TenderDekho Logo
Active GEM

Bharat Petroleum Corporation Ltd 3/2 Inch Pipeline Components Tender Shahjahanpur UP 2026-28

Bid Publish Date

19-Oct-2026, 12:55 pm

Bid End Date

02-Nov-2026, 1:00 pm

Progress

Issue19-Oct-2026, 12:55 pm
AwardPending

Key Highlights

  • • Brand/OEM requirements: Not specified in public data; bidders should verify against ATC.
  • • Technical standards: No explicit standards in data; ATC may specify IS/ISO requirements.
  • • Special clauses: 25% quantity variation rights; extension timing calculations (quantity/original quantity) × original delivery period with min 30 days.
  • • Eligibility: BPCL procurement requires compliance with ATC; bidder must review to ensure alignment with BPCL terms.

Tender Overview

Bharat Petroleum Corporation Ltd invites submission for procurement related to 3 inch and 2 inch pipeline components across multiple years (2026-28) at Shahjahanpur, Uttar Pradesh 242001. The BOQ lists 6 items with unspecified quantities, while the buyer reserves a up-to-25% quantity variation during contract execution. The tender emphasizes delivery scheduling linked to the original delivery order and extended periods, with additional time calculated as a function of quantity variation. The ATC terms are attached by the buyer, indicating compliance expectations and optional clause usage. This opportunity targets suppliers with experience in pipeline components and the ability to adapt to variable orders at contracted rates.

Key differentiator includes the option to scale quantity by up to 25% and the need to align with atc-documented terms for delivery timing and price consistency. The tender’s lack of explicit item specs suggests bidders may need to rely on the ATC and supplier capabilities to demonstrate compliance with BPCL standards.

Technical Specifications & Requirements

  • No formal specifications are provided in the public BoQ. The procurement focuses on 3 inch and 2 inch pipeline components for BPCL’s Shahjahanpur operations.
  • Tender includes an ATC document uploaded by the buyer for bidder interpretation and compliance.
  • The contract contemplates multiple items with unspecified quantities, requiring bidders to review the ATC and respond with a compliant technical bid aligned to BPCL standards.
  • Bidders should prepare for delivery scheduling per the original delivery order and potential extensions up to the calculated duration.
  • Emphasis on price stability under contracted rates for any quantity upscaling.

Terms, Conditions & Eligibility

  • Option Clause: Up to 25% quantity increases during contract execution at contracted rates.
  • Delivery period rules: commence from the last date of original delivery order; extended durations apply per the option clause with minimum 30 days.
  • Bid compliance with the ATC is mandatory; supplier must review the uploaded ATC document.
  • 6-item BOQ with unspecified quantities requires careful bid structuring to cover diverse scenarios.
  • BPCL reserves rights to modify scope and ensure delivery timelines are met under contract terms.

Key Specifications

  • Product/service: pipeline components (3 inch and 2 inch)

  • Quantity: 6 items in BoQ with notional quantities

  • Estimated value: Not specified; contract values to be determined via ATC

  • Experience: Suppliers with BPCL or similar sector experience preferred

  • Standards: ATC to define required standards and certifications

  • Delivery: Schedule tied to last date of original delivery order with extension rules

Terms & Conditions

  • 25% quantity variation allowed at contracted rates

  • Delivery period starts after original delivery order date

  • Extension period calculated as (increased quantity ÷ original quantity) × original delivery period, min 30 days

  • Review and compliance with uploaded ATC document is mandatory

Important Clauses

Payment Terms

Payment terms are governed by BPCL ATC; specifics to be confirmed in contract.

Delivery Schedule

Delivery begins from the last date of the original delivery order; extension applies per option clause with minimum 30 days.

Penalties/Liquidated Damages

Penalties, LD, or performance bonds to be defined in ATC and contract.

Bidder Eligibility

  • Experience in supplying pipeline components (3 inch and 2 inch) to energy or refinery sector

  • Valid GST registration and PAN

  • Financial stability evidenced by recent financial statements

  • Capability to handle up to 25% quantity variation at contracted rates

Advertisement

Tender Data

Bid Details

Quantity

69

Category

3 inch 2026 27

Bid Type

Two Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

15

OEM Avg. Turnover

30

Past Performance

80 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

3 inch 2026 27 , 2 inch 2026 27 , 3 inch 2027 28 , 2 inch 2027 28 , 3 inch 2028 29 , 2 inch 2028 29

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

42

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Shahjahanpur

Delivery Pincodes

242307

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Prankur Yadav242307,Banthra Depot, Near Banthra Railway Station, Village BanthraShahjahanpurUttar Pradesh2423071630-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10055653.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

3 inch 2026 27

metering unit IDEX make

16 pieces Delivery: 30 days
#2

2 inch 2026 27

metering unit IDEX make

7 pieces Delivery: 30 days
#3

3 inch 2027 28

metering unit IDEX make

16 pieces Delivery: 30 days
#4

2 inch 2027 28

metering unit IDEX make

7 pieces Delivery: 30 days
#5

3 inch 2028 29

metering unit IDEX make

16 pieces Delivery: 30 days
#6

2 inch 2028 29

metering unit IDEX make

7 pieces Delivery: 30 days
Advertisement

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates in pipeline components supply

4

Financial statements and turnover evidence

5

EMD/Security deposit documentation (as per ATC)

6

Technical bid documents demonstrating compliance with BPCL ATC

7

OEM authorizations or dealership certificates (if applicable)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for BPCL pipeline components tender in Shahjahanpur UP 2026?

Bidders must submit GST, PAN, experience certificates, financial statements, and EMD as per the ATC. Review the uploaded ATC for exact standards and delivery terms; ensure 3 inch and 2 inch components match BPCL requirements and note the 25% quantity variation allowance during contract execution.

What documents are required to participate in BPCL Shahjahanpur tender?

Required documents include GST registration, PAN, experience certificates in pipeline supply, financial statements, EMD documentation, OEM authorizations if applicable, and technical bid demonstrating ATC compliance. All documents must align with BPCL ATC instructions in the tender portal.

What are the delivery timeframes and extension rules for this BPCL tender?

Delivery period starts from the last date of the original delivery order. If quantity increases, extended time is (increased quantity ÷ original quantity) × original period, with a minimum of 30 days; BPCL may adjust durations within contract terms.

What standards or certifications are required for BPCL pipeline supplies?

Standards are defined in the ATC; bidders must ensure compliance with all BPCL-specified standards and obtain any required certifications before submission. Exact IS/ISO requirements will be stated in the ATC document.

How is the EMD amount determined for BPCL Shahjahanpur tender?

EMD requirements are defined in the ATC attached to the tender; bidders must submit the specified EMD in the prescribed format and payment mode to be eligible for technical bid evaluation.

What is the scope of quantity variation allowed in this BPCL procurement?

BPCL permits up to 25% variation in order quantity at contracted rates during both initial and currency of contract. Suppliers should price for scalable quantities and confirm ATC terms for price adjustments.

Which items are covered under the BPCL Shahjahanpur BoQ and how are quantities shown?

The BoQ includes six items related to pipeline components; however, explicit quantities are not disclosed publicly. Bidders should rely on the ATC and submit a bid covering all six items with adaptable quantities per BPCL terms.

What are the key eligibility criteria for BPCL 2026 pipeline tender?

Eligibility includes valid GST/PAN, verifiable experience in pipeline component supply, financial stability demonstrated by statements, and willingness to comply with ATC terms, including delivery extensions and quantity variation.

Advertisement