Progress
Organization: Indian Army (Department Of Military Affairs) in Hisar, Haryana. Procuring a range of sanitary and plumbing products: Rotational M moulded polyethylene water storage tanks (V3) conforming to IS 12701 (Q3); Vitreous China washbasins and washdown toilets conforming to IS 2556 (Q3/Part 4); bathroom mirrors (V3, Q4); towel rails, health faucets; plastic bib taps, pillar taps, angle valves & stop valves for hot & cold water conforming to IS 9763 (Q3); copper alloy taps/stop valves conforming to IS 8931 (Q3). EMD: ₹82,128. No BOQ items listed; scope indicates supply of goods only. Turnover criteria require three-year average as per bid document with OEM turnover criteria. Unique aspect: multiple IS standards alignment for a single supply. Target bidders: manufacturers or authorized distributors compliant with specified IS standards.
Rotational Moulded Polyethylene Water Storage Tanks (V3) conforming to IS 12701 (Q3)
Vitreous China washbasins and washdown toilets conforming to IS 2556 (Q3) and IS 2556 (Part 4) (Q3)
Bathroom mirror (V3, Q4) and towel rail
Health faucet and PLASTIC BIB TAPS, PILLAR TAPS, ANGLE VALVES & STOP VALVES for hot & cold water conforming to IS 9763 (Q3)
Copper alloy taps/stop valves conforming to IS 8931 (Q3)
EMD amount ₹82,128; submit with bid
Advance sample submission: 2 samples within 5 days of award
Delivery schedule adjustable for sample approval timings
GST handling by bidder; reimbursement as actual or per applicable GST rate; payment terms aligned with buyer's standard practices
Delivery period may be refixed if buyer delays sample approval; bulk supply contingent on approved samples
Not explicitly stated; contract allows termination for major deviations in samples or specifications
Three-year average turnover as per bid document with supporting evidence
No liquidation or insolvency proceedings; valid GST and PAN
Must demonstrate IS 12701, IS 2556, IS 9763, and IS 8931 compliance or OEM authorization
Quantity
1974
Category
Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
12
OEM Avg. Turnover
12
Past Performance
10 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701 (Q3) , (Vitreous China) - Washdown Water Closets as per IS 2556 (Q3) , Wash Basins - Vitreous Sanitary Appliances (Vitreous China) conforming to IS 2556 (Part 4) (Q3) , Bathroom or Toilet Mirror (V3) (Q4) , Towel Rail (Q3) , Health Faucet (Q3) , PLASTIC BIB TAPS, PILLAR TAPS, ANGLE VALVES & STOP VALVES FOR HOT & COLD WATER SERVICES Conforming to IS 9763 (Q3) , Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3)
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
18
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Hisar
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Hisar | Hisar | - | - | 7 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements or CA certificate showing 3-year turnover
Bidder undertaking confirming no liquidation or court receivership
OEM authorization letter (if bidding as authorized distributor)
Technical compliance certificates for IS 12701, IS 2556, IS 9763, IS 8931
Advance sample submission documents (2 samples) as required
Any other bid-specific documentation requested by buyer
Key insights about HARYANA tender market
Bidders must submit GST, PAN, audited turnover or CA certificate for last 3 years, and OEM authorization if applicable. Include IS 12701/IS 2556/IS 9763/IS 8931 compliance. Provide 2 advance samples within 5 days of award; ensure bulk supply aligns to approved sample to avoid delays.
Required documents include GST certificate, PAN, audited financials or CA turnover statement, turnover evidence for last 3 years, non-liability declaration against liquidation, OEM authorization if not the manufacturer, and IS compliance certificates for relevant products.
Bidders must meet IS 12701 for water storage tanks, IS 2556 (Part 4) for vitreous china fixtures, IS 9763 for taps, and IS 8931 for copper alloy taps. Compliance proofs and certificates must accompany the bid submission.
Advance samples: 2 samples due within 5 days of contract award. Approval or modification timing determines the final bulk delivery schedule; delays in approval may reframe the delivery period without liquidated damages.
EMD is ₹82,128. Submit via the tender portal as per buyer guidelines; ensure the bidder capacity and bank details align with payment terms and bid submission requirements.
The bidder must demonstrate three-year average turnover as specified in the bid document, supported by audited balances or CA certificates. OEM turnover criteria apply to the offered product, ensuring the OEM meets minimum annual turnover thresholds for the relevant period.
Delivery follows after final sample approval; if delays occur due to buyer for sample approval, the delivery period is adjusted. Penalties/LD are not explicitly stated; contract may allow termination for major deviations or non-conformance.
Submit explicit IS compliance certificates for each product line: IS 12701 (tanks), IS 2556 (Vitrous China fixtures), IS 9763 (taps), IS 8931 (copper alloy taps). Include OEM authorizations where required and product datasheets detailing conformity to each standard.