorizations where applicable; failure to attach may result in rejection as per ATC.
Delivery timelines adjust only after quantity variation and are computed as per the option clause formula, with a minimum delivery extension of 30 days; the extended schedule must align with original terms.
Bidders must not be under liquidation or bankruptcy; provide an undertaking to confirm financial stability; ensure no court receivership as part of prequalification for Numaligarh refinery procurement.
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS