TenderDekho Logo
Closed GEM

Procurement Opportunity: Outdoor Bullet IP CCTV Camera,Dome IP CCTV Camera,PTZ IP CCTV Camera,Network video recorder 64 chan in GAUTAM BUDDHA NAGAR, UTTAR PRADESH

Bid Publish Date

24-Dec-2024, 4:33 pm

Bid End Date

14-Jan-2025, 5:00 pm

Progress

Issue24-Dec-2024, 4:33 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

947

Category

Outdoor Bullet IP CCTV Camera

Bid Type

Two Packet Bid

Categories 32

A tender has been published for N/a Outdoor Bullet IP CCTV Camera, Dome IP CCTV Camera, PTZ IP CCTV Camera, Network video recorder 64 channel, 28 Port Network PoE Switch, 10 Port Network PoE Switch, Cat 6 UTP patch panel, CAT 6 UTP Outdoor Cable 305 M, Cat-6 UTP cable -305 Meter Box, 9 U Network rack, PVC conduit pipe Battern, hdpe pipe 32mm, pvc cable duct, TV, HDD, Cat-6 Patch cord 1M, MS Pole for cctv camera, Gang Box for cctv camera in GAUTAM BUDDHA NAGAR, UTTAR PRADESH. Quantity: 947 by. Submission Deadline: 14-01-2025 17: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Outdoor Bullet IP CCTV Camera , Dome IP CCTV Camera , PTZ IP CCTV Camera , Network video recorder 64 channel , 28 Port Network PoE Switch , 10 Port Network PoE Switch , Cat 6 UTP patch panel , CAT 6 UTP Outdoor Cable 305 M , Cat-6 UTP cable -305 Meter Box , 9 U Network rack , PVC conduit pipe Battern , hdpe pipe 32mm , pvc cable duct , TV , HDD , Cat-6 Patch cord 1M , MS Pole for cctv camera , Gang Box for cctv camera

Authority Records

MINISTRY OF ROAD TRANSPORT AND HIGHWAYS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-7239772.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 18 Items Sign in for GEM prices

#1

Outdoor Bullet IP CCTV Camera

Specification Documents Attached As per PDF

32 pieces Delivery: 60 days
#2

Dome IP CCTV Camera

Specification Documents Attached As per PDF

15 pieces Delivery: 60 days
#3

PTZ IP CCTV Camera

Specification Documents Attached As per PDF

4 pieces Delivery: 60 days
#4

Network video recorder 64 channel

Specification Documents Attached As per PDF

1 pieces Delivery: 60 days
#5

28 Port Network PoE Switch

Specification Documents Attached As per PDF

3 pieces Delivery: 60 days
#6

10 Port Network PoE Switch

Specification Documents Attached As per PDF

2 pieces Delivery: 60 days
#7

Cat 6 UTP patch panel

Specification Documents Attached As per PDF

5 pieces Delivery: 60 days
#8

CAT 6 UTP Outdoor Cable 305 M

Specification Documents Attached As per PDF

5 box Delivery: 60 days
#9

Cat-6 UTP cable -305 Meter Box

Specification Documents Attached As per PDF

5 box Delivery: 60 days
#10

9 U Network rack

Specification Documents Attached As per PDF

4 pieces Delivery: 60 days
#11

PVC conduit pipe Battern

Specification Documents Attached As per PDF

200 meter Delivery: 60 days
#12

hdpe pipe 32mm

Specification Documents Attached As per PDF

350 meter Delivery: 60 days
#13

pvc cable duct

Specification Documents Attached As per PDF

200 meter Delivery: 60 days
#14

TV

Specification Documents Attached As per PDF

1 pieces Delivery: 60 days
#15

HDD

Specification Documents Attached As per PDF

12 pieces Delivery: 60 days
#16

Cat-6 Patch cord 1M

Specification Documents Attached As per PDF

51 pieces Delivery: 60 days
#17

MS Pole for cctv camera

Specification Documents Attached As per PDF

6 pieces Delivery: 60 days
#18

Gang Box for cctv camera

Specification Documents Attached As per PDF

51 pieces Delivery: 60 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What are the eligibility requirements for this tender?

The eligibility requirements include being a registered entity with a valid Udyam Registration, having at least three years of past experience in supplying similar services, and maintaining a minimum average annual turnover of ₹6 lakh over the last three years. MSEs enjoy exemption from these criteria, provided they meet quality specifications.

What documents are required for submission?

Bidders must provide the Experience Criteria, Past Performance, and a Bidder Turnover certificate. Additionally, an OEM Authorization Certificate and proof of compliance with the stated specifications in the BOQ are mandatory.

How should bidders perform the registration process?

Bidders must ensure they have a valid Udyam Registration. They can complete the registration process through the GeM platform and should prepare necessary documentation as per guidelines outlined in the tender.

What are the accepted document formats for submission?

All documents should be submitted electronically. Specifically, commonly accepted formats include PDF for forms and certificates and Excel/CSV for BOQ items.

Are there specific technical specifications bidders need to adhere to?

Yes, all equipment provided must comply with the detailed technical specifications laid out in the BOQ document, including standards for the various types of CCTV cameras and related equipment.

What are the quality standards required for this tender?

Bidders must ensure products meet relevant quality standards as specified in the technical evaluation section of the bid document. Compliance with these standards is critical for bid acceptance.

What compliance requirements are mentioned in the tender?

Compliance involves adhering to the technical specifications and providing necessary documentation that evidences the capacity to meet quoted performance and specifications.

What is the EMD requirement for this tender?

An earnest money deposit (EMD) is required, the specific amount being determined as per tender guidelines. This deposit is retained as security during the evaluation period.

What are the performance security requirements?

A performance bank guarantee (PBG) of 5% of the contract value is required, which must be valid for a period of 38 months following contract signing.

What payment terms are outlined in the tender?

Payment terms will be clarified in the contract agreements subsequent to bid acceptance and may include conditions related to milestone delivery, completion certification, and acceptance by the buyer.

How will the pricing evaluation be conducted?

The evaluation will be based on the total value of bids presented. Assessors will ensure that bids align with required specifications while maintaining competitive pricing.

How should bidders submit their documents?

Documents must be submitted electronically via the GeM platform as stipulated in the bid instructions. Ensure that all required documents are included to avoid disqualification.

What are the key timelines and deadlines?

While specific dates cannot be disclosed, bidders must pay close attention to the bid announcement for submission deadlines, the duration for technical clarifications during evaluation, and the timeline for official communication regarding selection.

How is the evaluation and selection process structured?

Bids will be evaluated based on total bid value, adherence to technical specifications, documentation completeness, and past performance evidence. A structured approach will ensure fairness and transparency in the selection process.

When and how will bidders be notified of the results?

Bidders will be notified of the results after the completion of the evaluation process through official correspondence. This will include details on the winning bid and terms of acceptance.