Bid Publish Date
29-Aug-2026, 2:05 pm
Bid End Date
12-Sep-2026, 6:00 pm
Progress
Advanced Weapons And Equipment India Limited (Department of Defence Production) invites bids for a solid carbide 2-fluted endmill with a dia=2mm, FL=3mm, Neck dia=1.95mm, Reach length=20mm, OAL=50mm. The procurement scope covers a single item aligned to the Annexure 43/Q/0522/26-27, with delivery terms anchored to the original delivery period and potential quantity variation up to 25%. Inspection is to be conducted at Rifle Factory Ishapore by CGM/RFI. Payment terms specify 100% payment within 30 days after delivery and acceptance. The offer should adhere to the mandatory ATC requirements and the specified delivery/LD conditions. This tender targets suppliers capable of precise carbide tooling for defense manufacturing contexts and emphasizes conformance to attached TE/Annexure documents.
Endmill type: solid carbide, 2-fluted
Dimensions: dia 2.0 mm; flute length 3.0 mm; neck dia 1.95 mm; reach length 20 mm; OAL 50 mm
Inspection site: Rifle Factory Ishapore; inspection authority: CGM/RFI
Payment: 100% within 30 days after delivery & acceptance
LD: 0.5% per week, max 10% of delayed store value
Quantity adjustment: ±25% during contract; delivery period linked to original/extended orders
Delivery period and option clause allow up to 25% quantity variation with adjusted timelines
100% payment within 30 days post-acceptance; LD capped at 10%
GST compliances and GeM-submitted documents are mandatory for bid submission
100% payment within 30 days after successful delivery and acceptance
Delivery period starts from last date of original delivery order; option clause may extend period with minimum 30 days
LD at 0.5% per week, maximum 10% of delayed store value
Must comply with Annexure 43/Q/0522/26-27 for inspection and specifications
Must provide GSTIN, PAN, EFT mandate, and banking details
Must meet GeM submission requirements and maintain confidentiality
Quantity
140
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Solid Carbide 2 fluted endmill dia= 2mm X FL= 3mm X Neck dia= 1.95mm X Reach lenth= 20mm X OAL= 50mm X Sh
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
NORTH PARAGANAS
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | NORTH 24 PARAGANAS | NORTH PARAGANAS | - | - | 140 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate duly certified by Bank
GST invoice on GeM portal and GST portal payment confirmation
Technical bid documents as per TE Annexure 43/Q/0522/26-27
OEM authorization (if applicable) and any CGM/RFI inspection clearance
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and GST invoice on GeM. Ensure TE Annexure 43/Q/0522/26-27 compliance, and provide proof of capability for 2-fluted carbide tooling. Delivery terms require payment within 30 days post-acceptance; LD applies for delays.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, and GST-compliant invoice copy. Include TE Annexure 43/Q/0522/26-27, OEM authorizations if applicable, and proof of GST payment. Ensure confidential handling of TE data and attach inspection clearance details.
Endmill must be solid carbide with dia 2.0 mm, flute length 3.0 mm, neck dia 1.95 mm, reach length 20 mm, and overall length 50 mm. Compliance with annexure TE details and Rifle Factory Ishapore inspection criteria is mandatory for acceptance.
Payment is 100% within 30 days after successful delivery and formal acceptance of the material at the designated inspection site, Rifle Factory Ishapore, as per ATC clause.
Liquidated damages are 0.5% per week of the contract value for each week of delay, up to a maximum of 10% of the delayed store value, applied from the day after the agreed delivery date.
Yes. The purchaser may increase or decrease quantity up to 25% at contract placement and during the currency of the contract at contracted rates, with delivery time adjusted per the option clause formula.