Bid Publish Date
23-Jan-2026, 5:44 pm
Bid End Date
10-Feb-2026, 3:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Organization: Bharat Heavy Electricals Limited (BHEL). Procurement: Temperature transmitters and FRP canopies for supply. Location: Raigad, Maharashtra. Estimated value: Not disclosed. Quantity/Scale: Up to 25% quantity variation allowed under option clause; final delivery tied to original delivery period with potential adjustments. Unique element: Detailed design drawings must be approved by the buyer prior to fabrication, with a 5-day submission window and a 7-day modification cycle. This procurement emphasizes non-obsolescence (2-year residual market life) and GST considerations, with a consortium option for bidders lacking in-house expertise. The setup prioritizes alignment with buyer-approved drawings and adherence to delivery timelines post-approval, ensuring supply as per modified drawings if required.
Temperature transducers products with FRP canopy integration
Not specified in detail; emphasis on approval of Detailed Design Drawings prior to fabrication
Must avoid end-of-life products; minimum 2 years residual market life
GST treatment as per actuals; bidder bears GST implications
Consortium allowed with leader; all members must meet eligibility requirements
Option clause allows ±25% quantity variation during/after contract at contracted rates
Buyer approval of Detailed Design Drawings required within 5 days of award
Notarized undertaking required for bidders against liquidation or bankruptcy
GST reimbursement as actuals or at quoted rate, whichever lower; payment terms not explicitly defined
Delivery starts after original delivery order; extended time computed with minimum 30 days
LD terms not specified; draws on drawing approval delays to adjust delivery without LD
Not under liquidation, court receivership, or bankruptcy
Non-obsolete products with at least 2 years residual market life
GST registration and PAN validity; ability to supply Detailed Design Drawings within 5 days
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply of Temperature transmitters and FRP canopies
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT mandate copy certified by bank
Consortium agreement (if applicable) with leader designation
Technical bid documents demonstrating non-obsolescence and market life
Proof of capability to submit Detailed Design Drawings within 5 days
Any OEM authorization if bidding as a consortium or third-party supplier
Extended Deadline
10-Feb-2026, 3:00 pm
Opening Date
10-Feb-2026, 3:30 pm
Extended Deadline
05-Feb-2026, 6:00 pm
Opening Date
05-Feb-2026, 6:30 pm
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ABB INDIA LIMITED Under PMA | Make : ABB Model : TTD300 Title : Supply of Temperature transmitters and FRP canopies | 10-02-2026 12:33:35 | |
| 2 | INDUSTRIAL CONTROL SYSTEMS Under PMA | Make : EMERSON PROCESS MANAGEMENT (INDIA) PRIVATE LIMITED--EMERSON PROCESS MANAGEMENT (INDIA) PRIVATE LIMITED Model : 644dae Title : Supply of Temperature transmitters and FRP canopies | 05-02-2026 14:19:30 | |
| 3 | SMANK Under PMA | Make : Unbranded--HONEYWELL AUTOMATION INDIA LIMITED Model : STT850 Title : Supply of Temperature transmitters and FRP canopies | 02-02-2026 17:50:37 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | INDUSTRIAL CONTROL SYSTEMS Under PMA | Item Categories : Supply of Temperature transmitters and FRP canopies | |
| L2 | SMANK Under PMA | Item Categories : Supply of Temperature transmitters and FRP canopies |
Please sign in or create an account to view contract details and download result documents.
Key insights about MAHARASHTRA tender market
Bidders should prepare PAN, GSTIN, cancelled cheque, and EFT mandate; demonstrate non-obsolescence with >2 years market life; submit Detailed Design Drawings within 5 days of award, and then address buyer modifications within 7 days. Consortium bids allowed with designated leader; ensure compliance with option clause up to 25% quantity variation.
Required documents include PAN Card, GSTIN, cancelled cheque, EFT mandate; if bidding as a consortium, include consortium agreement; provide evidence of non-obsolescence and market life; detailed design drawings submission proof within 5 days; GST handling per actuals or quoted rate.
The tender emphasizes supply of temperature transmitters and FRP canopies with buyer-approved drawings before fabrication; no detailed specs published; ensure products are ISI-marked or OEM-certified where applicable and maintain 2-year residual market life to avoid end-of-life status.
Delivery can be extended up to 25% of the contracted quantity and extended delivery time follows the formula: (additional quantity ÷ original quantity) × original delivery period, with a minimum of 30 days; original delivery period must be used as baseline.
Bidders must determine GST applicability themselves; GST reimbursement will be at actuals or the lower of actual vs quoted rate; noadditional buyer responsibility; include GST registration proof in bid submission.
Explicit liquidated damages are not stated; delivery delays due to buyer drawing approval delays result in no LD, with delivery period refixed; ensure prompt submission of drawings to minimize risk and maintain schedule.