TenderDekho Logo
Active GEM

Bharat Heavy Electricals Limited FixBolts Nuts Washers Fittings Tender India 2026

Bid Publish Date

29-Sep-2026, 11:41 am

Bid End Date

16-Oct-2026, 12:00 pm

Generate Docs

Progress

Issue29-Sep-2026, 11:41 am
Corrigendum09-Oct-2026
AwardPending

Key Highlights

  • • Specific purchase preference for Micro and Small Enterprises (MSEs) with manufacturer-only eligibility
  • • Option clause enabling ±25% quantity variation during and after contract formation
  • • Mandatory detailed design drawings approval within 15 days of award with 7-day response window
  • • Inspection regime options: pre-dispatch at vendor premises or post-receipt at consignee site

Tender Overview

Bharat Heavy Electricals Limited (BHEL) invites bids for a range of mechanical fastening and vibration control components, including FIXBOLTS NUTS WASHERS W FASTENERS FITTED, EXPANSION VIBRATION ISOLATOR I L, EXPANSION VIBRATION ISOLATOR O L, SILENCER FILTER DUCTING, DILUTION AIR FAN WITH AC MOTOR, and ANTI VIBRATION PADS OUTLET TRANSITION PIECE. The BOQ lists 21 items with unspecified quantities, and the estimated value is not disclosed. The procurement location is not specified, but the project scope targets mechanical assemblies for heavy industry equipment. The bid documents require option-based quantity adjustments up to 25%, and detailed design drawings must be approved by the buyer within 15 days of award. A pre-dispatch or post-receipt inspection regime may apply depending on ATC selections. BHEL provides MSE purchase preference under applicable policy.

Technical Specifications & Requirements

  • Product categories: fasteners, vibration isolators (ISO/L-type), silencers, ducting filters, anti-vibration pads, transition pieces, and motorized fans.
  • Drawings & approvals: Detailed Design Drawings due within 15 days of award; buyer to respond within 7 days with approvals or modification list.
  • Inspection: Pre-dispatch and post-receipt inspection options; nominated inspection agencies include AT VENDOR WORKS BY BHEL TPIA or AT BHEL STORES BY BHEL QC.
  • Delivery: Delivery schedule to align with supplier’s extended delivery period per option clause, minimum 30 days; original period governs adjustments.
  • Commercial terms: 25% quantity variation permitted; MSE preference available for manufacturers; Traders are excluded from MSE policy.
  • Miscellaneous: PAN, GSTIN, cancelled cheque, and EFT mandate prerequisites for vendor code creation; payment terms not disclosed.

Terms, Conditions & Eligibility

  • EMD/Performance: Not disclosed in the data; bidders should expect standard EMD as per policy and contract.
  • Delivery terms: Extended delivery period adjustments based on option clause; no LD for buyer-approved drawing delays.
  • Documentation: Permit submission of PAN, GSTIN, cancelled cheque, EFT mandate with bid; OEM authorizations may be required depending on item.
  • Purchase preference: MSEs eligible for purchase preference provided bidder is a manufacturer of the offered product.
  • Inspection: Pre-dispatch or post-receipt inspections by designated authorities; adherence to buyer drawings is mandatory.
  • Notes: Tender requires compliance with internal ATC selections and approval processes; quantities may be adjusted by up to 25% during contract execution.

Key Specifications

  • FIXBOLTS NUTS WASHERS W FASTENERS FITTED

  • EXPANSION VIBRATION ISOLATOR I L

  • EXPANSION VIBRATION ISOLATOR O L

  • SILENCER FILTER DUCTING

  • DILUTION AIR FAN WITH AC MOTOR

  • ANTI VIBRATION PADS

  • OUTLET TRANSITION PIECE

  • 21 BOQ items with unspecified quantities

Terms & Conditions

  • Quantity variation up to 25% of bid/contracted quantity

  • 15-day window for Detailed Design Drawings submission and 7-day reply for modifications

  • Inspection options at vendor premises or consignee site; third-party inspection possible

  • MSE purchase preference for manufacturers; traders excluded

  • GSTIN, PAN, cancelled cheque, and EFT mandate required for vendor code creation

  • Delivery period adjustments with minimum 30 days; LD not charged for buyer delays in drawing approvals

Important Clauses

Payment Terms

Payment terms not explicitly disclosed; standard procurement terms to apply, with possible advance/milestone payments per contract

Delivery Schedule

Delivery period calculated using original contract period; additional time = (increased quantity / original quantity) × original delivery period, minimum 30 days

Penalties/Liquidated Damages

No specific LD details provided; penalties to be as per general procurement policy or contract after buyer approval

Bidder Eligibility

  • Manufacturer of offered products to claim MSE purchase preference

  • Compliance with PAN, GSTIN, and EFT mandate submission

  • Ability to submit Detailed Design Drawings within 15 days of award

Advertisement

Tender Data

Bid Details

Quantity

72

Category

DILUTION AIR FAN WITH AC MOTOR

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

10 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

FIXBOLTS NUTS WASHERS W FASTENERS FITTED , EXPANSION VIBRATION ISOLATOR I L , EXPANSION VIBRATION ISOLATOR O L , SILENCER FILTER DUCTING , DILUTION AIR FAN WITH AC MOTOR , ANTI VIBRATION PADS , OUTLET TRANSITION PIECE

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Tiruchirappalli

Delivery Pincodes

620014

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Akhil K Das620014,HIGH PRESSURE BOILER PLANT, BHARAT HEAVY ELECTRICALS LIMITED, TIRUCHIRAPPALLI - 620014. TAMILNADU. INDIA.TiruchirappalliTamil Nadu6200142180-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9959847.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Corrigendum Updates

1 Update
#1

Update

09-Oct-2026

Extended Deadline

16-Oct-2026, 6:30 am

Opening Date

17-Oct-2026, 6:30 am

Advertisement

Bill of Quantities (BOQ) 21 Items Sign in for GEM prices

#1

FIXBOLTS NUTS WASHERS W FASTENERS FITTED

FIXBOLTS NUTS WASHERS W FASTENERS FITTED

2 set Delivery: 180 days
#2

EXPANSION VIBRATION ISOLATOR I L

EXPANSION VIBRATION ISOLATOR I L

2 no Delivery: 180 days
#3

EXPANSION VIBRATION ISOLATOR O L

EXPANSION VIBRATION ISOLATOR O L

2 no Delivery: 180 days
#4

SILENCER FILTER DUCTING

SILENCER FILTER DUCTING

2 set Delivery: 180 days
#5

DILUTION AIR FAN WITH AC MOTOR

DILUTION AIR FAN WITH AC MOTOR

2 no Delivery: 180 days
#6

ANTI VIBRATION PADS

ANTI VIBRATION PADS

12 no Delivery: 180 days
#7

OUTLET TRANSITION PIECE

OUTLET TRANSITION PIECE

2 set Delivery: 180 days
#8

DILUTION AIR FAN WITH AC MOTOR

DILUTION AIR FAN WITH AC MOTOR

2 no Delivery: 210 days
#9

ANTI VIBRATION PADS

ANTI VIBRATION PADS

12 no Delivery: 210 days
#10

OUTLET TRANSITION PIECE

OUTLET TRANSITION PIECE

2 set Delivery: 210 days
#11

FIXBOLTS NUTS WASHERS W FASTENERS FITTED

FIXBOLTS NUTS WASHERS W FASTENERS FITTED

2 set Delivery: 210 days
#12

EXPANSION VIBRATION ISOLATOR I L

EXPANSION VIBRATION ISOLATOR I L

2 no Delivery: 210 days
#13

EXPANSION VIBRATION ISOLATOR O L

EXPANSION VIBRATION ISOLATOR O L

2 no Delivery: 210 days
#14

SILENCER FILTER DUCTING

SILENCER FILTER DUCTING

2 set Delivery: 210 days
#15

DILUTION AIR FAN WITH AC MOTOR

DILUTION AIR FAN WITH AC MOTOR

2 no Delivery: 240 days
#16

ANTI VIBRATION PADS

ANTI VIBRATION PADS

12 no Delivery: 240 days
#17

OUTLET TRANSITION PIECE

OUTLET TRANSITION PIECE

2 set Delivery: 240 days
#18

FIXBOLTS NUTS WASHERS W FASTENERS FITTED

FIXBOLTS NUTS WASHERS W FASTENERS FITTED

2 set Delivery: 240 days
#19

EXPANSION VIBRATION ISOLATOR I L

EXPANSION VIBRATION ISOLATOR I L

2 no Delivery: 240 days
#20

EXPANSION VIBRATION ISOLATOR O L

EXPANSION VIBRATION ISOLATOR O L

2 no Delivery: 240 days
#21

SILENCER FILTER DUCTING

SILENCER FILTER DUCTING

2 set Delivery: 240 days

Categories 18

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate duly certified by Bank

5

Technical compliance certificates and OEM authorizations (if applicable)

6

Experience certificates for similar mechanical assemblies

7

Financial statements (as required by bidder)

8

Any approved Detailed Design Drawings (when provided by Buyer)

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to bid on the BHEL fix bolts tender in India 2026?

To bid, bidders must meet manufacturer eligibility for MSE preference, submit PAN, GSTIN, cancelled cheque, and EFT mandate; provide Detailed Design Drawings within 15 days of award and respond within 7 days. Ensure compliance with inspection provisions and option-based quantity variation up to 25%.

What documents are required for BHEL vibration isolator procurement in 2026?

Submit PAN, GSTIN, cancelled cheque, EFT mandate, OEM authorizations if applicable, technical compliance certificates, experience certificates for similar work, and financial statements. Include Detailed Design Drawings within 15 days of award for approval.

What are the delivery terms for BHEL fan and silencers tender 2026?

Delivery is governed by the option clause allowing up to 25% quantity variation; delivery period extends based on increased quantity and original timeline, with a minimum 30 days. Delays due to buyer drawing approvals may extend delivery without LD.

What are the inspection arrangements for BHEL procurement in 2026?

Inspection may be pre-dispatch at vendor premises or post-receipt at BHEL stores; the nominated inspection agencies include AT VENDOR WORKS BY BHEL TPIA or BHEL QC store inspections depending on ATC selections.

Which products are included in the BHEL 2026 tender for heavy industry?

The scope covers FIXBOLTS NUTS WASHERS W FASTENERS FITTED, EXPANSION VIBRATION ISOLATOR I L, EXPANSION VIBRATION ISOLATOR O L, SILENCER FILTER DUCTING, DILUTION AIR FAN WITH AC MOTOR, ANTI VIBRATION PADS, and OUTLET TRANSITION PIECE.

What is the role of MSE preference in the BHEL tender 2026?

MSE preference applies to manufacturers of offered products; bidders must demonstrate manufacturing capability. Traders are excluded; preference is conferred under the MSE policy with eligibility checks.

What is required for Detailed Design Drawings submission in this tender?

Submit Detailed Design Drawings within 15 days of award; buyer replies with approval or modification list within 7 days; non-approval delays may shift the delivery timeline without LD.

How does the option clause affect quantities in the BHEL tender?

Bid quantity may be increased or decreased by up to 25% at contract placement and during currency; delivery period scales with additional quantity, maintaining minimum 30 days.

Advertisement