Quantity

310

Category

FLEXIBLE COUPLING ASSEMBLY

Bid Type

Two Packet Bid

Categories 53

Neyveli Uttar Pradesh Power Limited has released a public tender for BEARING FOR S BELL, SAND COLLER, SEAL RING, IMPELLER LOCK COLLET, BEARING FOR BOWL, BEARING FOR D CASE, PUMP SHAFT, PUMP SHAFT COUPLING, BOTTOM LINE SHAFT, BEARING RETAINER, LINE SHAFT BEARING, LINE SHAFT SLEEVE, LINE SHAFT COUPLING, HEAD SHAFT WITH KEY, PACKING BOX, BEARING FOR PACKING BOX, PACKING, LANTERN RING, PACKING GLAND, WATER DEFLECTOR, WAER RING, ADJUSTING NUT, FLEXIBLE COUPLING, 1 TBH ASSLY, CUTLESS BUSH, THRUST RING, THRUST RING RETAINER, LINER SUCTION BELL, KEY, LINE SHAFT, SHAFT COUPLING, SLEEVE, BUSH, DEFLECTOR, HEAD SHAFT, GLAND SPLIT, RETAINER PLATE, THRUST BEARING HOUSING, IMPELLER SEAL RING, SHAFT COULING LINE SHAFT, FLEXIBLE COUPLING ASSEMBLY, PIN BUSH COUPLING, THRUST BEARINH ASSEMBLY, SHAFT COUPLING SLEEVE, LINE SHAFT BUSH, BUSH BEARING HOUSING, STUFFING BOX BUSH, PUMP SHAFT SLEEVE, COOLING TUBE, STUFFING BOX, IMPELLER, IMPELLER NUT, CASING in KANPUR DEHAT, UTTAR PRADESH. Quantity: 310. Submission Deadline: 09-09-2025 15: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

BEARING FOR S BELL , SAND COLLER , SEAL RING , IMPELLER LOCK COLLET , BEARING FOR BOWL , BEARING FOR D CASE , PUMP SHAFT , PUMP SHAFT COUPLING , BOTTOM LINE SHAFT , BEARING RETAINER , LINE SHAFT BEARING , LINE SHAFT SLEEVE , LINE SHAFT COUPLING , HEAD SHAFT WITH KEY , PACKING BOX , BEARING FOR PACKING BOX , PACKING , LANTERN RING , PACKING GLAND , WATER DEFLECTOR , WAER RING , ADJUSTING NUT , FLEXIBLE COUPLING , 1 TBH ASSLY , CUTLESS BUSH , THRUST RING , THRUST RING RETAINER , LINER SUCTION BELL , KEY , LINE SHAFT , SHAFT COUPLING , SLEEVE , BUSH , DEFLECTOR , HEAD SHAFT , GLAND SPLIT , RETAINER PLATE , THRUST BEARING HOUSING , IMPELLER SEAL RING , SHAFT COULING LINE SHAFT , FLEXIBLE COUPLING ASSEMBLY , PIN BUSH COUPLING , THRUST BEARINH ASSEMBLY , SHAFT COUPLING SLEEVE , LINE SHAFT BUSH , BUSH BEARING HOUSING , STUFFING BOX BUSH , PUMP SHAFT SLEEVE , COOLING TUBE , STUFFING BOX , IMPELLER , IMPELLER NUT , CASING

Authority Records

MINISTRY OF COAL

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8212801.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 154 Items Sign in for GEM prices

#1

BEARING FOR S BELL

As per technical data sheet

1 nos Delivery: 168 days
#2

SAND COLLER

As per technical data sheet

1 nos Delivery: 168 days
#3

SEAL RING

As per technical data sheet

1 nos Delivery: 168 days
#4

IMPELLER LOCK COLLET

As per technical data sheet

2 nos Delivery: 168 days
#5

BEARING FOR BOWL

As per technical data sheet

2 nos Delivery: 168 days
#6

BEARING FOR BOWL

As per technical data sheet

2 nos Delivery: 168 days
#7

BEARING FOR D CASE

As per technical data sheet

1 nos Delivery: 168 days
#8

PUMP SHAFT

As per technical data sheet

1 nos Delivery: 168 days
#9

PUMP SHAFT COUPLING

As per technical data sheet

1 nos Delivery: 168 days
#10

BOTTOM LINE SHAFT

As per technical data sheet

1 nos Delivery: 168 days
#11

BEARING RETAINER

As per technical data sheet

1 nos Delivery: 168 days
#12

LINE SHAFT BEARING

As per technical data sheet

1 nos Delivery: 168 days
#13

LINE SHAFT SLEEVE

As per technical data sheet

1 nos Delivery: 168 days
#14

LINE SHAFT COUPLING

As per technical data sheet

1 nos Delivery: 168 days
#15

HEAD SHAFT WITH KEY

As per technical data sheet

1 nos Delivery: 168 days
#16

PACKING BOX

As per technical data sheet

1 nos Delivery: 168 days
#17

BEARING FOR PACKING BOX

As per technical data sheet

1 nos Delivery: 168 days
#18

PACKING

As per technical data sheet

1 nos Delivery: 168 days
#19

LANTERN RING

As per technical data sheet

1 nos Delivery: 168 days
#20

PACKING GLAND

As per technical data sheet

1 nos Delivery: 168 days
#21

WATER DEFLECTOR

As per technical data sheet

1 nos Delivery: 168 days
#22

WAER RING

As per technical data sheet

1 nos Delivery: 168 days
#23

ADJUSTING NUT

As per technical data sheet

1 nos Delivery: 168 days
#24

FLEXIBLE COUPLING

As per technical data sheet

1 nos Delivery: 168 days
#25

BEARING FOR S BELL

As per technical data sheet

1 nos Delivery: 168 days
#26

SEAL RING

As per technical data sheet

7 nos Delivery: 168 days
#27

IMPELLER LOCK COLLET

As per technical data sheet

7 nos Delivery: 168 days
#28

BEARING FOR BOWL

As per technical data sheet

7 nos Delivery: 168 days
#29

BEARING FOR BOWL

As per technical data sheet

7 nos Delivery: 168 days
#30

BEARING FOR D CASE

As per technical data sheet

1 nos Delivery: 168 days
#31

PUMP SHAFT

As per technical data sheet

1 nos Delivery: 168 days
#32

PUMP SHAFT COUPLING

As per technical data sheet

1 nos Delivery: 168 days
#33

BOTTOM LINE SHAFT

As per technical data sheet

1 nos Delivery: 168 days
#34

BEARING RETAINER

As per technical data sheet

1 nos Delivery: 168 days
#35

LINE SHAFT BEARING

As per technical data sheet

1 nos Delivery: 168 days
#36

LINE SHAFT SLEEVE

As per technical data sheet

1 nos Delivery: 168 days
#37

LINE SHAFT COUPLING

As per technical data sheet

1 nos Delivery: 168 days
#38

HEAD SHAFT WITH KEY

As per technical data sheet

1 nos Delivery: 168 days
#39

PACKING BOX

As per technical data sheet

1 nos Delivery: 168 days
#40

BEARING FOR PACKING BOX

As per technical data sheet

1 nos Delivery: 168 days
#41

PACKING

As per technical data sheet

1 nos Delivery: 168 days
#42

LANTERN RING

As per technical data sheet

1 nos Delivery: 168 days
#43

PACKING GLAND

As per technical data sheet

1 nos Delivery: 168 days
#44

WATER DEFLECTOR

As per technical data sheet

1 nos Delivery: 168 days
#45

1 TBH ASSLY

As per technical data sheet

1 nos Delivery: 168 days
#46

WAER RING

As per technical data sheet

1 nos Delivery: 168 days
#47

FLEXIBLE COUPLING

As per technical data sheet

1 nos Delivery: 168 days
#48

BEARING FOR S BELL

As per technical data sheet

1 nos Delivery: 168 days
#49

SEAL RING

As per technical data sheet

17 nos Delivery: 168 days
#50

IMPELLER LOCK COLLET

As per technical data sheet

17 nos Delivery: 168 days
#51

BEARING FOR BOWL

As per technical data sheet

17 nos Delivery: 168 days
#52

BEARING FOR D CASE

As per technical data sheet

1 nos Delivery: 168 days
#53

PUMP SHAFT

As per technical data sheet

1 nos Delivery: 168 days
#54

PUMP SHAFT COUPLING

As per technical data sheet

1 nos Delivery: 168 days
#55

BOTTOM LINE SHAFT

As per technical data sheet

1 nos Delivery: 168 days
#56

BEARING RETAINER

As per technical data sheet

1 nos Delivery: 168 days
#57

LINE SHAFT BEARING

As per technical data sheet

1 nos Delivery: 168 days
#58

LINE SHAFT SLEEVE

As per technical data sheet

1 nos Delivery: 168 days
#59

LINE SHAFT COUPLING

As per technical data sheet

1 nos Delivery: 168 days
#60

HEAD SHAFT WITH KEY

As per technical data sheet

1 nos Delivery: 168 days
#61

PACKING BOX

As per technical data sheet

1 nos Delivery: 168 days
#62

BEARING FOR PACKING BOX

As per technical data sheet

1 nos Delivery: 168 days
#63

PACKING

As per technical data sheet

1 nos Delivery: 168 days
#64

LANTERN RING

As per technical data sheet

1 nos Delivery: 168 days
#65

PACKING GLAND

As per technical data sheet

1 nos Delivery: 168 days
#66

WATER DEFLECTOR

As per technical data sheet

1 nos Delivery: 168 days
#67

1 TBH ASSLY

As per technical data sheet

1 nos Delivery: 168 days
#68

ADJUSTING NUT

As per technical data sheet

1 nos Delivery: 168 days
#69

WAER RING

As per technical data sheet

1 nos Delivery: 168 days
#70

CUTLESS BUSH

As per technical data sheet

1 nos Delivery: 168 days
#71

THRUST RING

As per technical data sheet

1 nos Delivery: 168 days
#72

THRUST RING RETAINER

As per technical data sheet

1 nos Delivery: 168 days
#73

LINER SUCTION BELL

As per technical data sheet

1 nos Delivery: 168 days
#74

KEY

As per technical data sheet

1 nos Delivery: 168 days
#75

PUMP SHAFT

As per technical data sheet

1 nos Delivery: 168 days
#76

CUTLESS BUSH

As per technical data sheet

1 nos Delivery: 168 days
#77

LINE SHAFT

As per technical data sheet

1 nos Delivery: 168 days
#78

SHAFT COUPLING

As per technical data sheet

3 nos Delivery: 168 days
#79

SLEEVE

As per technical data sheet

4 nos Delivery: 168 days
#80

CUTLESS BUSH

As per technical data sheet

4 nos Delivery: 168 days
#81

PACKING

As per technical data sheet

4 nos Delivery: 168 days
#82

LANTERN RING

As per technical data sheet

4 nos Delivery: 168 days
#83

PACKING BOX

As per technical data sheet

1 nos Delivery: 168 days
#84

BUSH

As per technical data sheet

1 nos Delivery: 168 days
#85

DEFLECTOR

As per technical data sheet

1 nos Delivery: 168 days
#86

HEAD SHAFT

As per technical data sheet

1 nos Delivery: 168 days
#87

SLEEVE

As per technical data sheet

1 nos Delivery: 168 days
#88

GLAND SPLIT

As per technical data sheet

1 nos Delivery: 168 days
#89

RETAINER PLATE

As per technical data sheet

1 set Delivery: 168 days
#90

THRUST BEARING HOUSING

As per technical data sheet

1 nos Delivery: 168 days
#91

BEARING FOR S BELL

As per technical data sheet

1 nos Delivery: 168 days
#92

SAND COLLER

As per technical data sheet

1 nos Delivery: 168 days
#93

SEAL RING

As per technical data sheet

1 nos Delivery: 168 days
#94

IMPELLER LOCK COLLET

As per technical data sheet

3 nos Delivery: 168 days
#95

BEARING FOR BOWL

As per technical data sheet

3 nos Delivery: 168 days
#96

BEARING FOR BOWL

As per technical data sheet

3 nos Delivery: 168 days
#97

BEARING FOR D CASE

As per technical data sheet

1 nos Delivery: 168 days
#98

PUMP SHAFT

As per technical data sheet

1 nos Delivery: 168 days
#99

PUMP SHAFT COUPLING

As per technical data sheet

1 nos Delivery: 168 days
#100

BOTTOM LINE SHAFT

As per technical data sheet

1 nos Delivery: 168 days
#101

BEARING RETAINER

As per technical data sheet

1 nos Delivery: 168 days
#102

LINE SHAFT BEARING

As per technical data sheet

1 nos Delivery: 168 days
#103

LINE SHAFT SLEEVE

As per technical data sheet

1 nos Delivery: 168 days
#104

LINE SHAFT COUPLING

As per technical data sheet

1 nos Delivery: 168 days
#105

HEAD SHAFT WITH KEY

As per technical data sheet

1 nos Delivery: 168 days
#106

PACKING BOX

As per technical data sheet

1 nos Delivery: 168 days
#107

BEARING FOR PACKING BOX

As per technical data sheet

1 nos Delivery: 168 days
#108

PACKING

As per technical data sheet

1 nos Delivery: 168 days
#109

LANTERN RING

As per technical data sheet

1 nos Delivery: 168 days
#110

PACKING GLAND

As per technical data sheet

1 nos Delivery: 168 days
#111

WATER DEFLECTOR

As per technical data sheet

1 nos Delivery: 168 days
#112

WAER RING

As per technical data sheet

1 nos Delivery: 168 days
#113

ADJUSTING NUT

As per technical data sheet

1 nos Delivery: 168 days
#114

FLEXIBLE COUPLING

As per technical data sheet

1 nos Delivery: 168 days
#115

CUTLESS BUSH

As per technical data sheet

1 nos Delivery: 168 days
#116

IMPELLER SEAL RING

As per technical data sheet

1 nos Delivery: 168 days
#117

THRUST RING

As per technical data sheet

1 nos Delivery: 168 days
#118

THRUST RING RETAINER

As per technical data sheet

1 nos Delivery: 168 days
#119

KEY

As per technical data sheet

1 nos Delivery: 168 days
#120

PUMP SHAFT COUPLING

As per technical data sheet

1 nos Delivery: 168 days
#121

CUTLESS BUSH

As per technical data sheet

1 nos Delivery: 168 days
#122

LINE SHAFT

As per technical data sheet

5 nos Delivery: 168 days
#123

SHAFT COULING LINE SHAFT

As per technical data sheet

5 nos Delivery: 168 days
#124

SLEEVE

As per technical data sheet

5 nos Delivery: 168 days
#125

CUTLESS BUSH

As per technical data sheet

5 nos Delivery: 168 days
#126

PACKING

As per technical data sheet

1 nos Delivery: 168 days
#127

PACKING BOX

As per technical data sheet

1 nos Delivery: 168 days
#128

BUSH

As per technical data sheet

1 nos Delivery: 168 days
#129

DEFLECTOR

As per technical data sheet

1 nos Delivery: 168 days
#130

HEAD SHAFT

As per technical data sheet

1 nos Delivery: 168 days
#131

SLEEVE

As per technical data sheet

1 nos Delivery: 168 days
#132

GLAND SPLIT

As per technical data sheet

1 nos Delivery: 168 days
#133

THRUST BEARING HOUSING

As per technical data sheet

1 nos Delivery: 168 days
#134

FLEXIBLE COUPLING ASSEMBLY

As per technical data sheet

1 nos Delivery: 168 days
#135

ADJUSTING NUT

As per technical data sheet

1 nos Delivery: 168 days
#136

WAER RING

As per technical data sheet

1 nos Delivery: 168 days
#137

KEY

As per technical data sheet

1 nos Delivery: 168 days
#138

PIN BUSH COUPLING

As per technical data sheet

2 nos Delivery: 168 days
#139

THRUST BEARINH ASSEMBLY

As per technical data sheet

2 nos Delivery: 168 days
#140

PACKING BOX

As per technical data sheet

2 nos Delivery: 168 days
#141

HEAD SHAFT

As per technical data sheet

2 nos Delivery: 168 days
#142

SHAFT COUPLING SLEEVE

As per technical data sheet

5 nos Delivery: 168 days
#143

LINE SHAFT SLEEVE

As per technical data sheet

8 nos Delivery: 168 days
#144

LINE SHAFT BUSH

As per technical data sheet

8 nos Delivery: 168 days
#145

BUSH BEARING HOUSING

As per technical data sheet

4 nos Delivery: 168 days
#146

LINE SHAFT

As per technical data sheet

2 nos Delivery: 168 days
#147

PUMP SHAFT

As per technical data sheet

2 nos Delivery: 168 days
#148

STUFFING BOX BUSH

As per technical data sheet

5 nos Delivery: 168 days
#149

PUMP SHAFT SLEEVE

As per technical data sheet

5 nos Delivery: 168 days
#150

COOLING TUBE

As per technical data sheet

8 set Delivery: 168 days
#151

STUFFING BOX

As per technical data sheet

2 nos Delivery: 168 days
#152

IMPELLER

As per technical data sheet

2 nos Delivery: 168 days
#153

IMPELLER NUT

As per technical data sheet

2 nos Delivery: 168 days
#154

CASING

As per technical data sheet

1 nos Delivery: 168 days

Required Documents

1

Certificate (Requested in ATC)

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC)

4

Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

26-Aug-2025

Technical Results

S.No Seller Item Date Status
1
WPIL LIMITED   Under PMA
-08-09-2025 10:45:22

Financial Results

Rank Seller Price Item
L1
WPIL LIMITED(MII)   Under PMA
Item Categories : BEARING FOR S BELL,SAND COLLER,SEAL RING,IMPELLER LOCK COLLET,BEARING FOR BOWL,BEARING FOR BOWL,BEA

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.