Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 25 m3hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Tube Well No. 4 of Gun Sankrul Wate
PHE
📍 MALDAH, WEST BENGAL