TenderDekho Logo
Closed GEM

Uttar Pradesh Power Corporation Limited Transformer Protection Semi Turnkey Tender Agra 2026-27 IS Standards 2026

Bid Publish Date

29-Aug-2026, 5:15 pm

Bid End Date

11-Sep-2026, 4:00 pm

EMD

₹35,500

Value

₹35,47,164

Generate Docs

Progress

RA
Issue29-Aug-2026, 5:15 pm
Corrigendum08-Sep-2026
Reverse AuctionCompleted
AwardCompleted

Key Highlights

  • • Exact EMD amount ₹35,500 and the option to pay via RTGS/Internet Banking to UP Power Corporation Ltd. 790 EDC
  • • Performance security can be submitted as Fixed Deposit Receipt (FDR) in the name of UP Power Corporation Ltd. 790 EDC or as PBG under GeM GTC
  • • Post-award quantity/duration adjustment up to 25%; scope expansion for lump-sum contracts with bidder consent
  • • No BOQ items provided; implies a service-oriented semi turnkey transformer protection and distribution protection work

Tender Overview

Organization: Uttar Pradesh Power Corporation Limited (UPPCL) - Energy Department, Uttar Pradesh. Procurement: Operation and Maintenance of Electrical Systems / Electrical Installations focused on Power Transformer Protection and Distribution Transformer Protection work on a Semi Turnkey basis in Agra, Uttar Pradesh under the Business Plan 2026-27 for EDC, Agra. Estimated value: ₹3,547,164 with an EMD of ₹35,500. Unique terms include a 25% contingency for quantity or duration adjustments at contract issue and post-award, and scope expansion up to 25% with service-provider consent for lump-sum contracts. This tender has no BOQ items listed, signaling a broad service-based scope or pending itemization. Bidder must align with EDC Agra objectives and ensure compliance with GeM GTC forms for performance security. Keywords: tender in Agra, UPPCL procurement, transformer protection service.

Technical Specifications & Requirements

  • No specifications provided in the data; bidders should expect service-oriented requirements for semi turnkey transformer protection and associated electrical installations.
  • Potential deliverables include: routine protection system checks, fault analysis, protection scheme maintenance, and coordination with upstream/downstream protection networks.
  • Financials indicate a moderate project scope: Estimated value ₹3,547,164; EMD ₹35,500; tender includes flexible contract quantity/duration clauses up to 25% at bidding and post-contract stages.
  • Payment modalities reference RTGS/online transfers, with explicit banks and account details for EMD and security deposits; ensure readiness to supply FDR/PBG equivalents if required. Ensure readiness to adhere to local electrical standards and UP energy regulatory conditions.

Terms, Conditions & Eligibility

  • EMD: ₹35,500; options include online RTGS/internet banking to UP Power Corporation Ltd. 790 EDC, SBI Agra branch; provide transaction proof with bid.
  • Performance security: FDR or online payment accepted; FDR must be in the name of UP Power Corporation Ltd. 790 EDC; deliver original FDR within 15 days of award.
  • Contract flexibility: 25% quantity/duration variation allowed at bid/contract issuance; lump-sum scope increases also allowed with service-provider consent.
  • Eligibility: bidder must not be under liquidation or similar proceedings; provide undertaking with bid; ensure financial stability and organizational capability for semi turnkey transformer protection work.
  • Documentation: submit required GST, PAN, experience certificates, and indicative financials; provide FDR/online payment proof as applicable.
  • The tender references GeM GTC-compliant security/deposit mechanisms; ensure compliance with local procurement rules and energy department requirements for UP.

Key Specifications

  • Transformer protection and distribution transformer protection services

  • Estimated contract value ₹3,547,164; EMD ₹35,500

  • Delivery location: Agra, Uttar Pradesh

  • 25% contract quantity/duration flexibility at bid/award; 25% scope increase with consent

  • EMD may be paid via RTGS/online banking to UP Power Corporation Ltd. 790 EDC

  • Performance security via FDR in the name of UP Power Corporation Ltd. 790 EDC or GeM-compliant PBG

Terms & Conditions

  • EMD amount and payment method; FDR/PBG options for performance security

  • 25% quantity/duration variation rights; scope expansion with consent for lump-sum contracts

  • Documentation and eligibility: non-liquidation undertaking; financials and experience proofs

