Progress
Quantity
2428
Category
Title1
Bid Type
Two Packet Bid
Irel (india) Limited invites bids for Title1, Title2, Title3, Title4, Title5, Title6, Title7, Title8, Title9, Title10, Title11, Title12, Title13, Title14, Title15, Title16, Title17 in ERNAKULAM, KERALA. Quantity: 2428. Submission Deadline: 30-04-2025 11: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Title1 , Title2 , Title3 , Title4 , Title5 , Title6 , Title7 , Title8 , Title9 , Title10 , Title11 , Title12 , Title13 , Title14 , Title15 , Title16 , Title17
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Title1
Supply of Radar level transmitter Details as per Sl No 1 in BOQ
Title2
Supply of Control Details as per Sl No 2 in BOQ
Title3
Supply of MS structural materials Details as per Sl No 3 in BOQ
Title4
Supply of FRP cable Tray Details as per Sl No 4 in BOQ
Title5
Supply of Thermoplastic Junction box Details as per Sl No 5 in BOQ
Title6
Supply of Thermoplastic Junction box Details as per Sl No 6 in BOQ
Title7
Supply of local Indicator meter Details as per Sl No 7 in BOQ
Title8
Supply of Miscellaneous items Details as per Sl No 8 in BOQ
Title9
Charges for erection and commissioning of Radar level transmitter Details as per Sl No 9 in BOQ
Title10
Charges for FRP work Details as per Sl No 10 in BOQ
Title11
Charges for structural work Details as per Sl No 11 in BOQ
Title12
Charges for Laying fixing Erection of FRP cable Tray Details as per Sl No 12 in BOQ
Title13
Charge for Laying glanding and termination of Control Details as per Sl No 13 in BOQ
Title14
Charge for Erection and commissioning of Thermoplastic Junction box Details as per Sl No 14 in BOQ
Title15
Charge for Erection and commissioning of Thermoplastic Junction box Details as per Sl No 15 in BOQ
Title16
Charge for installation of Indicator meter Details as per Sl No 16 in BOQ
Title17
Charge for Software programming Details as per Sl No 17 in BOQ
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Title1 | Supply of Radar level transmitter Details as per Sl No 1 in BOQ | 39 | numbers | bycon1.irel.kerala | 300 | |
| 2 | Title2 | Supply of Control Details as per Sl No 2 in BOQ | 600 | meters | bycon1.irel.kerala | 300 | |
| 3 | Title3 | Supply of MS structural materials Details as per Sl No 3 in BOQ | 500 | kilogram | bycon1.irel.kerala | 300 | |
| 4 | Title4 | Supply of FRP cable Tray Details as per Sl No 4 in BOQ | 50 | meters | bycon1.irel.kerala | 300 | |
| 5 | Title5 | Supply of Thermoplastic Junction box Details as per Sl No 5 in BOQ | 2 | numbers | bycon1.irel.kerala | 300 | |
| 6 | Title6 | Supply of Thermoplastic Junction box Details as per Sl No 6 in BOQ | 1 | numbers | bycon1.irel.kerala | 300 | |
| 7 | Title7 | Supply of local Indicator meter Details as per Sl No 7 in BOQ | 2 | numbers | bycon1.irel.kerala | 300 | |
| 8 | Title8 | Supply of Miscellaneous items Details as per Sl No 8 in BOQ | 1 | lot | bycon1.irel.kerala | 300 | |
| 9 | Title9 | Charges for erection and commissioning of Radar level transmitter Details as per Sl No 9 in BOQ | 39 | numbers | bycon1.irel.kerala | 300 | |
| 10 | Title10 | Charges for FRP work Details as per Sl No 10 in BOQ | 39 | numbers | bycon1.irel.kerala | 300 | |
| 11 | Title11 | Charges for structural work Details as per Sl No 11 in BOQ | 500 | kilogram | bycon1.irel.kerala | 300 | |
| 12 | Title12 | Charges for Laying fixing Erection of FRP cable Tray Details as per Sl No 12 in BOQ | 50 | meters | bycon1.irel.kerala | 300 | |
| 13 | Title13 | Charge for Laying glanding and termination of Control Details as per Sl No 13 in BOQ | 600 | meters | bycon1.irel.kerala | 300 | |
| 14 | Title14 | Charge for Erection and commissioning of Thermoplastic Junction box Details as per Sl No 14 in BOQ | 2 | numbers | bycon1.irel.kerala | 300 | |
| 15 | Title15 | Charge for Erection and commissioning of Thermoplastic Junction box Details as per Sl No 15 in BOQ | 1 | numbers | bycon1.irel.kerala | 300 | |
| 16 | Title16 | Charge for installation of Indicator meter Details as per Sl No 16 in BOQ | 1 | lot | bycon1.irel.kerala | 300 | |
| 17 | Title17 | Charge for Software programming Details as per Sl No 17 in BOQ | 1 | lumpsum | bycon1.irel.kerala | 300 |
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | KERALA STATE ELECTRONICS DEVELOPMENT CORPORATION LIMITED Under PMA | - | 30-04-2025 10:28:01 | |
| 2 | WADDAR ENGINEERING SERVICES LLP Under PMA | - | 24-04-2025 11:18:30 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | KERALA STATE ELECTRONICS DEVELOPMENT CORPORATION LIMITED Under PMA | Item Categories : Title1,Title2,Title3,Title4,Title5,Title6,Title7,Title8,Title9,Title10,Title11,Title12,Title13,Titl |
Key insights about KERALA tender market
The eligibility requirements include being a registered entity with proven expertise in providing monitoring systems. Bidders must demonstrate prior experience in similar projects and comply with all necessary regulatory requirements set forth by the issuing authority.
Vendors must provide relevant certifications demonstrating compliance with quality standards and regulatory norms. This includes ISO certifications and any industry-specific accreditations that validate the technical and operational capabilities.
The registration process requires suppliers to register on the relevant procurement platform, complete the necessary documentation, and submit their credentials for eligibility verification. Following registration, bidders can access detailed tender specifications and submit their proposals.
Submissions for this tender should include technical and financial documents in PDF format to ensure consistency and prevent alteration. Additional support files such as images or CAD drawings should also be in specified formats as per the submission guidelines.
The Tank Level Monitoring System must adhere to ISO standards related to instrumentation and control systems, ensuring high reliability and performance. It should be constructed using quality materials to resist operational wear, and have undergone thorough testing to meet the specified technical criteria.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS