TenderDekho Logo
Active GEM

Tender Notice for Fog Light Assy,Cabin Side Indicator Assy,Roof Lamp 2V3W,Cabin Light Bulb 24V3W,Pneumatic Solenoid V in POONCH, JAMMU & KASHMIR

Bid Publish Date

15-Oct-2026, 12:23 pm

Bid End Date

26-Oct-2026, 1:00 pm

Progress

Issue15-Oct-2026, 12:23 pm
AwardPending

Indian Army invites bids for Fog Light Assy, Cabin Side Indicator Assy, Roof Lamp 2V3W, Cabin Light Bulb 24V3W, Pneumatic Solenoid Valve, Tail Light Assy, Self Starter Solenoid, Brake Light Switch, Reverse Light Switch, Horn Assy 24V, Air Pressure Horn Relay 24V, Mini Fuse 10Amp, Combination Switch, Indicator Hazard Switch On Off, Fuel Filter Primary Paper, Fuel Filter Secondary Cloth, Side Indicator Assy, Apple Light Assy, Cabin Light Assy, Door Pneumatic Solenoid Valve, Remote Bty Cell Alkaline Manganese Butto Cell 12V 23Amp, Wiper Arm with Blade, Dual Filaments 12V21W, Bulb 12V5W, Single Filaments 12V21W, AC Compressor Relay 24V, Wiper Blade, 4ST Relay, Horn Fog Light Relay 24V, Bulb 24V5W, Bulb 24V24W, Fuel Cutt Off Solenoid Switch 24V, Sparking Plug, Crank Shaft Rear end Oil Seal, Iqn Coil, Locking leaf, Red Paint, Yellow Paint, Silver Paint, DOT 4, Distil Water, Painting Brush 3, Painting Brush 2, Emery Paper Hard size 150 in POONCH, JAMMU & KASHMIR. Quantity: 550. Submission Deadline: 26-10-2026 13: 00: 00. Submit your proposal before the deadline.

Advertisement

Tender Data

Bid Details

Quantity

550

Category

Fog Light Assy

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

OEM Avg. Turnover

1

Past Performance

40 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Fog Light Assy , Cabin Side Indicator Assy , Roof Lamp 2V3W , Cabin Light Bulb 24V3W , Pneumatic Solenoid Valve , Tail Light Assy , Self Starter Solenoid , Brake Light Switch , Reverse Light Switch , Horn Assy 24V , Air Pressure Horn Relay 24V , Mini Fuse 10Amp , Combination Switch , Indicator Hazard Switch On Off , Fuel Filter Primary Paper , Fuel Filter Secondary Cloth , Side Indicator Assy , Apple Light Assy , Cabin Light Assy , Door Pneumatic Solenoid Valve , Remote Bty Cell Alkaline Manganese Butto Cell 12V 23Amp , Wiper Arm with Blade , Dual Filaments 12V21W , Bulb 12V5W , Single Filaments 12V21W , AC Compressor Relay 24V , Wiper Blade , 4ST Relay , Horn Fog Light Relay 24V , Bulb 24V5W , Bulb 24V24W , Fuel Cutt Off Solenoid Switch 24V , Sparking Plug , Crank Shaft Rear end Oil Seal , Iqn Coil , Locking leaf , Red Paint , Yellow Paint , Silver Paint , DOT 4 , Distil Water , Painting Brush 3 , Painting Brush 2 , Emery Paper Hard size 150

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Poonch

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-PoonchPoonch--1015-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10039551.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 46 Items Sign in for GEM prices

#1

Fog Light Assy

Fog Light Assy

10 number Delivery: 15 days
#2

Cabin Side Indicator Assy

Cabin Side Indicator Assy

15 number Delivery: 15 days
#3

Roof Lamp 2V3W

Roof Lamp 2V3W

20 number Delivery: 15 days
#4

Cabin Light Bulb 24V3W

Cabin Light Bulb 24V3W

20 number Delivery: 15 days
#5

Pneumatic Solenoid Valve

Pneumatic Solenoid Valve

5 number Delivery: 15 days
#6

Tail Light Assy

Tail Light Assy

10 number Delivery: 15 days
#7

Self Starter Solenoid

Self Starter Solenoid

5 number Delivery: 15 days
#8

Brake Light Switch

Brake Light Switch

5 number Delivery: 15 days
#9

Reverse Light Switch

Reverse Light Switch

5 number Delivery: 15 days
#10

Horn Assy 24V

Horn Assy 24V

5 number Delivery: 15 days
#11

Air Pressure Horn Relay 24V

Air Pressure Horn Relay 24V

5 number Delivery: 15 days
#12

Mini Fuse 10Amp

Mini Fuse 10Amp

50 number Delivery: 15 days
#13

Combination Switch

Combination Switch

2 number Delivery: 15 days
#14

Indicator Hazard Switch On Off

Indicator Hazard Switch On Off

5 number Delivery: 15 days
#15

Fuel Filter Primary Paper

Fuel Filter Primary Paper

20 number Delivery: 15 days
#16

Fuel Filter Secondary Cloth

Fuel Filter Secondary Cloth

20 number Delivery: 15 days
#17

Side Indicator Assy

Side Indicator Assy

10 number Delivery: 15 days
#18

Apple Light Assy

Apple Light Assy

5 number Delivery: 15 days
#19

Cabin Light Assy

Cabin Light Assy

3 number Delivery: 15 days
#20

Door Pneumatic Solenoid Valve

Door Pneumatic Solenoid Valve

6 number Delivery: 15 days
#21

Remote Bty Cell Alkaline Manganese Butto Cell 12V 23Amp

Remote Bty Cell Alkaline Manganese Butto Cell 12V 23Amp

48 number Delivery: 15 days
#22

Wiper Arm with Blade

Wiper Arm with Blade

4 number Delivery: 15 days
#23

Dual Filaments 12V21W

Dual Filaments 12V21W

10 number Delivery: 15 days
#24

Bulb 12V5W

Bulb 12V5W

20 number Delivery: 15 days
#25

Single Filaments 12V21W

Single Filaments 12V21W

20 number Delivery: 15 days
#26

AC Compressor Relay 24V

AC Compressor Relay 24V

5 number Delivery: 15 days
#27

Wiper Blade

Wiper Blade

10 number Delivery: 15 days
#28

Fog Light Assy

Fog Light Assy

7 number Delivery: 15 days
#29

Cabin Side Indicator Assy

Cabin Side Indicator Assy

5 number Delivery: 15 days
#30

4ST Relay

4ST Relay

5 number Delivery: 15 days
#31

Horn Fog Light Relay 24V

Horn Fog Light Relay 24V

10 number Delivery: 15 days
#32

Bulb 24V5W

Bulb 24V5W

50 number Delivery: 15 days
#33

Bulb 24V24W

Bulb 24V24W

10 number Delivery: 15 days
#34

Fuel Cutt Off Solenoid Switch 24V

Fuel Cutt Off Solenoid Switch 24V

5 number Delivery: 15 days
#35

Sparking Plug

Sparking Plug

8 number Delivery: 15 days
#36

Crank Shaft Rear end Oil Seal

Crank Shaft Rear end Oil Seal

5 number Delivery: 15 days
#37

Iqn Coil

Iqn Coil

5 number Delivery: 15 days
#38

Locking leaf

Locking leaf

50 pieces Delivery: 15 days
#39

Red Paint

Red Paint

2 liter Delivery: 15 days
#40

Yellow Paint

Yellow Paint

2 liter Delivery: 15 days
#41

Silver Paint

Silver Paint

2 liter Delivery: 15 days
#42

DOT 4

DOT 4

5 liter Delivery: 15 days
#43

Distil Water

Distil Water

10 liter Delivery: 15 days
#44

Painting Brush 3

Painting Brush 3

4 number Delivery: 15 days
#45

Painting Brush 2

Painting Brush 2

2 number Delivery: 15 days
#46

Emery Paper Hard size 150

Emery Paper Hard size 150

20 number Delivery: 15 days

Categories 26

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement