TenderDekho Logo
Closed GEM

Government Tender Published for Supply of 80 mm thick PUF Panels,Refrigeration Units,ITC charges of panels,Supply of Ancillary mate in COIMBATORE, TAMIL NADU

Bid Publish Date

30-Jul-2026, 6:00 pm

Bid End Date

20-Aug-2026, 6:00 pm

EMD

₹48,292

Value

₹16,09,723

Progress

Issue30-Jul-2026, 6:00 pm
AwardPending

Airports Authority Of India has released a public tender for Supply of 80 mm thick PUF Panels, Refrigeration Units, ITC charges of panels, Supply of Ancillary material, Installation Testing and Commissioning charges, Supply installation testing and commissioning of Soft or Hard, SITC of 6 Way Vertical TPN Distribution Board DB, Supply of 1. 1 kV grade 4 Core x 16 sq. mm, Laying and fixing power cable of 1. 1 KV, Supplying and making end termination in COIMBATORE, TAMIL NADU. Quantity: 232. Submission Deadline: 20-08-2026 18: 00: 00. Download documents and apply online.

Authority & Contact

Office Name

Coimbatore International Airport

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

232

Category

Supply of 80 mm thick PUF Panels

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

5

OEM Avg. Turnover

5

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of 80 mm thick PUF Panels , Refrigeration Units , ITC charges of panels , Supply of Ancillary material , Installation Testing and Commissioning charges , Supply installation testing and commissioning of Soft or Hard , SITC of 6 Way Vertical TPN Distribution Board DB , Supply of 1.1 kV grade 4 Core x 16 sq.mm , Laying and fixing power cable of 1.1 KV , Supplying and making end termination

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Coimbatore

Delivery Pincodes

641014

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Senthilkumar S V641014,33AAACA6412D1ZF, Airports Authority Of India, Coimbatore International Airport, CoimbatoreCoimbatoreTamil Nadu641014190-

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9685521.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 13 Items Sign in for GEM prices

#1

Supply of 80 mm thick PUF Panels

Supply of 80 mm thick PUF Panels SS 304 or PPGI 4 side wall and ceiling with a door and PUF Flooring 60mm thick for cold room of size 20 feet x 12 feet x 10 feet External dimension. The PUF panel shall be filled with PUF material having density 40Kg or m3 and the PUF panels shall meet IS 11239 with upto date amendments.

1 set Delivery: 90 days
#2

Refrigeration Units

Refrigeration Units 20000 BTU ODU and IDU with Controller x 2 set

2 set Delivery: 90 days
#3

ITC charges of panels

Installation Testing and Commissioning charges of Panels of Wall ceiling Doors Flooring for Room and Refrigeration Units

1 job Delivery: 90 days
#4

Supply of Ancillary material

Supply of Ancillary material i.e PUF Flooring Refrigerant piping and Control wiring up to 30 Rft Per unit Gas PUF solution Sealants LED x 2 nos and accessories Stabilizer Safety alarm Revet Bolt nut etc

1 job Delivery: 90 days
#5

Supply of 80 mm thick PUF Panels

Supply of 80 mm thick PUF Panels SS 304 or PPGI 4 side wall and ceiling with a door and PUF Flooring 6 feet x 12 feet x 10 feet External dimension

1 set Delivery: 90 days
#6

Refrigeration Units

Refrigeration Units 10000 BTU ODU and IDU with Controller x 1 set

1 set Delivery: 90 days
#7

Installation Testing and Commissioning charges

Installation Testing and Commissioning charges of Panels of Wall and ceiling Doors Flooring for Room and Refrigeration Units

1 job Delivery: 90 days
#8

Supply of Ancillary material

Supply of Ancillary material i.e Refrigerant piping and Control wiring up to 30 Rft Per unit Gas PUF solution Sealants LED x 2 nos and accessories Stabilizer Safety alarm Revet Bolt nut etc

1 job Delivery: 90 days
#9

Supply installation testing and commissioning of Soft or Hard

Supply installation testing and commissioning of Soft or Hard drawn suitable copper refrigerant pipes of suitable size gas and liquid between indoor and outdoor unitswith closed cell elastomeric tubular insulation etc. complete as requried and as per the direction of the Engineer in Charge.

20 rmt Delivery: 90 days
#10

SITC of 6 Way Vertical TPN Distribution Board DB

Supply installation testing and commissioning of 6 Way Vertical TPN Distribution Board DB surface mounted on walls double door type with IP 42 protection complete with copper bus bar neutral bar earth bar including providing. A INCOMERS 40A Four Pole FP MCB 1 No. B OUTGOING FEEDERS 16A Triple Pole TP MCB 3 Nos. 10A Single Pole SP MCBs 2 Nos6A SP MCB 1 No. Complete with interconnected wiring, tags and earthing connections as required.

1 job Delivery: 90 days
#11

Supply of 1.1 kV grade 4 Core x 16 sq.mm

Supply of 1.1 kV grade 4 Core x 16 sq.mm XLPE insulated PVC sheathed galvanized steel strip armoured Aluminum conductor cable conforming to IS 7098 Part 1 or 1988 with upto date amendments etc complete as required.

100 meter Delivery: 90 days
#12

Laying and fixing power cable of 1.1 KV

Laying and fixing of one number PVC insulated and PVC sheathed or XLPE power cable of 1.1 KV grade of following size on wall surface as required. Upto 35 sq. mm clamped with 1mm thick saddle

100 meter Delivery: 90 days
#13

Supplying and making end termination

Supplying and making end termination with brass compression gland and aluminium lugs for following size of PVC insulated and PVC sheathed or XLPE aluminium conductor cable of 1.1 KV grade as required. 4 Core x 16 sq.mm

2 set Delivery: 90 days

Categories 68

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer