Progress
Indian Council Of Agricultural Research (ICAR) invites bids for a broad suite of laboratory equipment across 15 items, including Chlorophyll fluorescence meters, SPAD/chlorophyll content meters, Fibre analysers, Ultra-pure water purification systems, Table top refrigerated centrifuges, Automated Soxhlet extraction systems, Kjeldahl digestion/distillation units, Muffle furnaces, analytical balances, UV transilluminators, pH meters, PCR machines, and spectrophotometers. The procurement is structured as a single tender with flexible quantity handling (up to 25% increase/decrease at contract award and during the contract period). The estimated value and EMD are not disclosed in the available data. Key delivery terms hinge on last-date-of-original-delivery, with extension based on the option clause and minimum 30 days. Unique aspects include acceptance of an FDR-based PBG and mandatory upload of a compliance sheet and at least the documents requested in Bid ATC, with delivery and compliance obligations aligned to ICAR-IIGR, Junagadh.
15 laboratory equipment items including: Chlorophyll fluorescence meter, SPAD/chlorophyll content meter, Fibre analyser, Ultra-pure water purification system, Table top high-speed refrigerated centrifuge, Automated Soxhlet extraction system, Kjeldahl digestion/distillation unit, Muffle furnace, Analytical balance, Horizontal gel electrophoresis system, Autoclave, UV transilluminator, pH meter, PCR machine, Spectrophotometer
Delivery terms: quantity adjustments up to 25%; delivery period from last date of original delivery order with possible extensions
Security: PBG/EMD terms include acceptance of Fixed Deposit Receipt (FDR) payable to ICAR-IIGR, Junagadh; scanned FDR copy to be uploaded
Documentation: compliance sheet and Bid ATC documents required; standard bidder documents (GST, PAN, experience, financials) typically expected
Option clause allowing ±25% quantity change during contract
FDR-based PBG allowed; require scanned FDR upload and hard copy within 15 days
Mandatory compliance sheet, brochure, and Bid ATC documents submission
FDR-based security acceptable; PBG as per GeM GTC not restricted; deliverables tied to contract award and compliance with Bid ATC
Delivery period starts from last date of original delivery order; option clause can extend time with minimum 30 days, subject to quantity changes
Not specified in data; bidders should verify in Bid ATC for LD/penalty terms
Submit compliance sheet, brochure, and Bid ATC documents as per tender demands
Possess GST registration and PAN; provide experience certificates and financial statements
Acceptable security via FDR with payee name ICAR-IIGR, Junagadh; ensure scanned FDR submission within contract timelines
Quantity
15
Category
Kjeldahl digestion and distillation unit
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Chlorophyll fluorescence meter , SPAD or chlorophyll content meter , Fibre Analyzer , Ultra Pure Water Purification System , Table Top High Speed Refrigerated Centrifuge , Automated Soxhlet Extraction System , Kjeldahl digestion and distillation unit , Muffle Furnace , Analytical Balance , Horizontal Gel Electrophoresis System , Autoclave , UV Transilluminator , pH Meter , PCR Machine , Spectrophotometer
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Junagadh
Delivery Pincodes
362001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Makwana Dharmendra | 362001,ICAR-Indian Institute of Groundnut Research, PB No-5, Ivnagar Road, Junagadh, Gujarat-362001 | Junagadh | Gujarat | 362001 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Chlorophyll fluorescence meter
see Bid ATC
SPAD or chlorophyll content meter
see Bid ATC
Fibre Analyzer
see Bid ATC
Ultra Pure Water Purification System
see Bid ATC
Table Top High Speed Refrigerated Centrifuge
see Bid ATC
Automated Soxhlet Extraction System
see Bid ATC
Kjeldahl digestion and distillation unit
see Bid ATC
Muffle Furnace
see Bid ATC
Analytical Balance
see Bid ATC
Horizontal Gel Electrophoresis System
see Bid ATC
Autoclave
see Bid ATC
UV Transilluminator
see Bid ATC
pH Meter
see Bid ATC
PCR Machine
see Bid ATC
Spectrophotometer
see Bid ATC
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Chlorophyll fluorescence meter | see Bid ATC | 1 | pieces | dharmendra.dgr | 15 | |
| 2 | SPAD or chlorophyll content meter | see Bid ATC | 1 | pieces | dharmendra.dgr | 15 | |
| 3 | Fibre Analyzer | see Bid ATC | 1 | pieces | dharmendra.dgr | 15 | |
| 4 | Ultra Pure Water Purification System | see Bid ATC | 1 | pieces | dharmendra.dgr | 15 | |
| 5 | Table Top High Speed Refrigerated Centrifuge | see Bid ATC | 1 | pieces | dharmendra.dgr | 15 | |
| 6 | Automated Soxhlet Extraction System | see Bid ATC | 1 | pieces | dharmendra.dgr | 15 | |
| 7 | Kjeldahl digestion and distillation unit | see Bid ATC | 1 | pieces | dharmendra.dgr | 15 | |
| 8 | Muffle Furnace | see Bid ATC | 1 | pieces | dharmendra.dgr | 15 | |
| 9 | Analytical Balance | see Bid ATC | 1 | pieces | dharmendra.dgr | 15 | |
| 10 | Horizontal Gel Electrophoresis System | see Bid ATC | 1 | pieces | dharmendra.dgr | 15 | |
| 11 | Autoclave | see Bid ATC | 1 | pieces | dharmendra.dgr | 15 | |
| 12 | UV Transilluminator | see Bid ATC | 1 | pieces | dharmendra.dgr | 15 | |
| 13 | pH Meter | see Bid ATC | 1 | pieces | dharmendra.dgr | 15 | |
| 14 | PCR Machine | see Bid ATC | 1 | pieces | dharmendra.dgr | 15 | |
| 15 | Spectrophotometer | see Bid ATC | 1 | pieces | dharmendra.dgr | 15 |
Extended Deadline
16-Oct-2026, 3:30 am
Opening Date
17-Oct-2026, 3:30 am
Extended Deadline
13-Oct-2026, 3:30 am
Opening Date
14-Oct-2026, 3:30 am
Certificate (Requested in ATC)
OEM Authorization Certificate
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about GUJARAT tender market
Bidders should review Bid ATC, upload compliant documents (compliance sheet, brochure), and attach standard BID materials such as GST registration, PAN, experience certificates, and financial statements. FDR-based PBG is permitted, with scanned FDR uploaded and hard copy within 15 days of award.
Submit GST certificate, PAN, experience certificates, financial statements, EMD/ security documents, technical compliance certificates, and OEM authorizations. Also upload the compliance sheet and Bid ATC documents as requested; ensure FDR is available for PBG if used.
Delivery is tied to the last date of the original delivery order, with option-based extensions. If quantity increases, additional time is calculated as (additional/original) × original delivery period, with a minimum of 30 days.
EMD specifics are not disclosed in the data; bidders should expect standard EMD terms or an alternative security like FDR as described in the GeM ATC. Upload a compliant security document if required.
The tender data does not list exact standards; bidders should anticipate ISI/ISO compliance and OEM authorizations as part of technical bids. Verify in Bid ATC and supply certificates for all 15 listed equipment categories.
Obtain an FDR in favor of Director ICAR-IIGR, Junagadh, pledged with consent to withdraw on demand; upload scanned copy of the FDR and deliver the original to ICAR-IIGR within 15 days of award.
The tender data provided does not include explicit deadlines; bidders should monitor GeM portal for bid submission deadlines and verify in Bid ATC for any indicative dates and submission windows.
Up to 25% variation is allowed for both initial order quantity and during contract currency, with the extension time calculated by the specified formula and minimum 30 days.