MCCB 125 TO 160 AMP ADJUSTABLE OVERLOAD RANGE BREAKING CAPACITY 25KVA 3 POLE MAKE SIEMENS L AND T M
Hmt Machine Tools Limited
Ajmer, RAJASTHAN
Bid Publish Date
27-Jan-2026, 2:21 pm
Bid End Date
17-Feb-2026, 3:00 pm
Location
Progress
Quantity
22
Category
MCCB Single pole 100 Amps 10KA Breaking Capacity
Bid Type
Two Packet Bid
Public procurement opportunity for Visakhapatnam Port Trust (vpt) MCCB Single pole 100 Amps 10KA Breaking Capacity, Single pole MCCB 100 Amps 10KA Breaking Capacity, MCCB Single pole 63 Amps 10KA Breaking Capacity, Single pole MCCB 63 Amps 10KA Breaking Capacity, 3 pole 40 to 50 Amps 415 Volts 50 Hz in VISAKHAPATNAM, ANDHRA PRADESH. Quantity: 22 issued by. Submission Deadline: 17-02-2026 15: 00: 00. View full details and respond.
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Hmt Machine Tools Limited
Ajmer, RAJASTHAN
Nmdc Limited
PANNA, MADHYA PRADESH
Kiocl Limited
DAKSHINA KANNADA, KARNATAKA
Indian Army
JAIPUR, RAJASTHAN
Durgapur Steel Plant
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | MCCB Single pole 100 Amps 10KA Breaking Capacity | MCCB Single pole 100 Amps 10KA Breaking Capacity Icu 100 percent Ics | 5 | pieces | [email protected] | 30 |
| 2 | Single pole MCCB 100 Amps 10KA Breaking Capacity | Single pole MCCB 100 Amps 10KA Breaking Capacity Icu 100 percent Ics | 4 | pieces | [email protected] | 30 |
| 3 | MCCB Single pole 63 Amps 10KA Breaking Capacity | MCCB Single pole 63 Amps 10KA Breaking Capacity Icu 100 percent Ics | 5 | pieces | [email protected] | 30 |
| 4 | Single pole MCCB 63 Amps 10KA Breaking Capacity | Single pole MCCB 63 Amps 10KA Breaking Capacity Icu 100 percent Ics | 4 | pieces | [email protected] | 30 |
| 5 | 3 pole 40 to 50 Amps 415 Volts 50 Hz | 3 pole 40 to 50 Amps 415 Volts 50 Hz AC 3 duty coil voltage | 4 | pieces | [email protected] | 30 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS