Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Flowmore DMCW Pump Spares Tender Sonbhadra Uttar Pradesh 2026

Bid Publish Date

29-Aug-2026, 10:19 am

Bid End Date

08-Sep-2026, 11:00 am

Progress

Issue29-Aug-2026, 10:19 am
AwardPending

Key Highlights

  • Flowmore DMCW pump spare parts requirement for 2x660MW plant at UP state power facility
  • 25% quantity variation right during contract and currency; extended delivery time rules
  • ATC document to be viewed for specific terms and conditions
  • No BOQ items listed; low visibility on EMD, turnover, or delivery schedule in provided data

Tender Overview

Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl), Lucknow. Procurement: Spares for Flowmore make DMCW pump used in 2x660MW thermal power plant. Location: Sonbhadra, Uttar Pradesh 231205. Quantities/Value: Not disclosed; BOQ shows 0 items, but delivery may be governed by option clause. Context: Government utility procurement for critical plant spares; flexible quantity adjustments possible up to 25% during contract. Distinguished by Flowmore brand compatibility and IS/standards implied via ATC.

Technical Specifications & Requirements

  • Product/Service: Spares for Flowmore DMCW pump units, retrofit/repair components for 2x660MW facility.
  • Scope Notes: No explicit technical specs published in BOQ; ATC document referenced by buyer.
  • Delivery/Timeline: Delivery period linked to original delivery order; option clause allows 25% quantity variation with time adjustments calculated as (additional/original) × original delivery period, minimum 30 days.
  • Compliance: Vendors must adhere to ATC terms; detailed criteria likely in uploaded ATC file.
  • Eligibility Signals: Flowmore pump spare knowledge or OEM alignment implied; no explicit EMD or turnover data shown.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity up to 25% of bid quantity; extended delivery time governed by (additional quantity/original quantity) × original period, min 30 days; may extend up to original delivery period.
  • Delivery Terms: Delivery start tied to last date of original delivery order; extensions based on option exercise.
  • Submission & ATC: ATC document uploaded by buyer; bidders must view and comply with it.
  • Documentation: Not specified in BOQ; bidders should prepare standard supply bid documents and OEM authorization as applicable.

Key Specifications

  • Product/service: Flowmore DMCW pump spares for 2x660MW plant

  • Quantity: Not disclosed; quantity variation up to 25% allowed

  • Standards/certification: Not specified in data; refer to ATC for exact requirements

  • Delivery: From last date of original delivery order; extended period as per option clause

  • Warranty/after-sale: Not specified in data; check ATC

Terms & Conditions

  • Option to adjust quantity up to 25% during contract

  • Delivery timing tied to original order date with computed extensions

  • ATC document governs detailed terms and submission requirements

Important Clauses

Delivery Extension

Additional time = (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days; may extend up to original delivery period.

Bidder Eligibility

  • Experience in supplying spare parts for large-scale thermal power plant pumps

  • Financial capacity to meet bid requirements (solvency/turnover to be verified in ATC)

  • Ability to comply with Flowmore OEM/ATC specifications

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Spares of“ Flowmore” make DMCW Pump for 2x660MW Thermal Power Plant

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Sonbhadra

Delivery Pincodes

231219

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sunil Kumar Gangwar231219,Obra Thermal Power PlantSonbhadraUttar Pradesh2312191120-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9813532.pdf

Main Document

Technical Specification/Buyer Specification Document

TECHNICAL

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow

Office Name

Lucknow

Grievance Contact

[email protected]

Categories 4

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar pump spare supply

4

Financial statements or solvency proof

5

EMD/Security deposit documents (as per ATC)

6

Technical bid documents and OEM authorization

7

Any ISI/ISO certifications or Flowmore OEM approvals if required by ATC

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid on Flowmore pump spares tender in Sonbhadra?

Bidders must view the ATC document uploaded by the buyer and submit standard bid documents: GST, PAN, experience certificates, financials, EMD as per ATC, and OEM authorizations. Ensure Flowmore DMCW spare alignment and any required certifications are included to demonstrate OEM compatibility and warranty support. Follow delivery timeframes per original order and option clause.

What documents are required for the Flowmore spares tender in Uttar Pradesh?

Submit GST registration, PAN card, experience certificates of similar pump spare supply, latest financial statements, EMD documents, technical bid, and OEM authorization. Include any Flowmore OEM approvals specified in the ATC and copy of any applicable ISI/ISO certifications if requested.

What is the quantity adjustment rule for this UP tender?

The purchaser may increase or decrease the bid quantity up to 25% of the bid quantity. If exercised during currency, delivery time is recalculated as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days.

What delivery timeline applies to Flowmore pump spares in this tender?

Delivery begins from the last date of the original delivery order. In case of extension, the additional time follows the 25% quantity variation formula, with a minimum 30 days and potential extension to the original delivery period as per option clause.

Which standards or certifications are required for Flowmore spares?

Exact standards are not published in BOQ; bidders must refer to the ATC document for required certifications and OEM approvals. Typically, OEM alignment with Flowmore and any relevant safety/quality certifications must be demonstrated in the technical bid.

What are the key eligibility criteria for spare parts suppliers in this UP tender?

Eligibility includes proven experience supplying large-scale pump spares for thermal power plants, financial solvency to withstand bid requirements, and OEM authorization showing capability to supply Flowmore DMCW spares. Compliance with ATC terms and delivery performance history are also critical.

How to ensure compliance with ATC terms for this spares tender?

Access the uploaded ATC document, review item-specific requirements, and align your bid with scope, delivery timelines, and any special conditions. Include OEM authorization, Flowmore compatibility statements, and any required quality/after-sale terms to strengthen technical bid compliance.

When will the supplier know the exact EMD and BOQ details?

Exact EMD amounts and BOQ specifics are disclosed in the ATC and tender upload. Prepare to submit EMD as directed and await the ATC for itemized spare parts list, quantities, and payment terms to finalize bid submission.