Important Clauses

Payment Terms

EMD to be paid via RTGS/online transfer; ensure bid reference; online proof required

Delivery Schedule

Delivery/implementation timeline not specified; contract allows up to 25% quantity/duration adjustment

Penalties/Liquidated Damages

Not explicitly stated in data; standard GeM terms to apply; ensure compliance with energy dept penalties if any

Bidder Eligibility

  • Not under liquidation or similar proceedings; provide undertaking

  • Demonstrated experience in transformer protection/O&M projects

  • Sufficient financial stability with supporting statements and GST/PAN

Advertisement

Authority & Contact

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1M/S H.S ASSOCIATES   Under PMA Winner ₹33,52,920Item Categories : Operation and Maintenance Of Electrical Systems/Electrical Installations - Power Transformer Protec
L2M/S AASHIRVAD CONTRACTOR   Under PMA₹33,56,286Item Categories : Operation and Maintenance Of Electrical Systems/Electrical Installations - Power Transformer Protec
L3ARABH ELECTRICAL   Under PMA₹1,40,89,672Item Categories : Operation and Maintenance Of Electrical Systems/Electrical Installations - Power Transformer Protec

🎉 L1 Winner

M/S H.S ASSOCIATES   Under PMA

Final Price: ₹33,52,920

Reverse Auction Schedule

Completed

Start

22-Sep-2026, 12:00 pm

End

23-Sep-2026, 12:19 pm

Duration: 25 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Compliance

Yes

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

36

Experience Required

5 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Operation and Maintenance Of Electrical Systems/Electrical Installations - Power Transformer Protection and Distribution Transformer Protection work on Semi Turnkey Basis in Business Plan 2026-27 under EDC, Agra

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

12

Delivery Details

Delivery Locations

1

Delivery Cities

Agra

Delivery Pincodes

282005

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sachin Gupta282005,EDC-I , B-690 Kamla Nagar, AgraAgraUttar Pradesh2820051-Number of months for which Operations & Maintenance service is required during contract period : 4

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-9821990.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Categories 17

Corrigendum Updates

1 Update
#1

Update

08-Sep-2026

Extended Deadline

11-Sep-2026, 10:30 am

Opening Date

12-Sep-2026, 10:30 am

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates of similar transformer protection/O&M projects

4

Financial statements (audited if available)

5

EMD submission proof (FDR or online RTGS transfer receipt)

6

Technical bid documents and proposed methodology for semi turnkey protection work

7

OEM authorizations or vendor certifications if required by the energy department

8

Any undertaking confirming no liquidation or bankruptcy proceedings

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for transformer protection tender in Agra with UPPCL 2026?

Bidders must submit GST, PAN, experience certificates, financial statements, and EMD ₹35,500. Provide FDR or online RTGS proof for EMD, and ensure FDR-based security if awarded. Delivery and performance terms align with 25% scope flexibility; ensure technical approach for semi turnkey protection work.

What documents are required for Agra transformer protection bid 2026?

Submit GST registration, PAN, experience certificates of similar O&M projects, audited financials, EMD proof (FDR or online transfer), technical bid, and OEM authorizations if required. Include undertaking of non-liquidation by the bidder and ensure GST/PAN validity.

What is the EMD amount and payment method for this UP tender?

EMD is ₹35,500. Payment may be made via RTGS/online transfer to UP Power Corporation Ltd. 790 EDC, SBI Agra; provide transaction proof and bid reference in the online submission.

What are the contract variation terms for this Agra tender?

The buyer can increase or decrease contract quantity or duration up to 25% at contract issue and after issue; lump-sum scope expansions require bidder consent for service contracts.

What delivery location and scope are expected for transformer protection work?

Work is to be performed in Agra, Uttar Pradesh under the Energy Department, focusing on semi turnkey transformer protection and distribution transformer protection within the EDC Agra program.

Which payment security options are accepted for successful bidders?

Security may be furnished as Fixed Deposit Receipt (FDR) in UP Power Corporation Ltd. 790 EDC or as GeM-compliant PBG; FDR must be endorsed with bidder details and delivered to the buyer within 15 days of award.

Are there any specific brand or OEM requirements for this tender?

Data does not specify brand/OEM requirements; bidders should be prepared to propose manufacturer-agnostic protection solutions, while submitting necessary certifications and compatibility with local UP standards.

Advertisement