Bid Publish Date
14-Jan-2025, 2:21 pm
Bid End Date
04-Feb-2025, 3:00 pm
Location
Progress
Quantity
136
Public procurement opportunity for Indian Navy EW9090V-LS401, EW9090V-800EP-F2, EW9090V-M1000- 24-10B, EW9090V-N02-120-406, EW9090V-800EP-KM2Z1, EW9090V-MPR4103G3-24VDC-30S-DPC, EW9090V-TE501, EW9090V-TS201, EW9090V-U5-2255-B2, EW9090V-U5- S180-156-812, EW9090V-A1-U1, EW9090V-M0500-22, EW9090V-N02-320-406, EW9090V-P5, EW9090V-TS401, EW9090V-U5-SMK-8001-25V, EW9090V-TE502, EW9090V- 512700015-A27, EW9090V-CM8000SCA1-72-18-DIA130, EW9090V-M0500-U7, EW9090V-M2000-20-10B, EW9090V- PS201-1, EW9090V-LS901, EW9090V-P3-PQ72-0-40, EW9090V-114007, EW9090V-114008, EW9090V-TS403 in MUMBAI, MAHARASHTRA. Quantity: 136 issued by. Submission Deadline: 04-02-2025 15: 00: 00. View full details and respond.
Tender Category
Goods
Bid To RA
No
Item Category
EW9090V-LS401 , EW9090V-800EP-F2 , EW9090V-M1000- 24-10B , EW9090V-N02-120-406 , EW9090V-800EP-KM2Z1 , EW9090V-MPR4103G3-24VDC-30S-DPC , EW9090V-TE501 , EW9090V-TS201 , EW9090V-U5-2255-B2 , EW9090V-U5- S180-156-812 , EW9090V-A1-U1 , EW9090V-M0500-22 , EW9090V-N02-320-406 , EW9090V-P5 , EW9090V-TS401 , EW9090V-U5-SMK-8001-25V , EW9090V-TE502 , EW9090V- 512700015-A27 , EW9090V-CM8000SCA1-72-18-DIA130 , EW9090V-M0500-U7 , EW9090V-M2000-20-10B , EW9090V- PS201-1 , EW9090V-LS901 , EW9090V-P3-PQ72-0-40 , EW9090V-114007 , EW9090V-114008 , EW9090V-TS403
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
EW9090V-LS401
LEVEL SWITCH LCWT WARNING
EW9090V-800EP-F2
PUSH BUTTON BLACK
EW9090V-M1000-24-10B
ALARM ANNUNCIATOR
EW9090V-N02-120-406
PRESSURE METER
EW9090V-800EP-KM2Z1
KEY OPERATED SELECTOR SWITCH 0-1 WITH KEY REMOVAL IN POS.
EW9090V-MPR4103G3-24VDC-30S-DPC
MOTORIZED POTENTIOMETER 5K OHM/24VDC
EW9090V-TE501
THERMO ELEMENT EXHAUST TEMP A BANK AFTER TURBO
EW9090V-TS201
TEMP SWITCH HIGH LUB OIL TEM WARNING
EW9090V-U5-2255-B2
F/I CONVERTER WITH LEVEL RELAY OUT PUT
EW9090V-U5-S180-156-812
VOLTAGE CONTROL RELAY
EW9090V-A1-U1
AVR (COSIMAT N)
EW9090V-M0500-22
TACHO VOLTAGE DETECTOR
EW9090V-N02-320-406
TEMPERATURE METER
EW9090V-P5
SPEED TACHOMETER
EW9090V-TS401
TEMP SWITCH ENGINE PRE HEATING ON/OFF
EW9090V-U5-SMK-8001-25V
VOLTAGE CODE MODULE
EW9090V-TE502
THERMO ELEMENT EXHAUST TEMP B BANK AFTER TURBO
EW9090V-512700015-A27
PNEUMATIC (AIR) STARTER
EW9090V-CM8000SCA1-72-18-DIA130
CENTAMAX COUPLING
EW9090V-M0500-U7
TACHO VOLTAGE DETECTOR U7
EW9090V-M2000-20-10B
ENGINE CONTROL UNIT
EW9090V-PS201-1
PRESSURE SWITCH
EW9090V-LS901
LEVEL SWITCH COOL WATER LEAK WARNING
EW9090V-P3-PQ72-0-40
PRESSURE METER 0-40 BAR
EW9090V-114007
SCREW
EW9090V-114008
GEAR RIM
EW9090V-TS403
TEMP SWITCH HCWT WARNING
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | EW9090V-LS401 | LEVEL SWITCH LCWT WARNING | 8 | no | dcwhesp | 365 | |
| 2 | EW9090V-800EP-F2 | PUSH BUTTON BLACK | 2 | no | dcwhesp | 365 | |
| 3 | EW9090V-M1000-24-10B | ALARM ANNUNCIATOR | 4 | no | dcwhesp | 365 | |
| 4 | EW9090V-N02-120-406 | PRESSURE METER | 2 | no | dcwhesp | 365 | |
| 5 | EW9090V-800EP-KM2Z1 | KEY OPERATED SELECTOR SWITCH 0-1 WITH KEY REMOVAL IN POS. | 1 | no | dcwhesp | 365 | |
| 6 | EW9090V-MPR4103G3-24VDC-30S-DPC | MOTORIZED POTENTIOMETER 5K OHM/24VDC | 5 | no | dcwhesp | 365 | |
| 7 | EW9090V-TE501 | THERMO ELEMENT EXHAUST TEMP A BANK AFTER TURBO | 7 | no | dcwhesp | 365 | |
| 8 | EW9090V-TS201 | TEMP SWITCH HIGH LUB OIL TEM WARNING | 3 | no | dcwhesp | 365 | |
| 9 | EW9090V-U5-2255-B2 | F/I CONVERTER WITH LEVEL RELAY OUT PUT | 4 | no | dcwhesp | 365 | |
| 10 | EW9090V-U5-S180-156-812 | VOLTAGE CONTROL RELAY | 8 | no | dcwhesp | 365 | |
| 11 | EW9090V-A1-U1 | AVR (COSIMAT N) | 1 | no | dcwhesp | 365 | |
| 12 | EW9090V-M0500-22 | TACHO VOLTAGE DETECTOR | 2 | no | dcwhesp | 365 | |
| 13 | EW9090V-N02-320-406 | TEMPERATURE METER | 1 | no | dcwhesp | 365 | |
| 14 | EW9090V-P5 | SPEED TACHOMETER | 17 | no | dcwhesp | 365 | |
| 15 | EW9090V-TS401 | TEMP SWITCH ENGINE PRE HEATING ON/OFF | 10 | no | dcwhesp | 365 | |
| 16 | EW9090V-U5-SMK-8001-25V | VOLTAGE CODE MODULE | 3 | no | dcwhesp | 365 | |
| 17 | EW9090V-TE502 | THERMO ELEMENT EXHAUST TEMP B BANK AFTER TURBO | 13 | no | dcwhesp | 365 | |
| 18 | EW9090V-512700015-A27 | PNEUMATIC (AIR) STARTER | 10 | no | dcwhesp | 365 | |
| 19 | EW9090V-CM8000SCA1-72-18-DIA130 | CENTAMAX COUPLING | 4 | no | dcwhesp | 365 | |
| 20 | EW9090V-M0500-U7 | TACHO VOLTAGE DETECTOR U7 | 2 | no | dcwhesp | 365 | |
| 21 | EW9090V-M2000-20-10B | ENGINE CONTROL UNIT | 8 | no | dcwhesp | 365 | |
| 22 | EW9090V-PS201-1 | PRESSURE SWITCH | 5 | no | dcwhesp | 365 | |
| 23 | EW9090V-LS901 | LEVEL SWITCH COOL WATER LEAK WARNING | 9 | no | dcwhesp | 365 | |
| 24 | EW9090V-P3-PQ72-0-40 | PRESSURE METER 0-40 BAR | 3 | no | dcwhesp | 365 | |
| 25 | EW9090V-114007 | SCREW | 2 | no | dcwhesp | 365 | |
| 26 | EW9090V-114008 | GEAR RIM | 1 | no | dcwhesp | 365 | |
| 27 | EW9090V-TS403 | TEMP SWITCH HCWT WARNING | 1 | no | dcwhesp | 365 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | WARTSILA INDIA PRIVATE LIMITED(MII) Under PMA | Item Categories : EW9090V-LS401,EW9090V-800EP-F2,EW9090V-M1000-24-10B,EW9090V-N02-120-406,EW9090V-800EP-KM2Z1,EW9090V |
Key insights about MAHARASHTRA tender market
The eligibility requirements generally include being a registered entity with a legal status to engage in government contracts. Bidders must also demonstrate adherence to the specified technical and financial qualifications as outlined in the tender documentation.
Bidders are often required to provide various certificates that validate their compliance with necessary standards, including manufacturer authorization and quality compliance certificates. Specific certification requirements can be found in the main tender document.
The registration process for bidders typically involves creating an account on the procurement platform (GeM), followed by submission of relevant documents validating business legitimacy before participating in the evaluation process.
Submission must be made in specified digital formats as mentioned in the main tender document. Commonly accepted formats include PDF, which are vital for maintaining integrity during the review by the evaluation committee.
The technical specifications depend on the list of items in the BOQ. Bidders should ensure that they understand each specification to meet the necessary quality standards and compliance requirements.
Yes, bidders must adhere to industry-standard quality standards as defined in the tender documentation. Implementation of these standards is crucial for equipment approval and contract execution.
The EMD is a security deposit that bidders must submit along with their bids to ensure serious participation. The exact amount and conditions for the EMD can be found within the detailed tender documents.
Winning bidders must submit a performance security as a guarantee for the fulfillment of contract obligations. The specifics of the performance security requirement will be detailed in the main documentation.
Payment terms are typically structured around milestones, including complete delivery and acceptance of goods based on quality checks. Detailed terms can be clarified through the tender documents.
The price evaluation process considers the total cost against the technical specifications provided. It ensures competitive pricing while meeting the required standards stipulated in the tender documentation.
Bids can be submitted electronically through the designated platform. Possible submission methods might include online uploads or formal registrations as per the guidelines elucidated in the submission details.
Key timelines and deadlines for submissions, evaluations, and notifications will be stipulated in the tender documentation and must be adhered to by all participants.
MSEs may receive special concessions during both the evaluation and bidding processes to promote participation and support local economies. These benefits are clearly defined in the tender specifics.
Yes, provisions aimed at supporting start-ups are included, which may offer advantages in evaluation criteria, financial support, or relaxed bidding requirements. Further details can be investigated in the official tender documentation.
The tender aligns with the ‘Make in India’ initiative by encouraging local manufacturers and suppliers, thereby enhancing domestic production and procurement capabilities through specified local content criteria.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS