CHAIN ROLLER FOR WPB
Nlc India Limited
CUDDALORE, TAMIL NADU
Bid Publish Date
18-Feb-2026, 5:12 pm
Bid End Date
28-Feb-2026, 6:00 pm
Location
Progress
Quantity
950
Bid Type
Single Packet Bid
Bharat Heavy Electricals Limited (BHEL) invites bids for the Only supply of Goods to the BHEL VelloRe stores, VelLORE, Tamil Nadu 631001. The procurement involves a goods supply contract with an option clause allowing ±25% quantity variations at contracted rates. Delivery terms hinge on approval of Detailed Design Drawings, with submissions due within 15 days of award and Buyer feedback within 7 days. Invoicing must be in the consignee’s name with the consignee GSTIN. The inspection framework includes pre-dispatch inspection at vendor premises or by a BHEL-authorised TPIA, and post-receipt inspection at the consignee site. This tender emphasizes compliance with buyer-approved drawings and timely modifications, without LD implications for Buyer-delayed drawings approval.
Product/service names: Goods supply to BHEL Velore stores
Quantities: Variation up to 25% of bid/contract quantity
Estimated value: Not disclosed
Experience: Not specified; requires approval of Detailed Drawings within 15 days
Quality/standards: Not specified; compliance with Buyer-approved drawings
Option clause allows ±25% quantity variation at contracted rates
Delivery period linked to approval of Detailed Design Drawings; 15 days submission, 7 days for modification
Invoices must be raised in consignee name with GSTIN; GST compliance required
Not specified; standard bid terms apply; invoicing must reflect consignee GSTIN
Delivery period to be finalized after drawing approval; extended delivery time formula provided with minimum 30 days
LD not specified for drawing approval delays; delivery period may be re-fixed without LD
Not under liquidation or bankruptcy; provide undertaking
Submission of PAN, GSTIN, cancelled cheque, EFT mandate
Ability to submit Detailed Design Drawings within 15 days of award and obtain Buyer approval
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Nlc India Limited
CUDDALORE, TAMIL NADU
Indian Navy
Bharat Heavy Electricals Limited (bhel)
BHOPAL, MADHYA PRADESH
Armoured Vehicles Nigam Limited
TIRUVALLUR, TAMIL NADU
Indian Air Force
JORHAT, ASSAM
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT mandate certified by Bank
Undertaking that bidder is not under liquidation or bankruptcy
Any prior drawing approvals or design documents related to similar supply (if available)
Key insights about TAMIL NADU tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate; provide an undertaking of non-liquidation; include Detailed Design Drawings within 15 days of award; ensure invoicing to consignee with GSTIN; comply with inspection at vendor works or by BHEL-authorised TPIA.
Required documents include PAN Card copy, GSTIN copy, cancelled cheque, EFT mandate certified by bank, and an undertaking of financial standing; prepare project experience certificates if available; provide any prior design approval drawings for related goods.
Delivery is linked to Buyer-approved Detailed Design Drawings; submit drawings within 15 days; Buyer responds with approval or modification list within 7 days; delivery timeline may be re-fixed without LD if Buyer delays approval.
Inspection can be pre-dispatch at vendor premises by BHEL or a BHEL-authorised TPIA; post-receipt inspection occurs at the consignee site; ensure readiness for on-site checks in line with Buyer approvals.
The Purchaser may increase or decrease quantity by up to 25% at contract rates; during currency, additional time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days.
Invoices must be raised in the consignee’s name and include the consignee GSTIN; ensure GST compliance and accurate billing against approved drawings and delivery milestones.
If drawings are delayed, the delivery period may be re-fixed; there is no LD for Buyer-caused delays in approval, but schedule must reflect revised delivery targets and must align with the 15/7-day response cycle.
The data does not specify explicit standards like IS 550 or ISO; bidders should align with Buyer-approved drawings and confirm any applicable internal BHEL standards during detailed design submission and post-approval execution.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS