TenderDekho Logo
Closed GEM

Tender Notice for PUF Panel 60mm for wall,PUF Panel 40mm for ceiling,Pre painted galvalume aluminum zinc,3 mm thick P in KINNAUR, HIMACHAL PRADESH

Bid Publish Date

19-Aug-2025, 7:07 pm

Bid End Date

29-Aug-2025, 8:00 pm

Progress

RA
Issue19-Aug-2025, 7:07 pm
Reverse Auction04-Sep-2025, 11:00 am
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

8550

Category

PUF Panel 60mm for wall

Bid Type

Two Packet Bid

Categories 100

Armed Forces Tribunal has released a public tender for PUF Panel 60mm for wall, PUF Panel 40mm for ceiling, Pre painted galvalume aluminum zinc, 3 mm thick Polycarbonate sheet, Hollow iron, Angle flat iron, Nut and bolt, Earthing, Lightening Arrester, Main door, Window, Verandah Cover with Aluminium Frame, Fire extinguisher Ball Auto Fire Off, Curtain Rod, Supply only Stainless Steel premium fesue dual edge 8 pin, Fd Heating Device, Steel almirah large, Smart ortho Mattress Ultimate back pain relief, Electric Items, Foot Scraper, Iron Foot Mat, White cement, Looking Mirror, Double Bunks MS tubes with 12mm, Sealing material tube, Ordinary Portland Cement OPC 43, Coarse sand sand shall be clean sharp, Stone aggregate shall be crushed stone 20mm, Stone aggregate shall be crushed stone 40mm, Stone aggregate shall be crushed stone 10mm, GVT tiles 10 to12mm thick square, Jute Mat of Size 600x450mm, Stainless Steel Shoe Rack Shoe Stand, Automatic Silver Shoes Shining Machine, Swing Open Top Dust Bin Stainless Steel, Supply only Transitional End Table with Open Shelves, Stainless Steel Heavy Duty Double Pole 3 layer, Stone aggregate shall be crushed stone not exceeding 63mm, Excavation for footing column and plinth, Returning Filling compaction, Removing of excated soil, 24 watt decorative ultra slim aluminium square profile LED lighting, 18 watt decorative ultra slim square profile LED lighting, Bulk head housing with LED bulb, LED 9 W bulb with ISI marked, Angle batten Lamp holder with 230 volt grade, Brown Matte Modular Electrical Switch 5 Amp, Brown Matte Modular Electrical Switch15 Amp, Ceiling rose with three terminals with ISI mark 230 Volt grade, PVC Round Square block with ISI marked, PVC Casing capping double locked box type 1inch x 6 feet, Casing capping double locked box type 1 point 5 inch x 6 feet, Gang Box 5 switches 5 Amps heavy duty, Gang Box 4 Swithces 5 Amps heavy duty, Gang Box 2 switches 5 Amps heavy duty, Gang Box 1 switch 5 Amps heavy duty, Screw full threaded 1 point 5 inch 200 Nos, Screw full threaded 1 inch 200 Nos, Screw full threaded 2 inch 200 Nos, Plastic wall screw anchor 2 inch 100 Nos, Plastic wall screw anchor 1 inch 100 Nos, Wire FRLS insulated with stranded copper conductor single core 1 Sqmm, Wire FRLS insulated with stranded copper conductor single core 1 point 5 Sqmm, Wire FRLS insulated with stranded copper conductor single core 2 point 5 Sqmm, MCB 10KA rep cap B series 230 volt grade 50 Hz ISI Marked 6 Amp Single Pole, MCB 10KA rep cap B series 230 volt grade 50 Hz ISI Marked 16 Amp Single Pole, Isolator double pole 63 Amp 10 KA rep capacity ISI marked 230 volt, Insulation tape 25mm width of 9 mtr long, PVC insulated and PVC over all sheathed aluminium conductor cable, Factory made sheet distribution board 12 way, PVC flexible pipe spiral 25 mm dia, PVCTee for casing caping 1 inch ISI marked, PVC elbow for casing caping 11 by 2 inch ISI marked, PVC L bend 25 mm dia, PVC Tee for casing caping 11 by 2 inch ISI marked, Generic 2 Port USB wall socket switch charger in KINNAUR, HIMACHAL PRADESH. Quantity: 8550. Submission Deadline: 29-08-2025 20: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

PUF Panel 60mm for wall , PUF Panel 40mm for ceiling , Pre painted galvalume aluminum zinc , 3 mm thick Polycarbonate sheet , Hollow iron , Angle flat iron , Nut and bolt , Earthing , Lightening Arrester , Main door , Window , Verandah Cover with Aluminium Frame , Fire extinguisher Ball Auto Fire Off , Curtain Rod , Supply only Stainless Steel premium fesue dual edge 8 pin , Fd Heating Device , Steel almirah large , Smart ortho Mattress Ultimate back pain relief , Electric Items , Foot Scraper , Iron Foot Mat , White cement , Looking Mirror , Double Bunks MS tubes with 12mm , Sealing material tube , Ordinary Portland Cement OPC 43 , Coarse sand sand shall be clean sharp , Stone aggregate shall be crushed stone 20mm , Stone aggregate shall be crushed stone 40mm , Stone aggregate shall be crushed stone 10mm , GVT tiles 10 to12mm thick square , Jute Mat of Size 600x450mm , Stainless Steel Shoe Rack Shoe Stand , Automatic Silver Shoes Shining Machine , Swing Open Top Dust Bin Stainless Steel , Supply only Transitional End Table with Open Shelves , Stainless Steel Heavy Duty Double Pole 3 layer , Stone aggregate shall be crushed stone not exceeding 63mm , Excavation for footing column and plinth , Returning Filling compaction , Removing of excated soil , 24 watt decorative ultra slim aluminium square profile LED lighting , 18 watt decorative ultra slim square profile LED lighting , Bulk head housing with LED bulb , LED 9 W bulb with ISI marked , Angle batten Lamp holder with 230 volt grade , Brown Matte Modular Electrical Switch 5 Amp , Brown Matte Modular Electrical Switch15 Amp , Ceiling rose with three terminals with ISI mark 230 Volt grade , PVC Round Square block with ISI marked , PVC Casing capping double locked box type 1inch x 6 feet , Casing capping double locked box type 1 point 5 inch x 6 feet , Gang Box 5 switches 5 Amps heavy duty , Gang Box 4 Swithces 5 Amps heavy duty , Gang Box 2 switches 5 Amps heavy duty , Gang Box 1 switch 5 Amps heavy duty , Screw full threaded 1 point 5 inch 200 Nos , Screw full threaded 1 inch 200 Nos , Screw full threaded 2 inch 200 Nos , Plastic wall screw anchor 2 inch 100 Nos , Plastic wall screw anchor 1 inch 100 Nos , Wire FRLS insulated with stranded copper conductor single core 1 Sqmm , Wire FRLS insulated with stranded copper conductor single core 1 point 5 Sqmm , Wire FRLS insulated with stranded copper conductor single core 2 point 5 Sqmm , MCB 10KA rep cap B series 230 volt grade 50 Hz ISI Marked 6 Amp Single Pole , MCB 10KA rep cap B series 230 volt grade 50 Hz ISI Marked 16 Amp Single Pole , Isolator double pole 63 Amp 10 KA rep capacity ISI marked 230 volt , Insulation tape 25mm width of 9 mtr long , PVC insulated and PVC over all sheathed aluminium conductor cable , Factory made sheet distribution board 12 way , PVC flexible pipe spiral 25 mm dia , PVCTee for casing caping 1 inch ISI marked , PVC elbow for casing caping 11 by 2 inch ISI marked , PVC L bend 25 mm dia , PVC Tee for casing caping 11 by 2 inch ISI marked , Generic 2 Port USB wall socket switch charger

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENTARMED FORCES TRIBUNAL

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8240741.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 77 Items Sign in for GEM prices

#1

PUF Panel 60mm for wall

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

212 sqm Delivery: 120 days
#2

PUF Panel 40mm for ceiling

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

122 sqm Delivery: 120 days
#3

Pre painted galvalume aluminum zinc

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

236 sqm Delivery: 120 days
#4

3 mm thick Polycarbonate sheet

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

66 sqm Delivery: 120 days
#5

Hollow iron

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

4,691 kg Delivery: 120 days
#6

Angle flat iron

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

804 kg Delivery: 120 days
#7

Nut and bolt

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

325 kg Delivery: 120 days
#8

Earthing

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 120 days
#9

Lightening Arrester

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 120 days
#10

Main door

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

6 nos Delivery: 120 days
#11

Window

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

14 nos Delivery: 120 days
#12

Verandah Cover with Aluminium Frame

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

56 sqm Delivery: 120 days
#13

Fire extinguisher Ball Auto Fire Off

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

4 nos Delivery: 120 days
#14

Curtain Rod

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

15 nos Delivery: 120 days
#15

Supply only Stainless Steel premium fesue dual edge 8 pin

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

40 nos Delivery: 120 days
#16

Fd Heating Device

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

3 nos Delivery: 120 days
#17

Steel almirah large

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

20 nos Delivery: 120 days
#18

Smart ortho Mattress Ultimate back pain relief

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

40 nos Delivery: 120 days
#19

Electric Items

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

1 ls Delivery: 120 days
#20

Foot Scraper

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

2 nos Delivery: 120 days
#21

Iron Foot Mat

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

2 nos Delivery: 120 days
#22

White cement

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

15 kg Delivery: 120 days
#23

Looking Mirror

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

2 nos Delivery: 120 days
#24

Double Bunks MS tubes with 12mm

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

20 each Delivery: 120 days
#25

Sealing material tube

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

5 set Delivery: 120 days
#26

Ordinary Portland Cement OPC 43

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

379 bag Delivery: 120 days
#27

Coarse sand sand shall be clean sharp

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

43 cum Delivery: 120 days
#28

Stone aggregate shall be crushed stone 20mm

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

15 cum Delivery: 120 days
#29

Stone aggregate shall be crushed stone 40mm

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

25 cum Delivery: 120 days
#30

Stone aggregate shall be crushed stone 10mm

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

24 nos Delivery: 120 days
#31

GVT tiles 10 to12mm thick square

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

578 nos Delivery: 120 days
#32

Jute Mat of Size 600x450mm

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

2 nos Delivery: 120 days
#33

Stainless Steel Shoe Rack Shoe Stand

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

8 nos Delivery: 120 days
#34

Automatic Silver Shoes Shining Machine

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

1 nos Delivery: 120 days
#35

Swing Open Top Dust Bin Stainless Steel

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

4 nos Delivery: 120 days
#36

Supply only Transitional End Table with Open Shelves

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

40 nos Delivery: 120 days
#37

Stainless Steel Heavy Duty Double Pole 3 layer

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

8 nos Delivery: 120 days
#38

Stone aggregate shall be crushed stone not exceeding 63mm

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

35 cum Delivery: 120 days
#39

Excavation for footing column and plinth

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

36 cum Delivery: 120 days
#40

Returning Filling compaction

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

20 cum Delivery: 120 days
#41

Removing of excated soil

SUPPLY AND CONSTRUCTION OF STORE LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

16 cum Delivery: 120 days
#42

24 watt decorative ultra slim aluminium square profile LED lighting

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

14 nos Delivery: 120 days
#43

18 watt decorative ultra slim square profile LED lighting

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

3 nos Delivery: 120 days
#44

Bulk head housing with LED bulb

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

6 nos Delivery: 120 days
#45

LED 9 W bulb with ISI marked

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

20 nos Delivery: 120 days
#46

Angle batten Lamp holder with 230 volt grade

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

20 nos Delivery: 120 days
#47

Brown Matte Modular Electrical Switch 5 Amp

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

55 nos Delivery: 120 days
#48

Brown Matte Modular Electrical Switch 5 Amp

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

16 nos Delivery: 120 days
#49

Brown Matte Modular Electrical Switch15 Amp

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

10 nos Delivery: 120 days
#50

Ceiling rose with three terminals with ISI mark 230 Volt grade

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

21 nos Delivery: 120 days
#51

PVC Round Square block with ISI marked

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

41 nos Delivery: 120 days
#52

PVC Casing capping double locked box type 1inch x 6 feet

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

60 nos Delivery: 120 days
#53

Casing capping double locked box type 1 point 5 inch x 6 feet

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

25 nos Delivery: 120 days
#54

Gang Box 5 switches 5 Amps heavy duty

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

10 nos Delivery: 120 days
#55

Gang Box 4 Swithces 5 Amps heavy duty

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

4 nos Delivery: 120 days
#56

Gang Box 2 switches 5 Amps heavy duty

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

3 nos Delivery: 120 days
#57

Gang Box 1 switch 5 Amps heavy duty

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

4 nos Delivery: 120 days
#58

Screw full threaded 1 point 5 inch 200 Nos

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

4 pkt Delivery: 120 days
#59

Screw full threaded 1 inch 200 Nos

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

2 pkt Delivery: 120 days
#60

Screw full threaded 2 inch 200 Nos

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

2 pkt Delivery: 120 days
#61

Plastic wall screw anchor 2 inch 100 Nos

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

4 pkt Delivery: 120 days
#62

Plastic wall screw anchor 1 inch 100 Nos

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

12 pkt Delivery: 120 days
#63

Wire FRLS insulated with stranded copper conductor single core 1 Sqmm

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

5 roll Delivery: 120 days
#64

Wire FRLS insulated with stranded copper conductor single core 1 point 5 Sqmm

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

12 roll Delivery: 120 days
#65

Wire FRLS insulated with stranded copper conductor single core 2 point 5 Sqmm

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

4 roll Delivery: 120 days
#66

MCB 10KA rep cap B series 230 volt grade 50 Hz ISI Marked 6 Amp Single Pole

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

10 nos Delivery: 120 days
#67

MCB 10KA rep cap B series 230 volt grade 50 Hz ISI Marked 16 Amp Single Pole

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

6 nos Delivery: 120 days
#68

Isolator double pole 63 Amp 10 KA rep capacity ISI marked 230 volt

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

3 nos Delivery: 120 days
#69

Insulation tape 25mm width of 9 mtr long

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

4 roll Delivery: 120 days
#70

PVC insulated and PVC over all sheathed aluminium conductor cable

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

100 mtrs Delivery: 120 days
#71

Factory made sheet distribution board 12 way

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

2 nos Delivery: 120 days
#72

PVC flexible pipe spiral 25 mm dia

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

30 rm Delivery: 120 days
#73

PVCTee for casing caping 1 inch ISI marked

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

15 nos Delivery: 120 days
#74

PVC elbow for casing caping 11 by 2 inch ISI marked

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

20 nos Delivery: 120 days
#75

PVC L bend 25 mm dia

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

36 nos Delivery: 120 days
#76

PVC Tee for casing caping 11 by 2 inch ISI marked

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

10 nos Delivery: 120 days
#77

Generic 2 Port USB wall socket switch charger

SUPPLY AND CONSTRUCTION OF ELECTRIC ITEMS LIST FOR AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS MENTIONED IN PDF DOCUMENT

20 nos Delivery: 120 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Reverse Auction Schedule

Completed

Start

04-Sep-2025, 11:00 am

End

05-Sep-2025, 11:00 am

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
eshaan construction co   Under PMA
-29-08-2025 13:04:11
2
GS Innovations   Under PMA
-28-08-2025 17:12:04
3
HANUMAN BUX & SONS   Under PMA
-29-08-2025 14:01:28
4
PLASTECO POLYTECH PRIVATE LIMITED   Under PMA
-29-08-2025 13:09:09
5
Triveni Sales Corporation   Under PMA
-28-08-2025 19:37:33

Financial Results

Rank Seller Price Item
L1
GS Innovations(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : PUF Panel 60mm for wall,PUF Panel 40mm for ceiling,Pre painted galvalume aluminum zinc,3 mm thick P
L2
PLASTECO POLYTECH PRIVATE LIMITED (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : PUF Panel 60mm for wall,PUF Panel 40mm for ceiling,Pre painted galvalume aluminum zinc,3 mm thick P
L3
Triveni Sales Corporation (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : PUF Panel 60mm for wall,PUF Panel 40mm for ceiling,Pre painted galvalume aluminum zinc,3 mm thick P
L4
HANUMAN BUX & SONS (MII)   Under PMA
Item Categories : PUF Panel 60mm for wall,PUF Panel 40mm for ceiling,Pre painted galvalume aluminum zinc,3 mm thick P