Open Tender for Soil Investigation for Augmentation of water storage and distribution system,Mobilization of boring in KANNUR, KERALA

Bid Publish Date

21-Jul-2026, 1:40 pm

Bid End Date

31-Jul-2026, 2:00 pm

Value

₹11,80,000

Location

KANNUR , KERALA

Progress

Issue21-Jul-2026, 1:40 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

32

Category

Soil Investigation for Augmentation of water storage and distribution system

Bid Type

Two Packet Bid

Categories 55

Indian Army invites bids for Soil Investigation for Augmentation of water storage and distribution system, Mobilization of boring equipment, Setting of drilling rig, Drilling of bore hole, Laboratory Investigation, Determination of Chemical Properties, Conducting Plate load test, Determination of Physical and Chemical Properties, Determination of RL on ground level, Preparation and submission of investigation report in KANNUR, KERALA. Quantity: 32. Submission Deadline: 31-07-2026 14: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Soil Investigation for Augmentation of water storage and distribution system , Mobilization of boring equipment , Setting of drilling rig , Drilling of bore hole , Laboratory Investigation , Determination of Chemical Properties , Conducting Plate load test , Determination of Physical and Chemical Properties , Determination of RL on ground level , Preparation and submission of investigation report

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

KANNUR

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KANNURKANNUR--1120-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9572489.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 10 Items Sign in for GEM prices

#1

Soil Investigation for Augmentation of water storage and distribution system

Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing (03 Locations)

1 job Delivery: 120 days
#2

Mobilization of boring equipment

Mobilization of boring equipment for soil investigation and demobilization of equipment after completion of work

1 each Delivery: 120 days
#3

Setting of drilling rig

Setting of drilling rig at each bore locations

6 each Delivery: 120 days
#4

Drilling of bore hole

Drilling of Borehole, Trial pits 01 No for PH and Bore hole for UG sump-03 Nos and PH - 01 No. Boreholes will be made using rotary drilling and representative soil samples shall be collected from the boreholes at every 1m interval or change of strata. The diameter of boreholes will be 150mm as per IS-1892.The borehole shall be terminated at 15 m below Existing Ground Level (EGL) or upto Hard rock strata which is occur earlier. The following shall be carried out (i) Field investigation shall be carried out on top of the ground level of each borehole shown as a drawing. (ii) Standard Penetration test will be carried out as per IS 2131-1981 at 1m interval or change in strata. The SPT consists of driving split spoon sampler 63.5 kg hammer drop weight with free fall of 760 mm. The number of blows for every 150 mm shall be recorded for a penetration of 450 mm (a) Trial Pit 01 each and (b) Bore hole 06 each.

1 each Delivery: 120 days
#5

Laboratory Investigation

Laboratory investigation - The soil samples be tested in the laboratory to evaluate the following. a)Type of soil and its gradation b)Consistency limit c)Natural density d)Natural water content e)Shear tests

6 per bore Delivery: 120 days
#6

Determination of Chemical Properties

Determination of Chemical Properties - The soil samples be tested in the laboratory to evaluate the following a) pH b) Sulphur content c) Chloride content

6 per sample Delivery: 120 days
#7

Conducting Plate load test

Conducting Plate Load Test and Submission of Soil Bearing Capacity Report for proposed different site including mobilization of equipment, excavation, testing and submission of detailed geotechnical report. (a) Excavation up to required testing depth. (b) Providing all labour, hydraulic jack, reaction arrangement, loading platform, test plates, measuring gauges and accessories. (c) Recording settlement observations at various loading stages (24 hrs). Determination of (d) Safe Bearing Capacity (SBC) (e) Settlement characteristics (f) Modulus of subgrade reaction (g) Submission of detailed soil investigation and test report with recommendations for foundation design. The final report shall contain (a) Site observations (b) Test methodology (c) Load vs settlement curves (d) Safe Bearing Capacity calculations (e) Foundation recommendations (f) Settlement analysis (g) Photographs of testing

3 job Delivery: 120 days
#8

Determination of Physical and Chemical Properties

Determination of physical and chemical properties of Ground water shall include tests for pH, total hardness, etc

6 per sample Delivery: 120 days
#9

Determination of RL on ground level

Determination of RL of ground level/Founding level with reference to a BM using topographic survey (03 Locations)

1 ls Delivery: 120 days
#10

Preparation and submission of investigation report

Preparation and submission of investigation report for suitable foundation which includes a) SBC should be worked out for following size of Isolated footing / Raft foundation. i)1.5x1.5 m ii) 1.5x2.5 m iii) 2.0x2.5 m iv)2.0x3.0 m b) Photographic record of geo exploration as well as testing. c) Recommendation as regards possibility of liquefaction of soil in case of saturated or partially saturated loose or uncompacted sandy soil. d) Swelling index and swelling pressure in respect of black cotton soil and its depth or layer. e) Depth of Ground water table(GWT) in peak mansoon(lowest) Peak summer (highest)after correlation of result with seasonal variation of water table in proposed site.lab testing, borelogs, recommendation of foundation type and bearing capacity Including vetting by any Govt Engg colleges.

1 ls Delivery: 120 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer