Organization: Iisco Steel Plant, under Steel Authority of India Limited (SAIL). Procurement: MICRO CONCRETE conforming to ASTM C1107. Location: not specified in the notice; tender is part of SAIL procurement framework in India. Quantity/Value: not disclosed; no BOQ items listed. Context: aligns with SAIL’s concrete material supply requirements; emphasis on standard-driven supply. Unique aspect: explicit ASTM C1107 standard reference; no itemized BOQ available, signaling a generic material supply tender rather than a fixed schedule.
Product category: MICRO CONCRETE
Standard: ASTM C1107
Invoicing: consignee name with GSTIN
GST terms: actuals or applicable rate (whichever lower) on quoted GST
Vendor code creation documents
No BoQ items available in current notice
GST handling and invoicing to consignee GSTIN
Mandatory PAN, GSTIN, Cancelled Cheque, EFT Mandate
OEM authorization required for manufacturer bidders
GST payable by bidder; reimbursement as actuals or as per applicable rate, whichever is lower, within the quoted GST percentage
Not specified in the notice; bidders should await detailed tender schedule post-clarifications
Not specified in the notice; check standard SAIl terms in the complete RFP
Must have PAN and GSTIN registered in India
OEM/Manufacturer Authorization if using authorized distributor
Ability to issue invoices in consignee GSTIN
Quantity
10
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
Yes (Mediation clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
MICRO CONCRETE, ASTM C1107
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Paschim Bardhaman
Delivery Pincodes
713325
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sanjoy Kumar Maji | 713325,Materials Management Dept. IISCO Steel Plant Burnpur | Paschim Bardhaman | West Bengal | 713325 | 10 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN registration copy
Cancelled cheque copy
EFT Mandate certified by bank
Manufacturer Authorization/OEM authorization (if bidding through authorized distributor)
Bidders must meet basic requirements including PAN, GSTIN, Cancelled Cheque, and EFT Mandate. If bidding via an authorized distributor, submit OEM authorization. Invoices must be issued to the consignee GSTIN, and GST will be reimbursed at actuals or the lower applicable rate. Detailed technical specs will be released in the RFP addendum.
Submit: PAN Card copy, GSTIN copy, Cancelled Cheque, EFT Mandate certified by bank, and Manufacturer Authorization if bidding through OEM/distributor. Ensure the invoice is raised in the consignee’s name with their GSTIN. GST handling follows actuals or lower rate per quoted GST.
The tender references ASTM C1107 for micro concrete. Suppliers must ensure raw material and finished mix comply with this standard. No other standards are listed in the current notice; verify in the official RFP addendum for any supplementary specs.
No BoQ items are listed in the current notice, indicating either open-scope supply or pending data release. Await the detailed tender document or addenda for quantity ranges, delivery volumes, and location-specific requirements.
GST payment terms indicate bidder bears GST, with reimbursement either actuals or as per applicable rates, whichever is lower, within the quoted percentage. No advance payment or milestone terms are listed in the notice; confirm in the final contract.
Submit standard vendor onboarding documents including PAN, GSTIN, Cancelled Cheque, EFT Mandate, and OEM authorization if applicable. This enables vendor code creation and participation in the SAIl procurement workflow.
Invoices must be issued in the consignee’s name with the consignee GSTIN recorded. Ensure tax details align with GST payment terms; non-compliant invoices may be rejected during payment processing.
The notice does not specify delivery timelines. Bidders should watch for RFP addenda or clarifications from Iisco Steel Plant to obtain target delivery windows, lead times, and penalties if any.