Bid Publish Date
07-Oct-2026, 7:28 pm
Bid End Date
17-Oct-2026, 8:00 pm
Location
Progress
The Indian Coast Guard, under the Department of Defence, invites bids for the supply, installation and fitment of Poly Vinyl Carbonate (PVC) panels on the front walls of a Centralized AC room at the Damãοn (Daman & Diu 396210) facility. The scope includes procurement, on-site installation and integration with existing AC infrastructure. The Seller must adhere to the option clause allowing up to 25% quantity variation at contracted rates, with delivery time calculated from the last date of the original delivery order. The bidding process requires uploading the Schedule of Requirement/Scope of Work in the TEC portal. No BOQ items are listed, signaling a streamlined scope with potential for scale-up within contractual limits.
Option to increase quantity up to 25% under contract
Delivery period calculation with minimum 30 days
Mandatory TEC upload of Schedule of Requirement/Scope of Work
No BOQ items listed; focus on PVC panel supply and installation
ATC terms require bidder compliance with specified conditions
Not explicitly published in available data; bidders should consult TEC ATC for payment schedule and milestones after contract award.
Delivery period calculated from last date of original delivery order; extended period allowed proportionally with 30-day minimum.
No LD details published; bidders must reference ATC for any potential penalties or performance bonds.
Experience in supply and on-site installation of interior panels or HVAC room refurbishments
Ability to upload Schedule of Requirement/Scope of Work in TEC
Compliant with standard GST and PAN documentation; OEM authorization if required
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Supply, Installation and Fitment of Poly Vinyl Carbonate Panelsan front walls of Centralized AC room
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Daman
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Daman | Daman | - | - | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply and installation projects
Financial statements or turnover proof (where applicable)
EMD/Security deposit documentation (if published in ATC/TEC)
Technical bid documents and compliance statements
OEM authorization (if applicable)
Key insights about DAMAN & DIU tender market
To participate in the PVC panels tender in Damán, submit the TEC Schedule of Requirement/Scope of Work, provide GST and PAN, and include experience certificates for similar installations. The bid allows up to 25% quantity variation and requires compliance with the ATC delivery formula and on-site fitment of PVC panels.
Required documents include GST registration, PAN card, experience certificates for similar supply/installation projects, financial statements, EMD documents if published, technical bid documents, and OEM authorizations where applicable. Ensure Schedule of Requirement is uploaded in TEC as instructed.
Delivery begins from the last date of the original delivery order. If quantity is increased, the additional time is calculated as (additional/original quantity) × original delivery period, with a minimum of 30 days; extended periods may apply per the option clause.
No BOQ items are listed in the available data. Bidders should rely on the Schedule of Requirement/Scope of Work uploaded in TEC and align procurement, supply, and installation accordingly.
Scope includes supply, installation and fitment of Poly Vinyl Carbonate panels on the front walls of a Centralized AC room, with on-site integration into the existing HVAC setup and adherence to the contractor’s Schedule of Requirement.
Bidders must upload the Schedule of Requirement in TEC, accept the 25% variation clause, and follow delivery calculations with a 30-day minimum, as described in the ATC terms. Ensure all documents conform to the portal’s requirements.
Yes. The purchaser reserves the right to increase ordered quantity up to 25% during contract and currency at contracted rates, with delivery timing recalculated per the specified formula and a minimum 30-day period.
The Schedule of Requirement/Scope of Work must be uploaded in TEC as per Buyer Added ATC. Verifying the latest upload location in the portal ensures compliance and enhances bid eligibility.