The Indian Army, Department Of Military Affairs, invites bids for a combined power solution: an Online UPS (10 KVA) with an IS 16242 Part 1 compliant battery system and a 5 KVA Silent Generator Set. The project is located in IMPHAL WEST, MANIPUR – 795001. The bid requires submission of an EMD of ₹265,791 and a data sheet to verify technical parameters against offered equipment. An option clause allows quantity variation up to ±25% at contracted rates, with delivery timing tied to the last delivery order date. A site visit is optional at bidder expense with NDA obligations.
Online UPS 10 KVA with battery bank conforming to IS 16242 Part 1
Generator Set 5 KVA Silent
Input/Output: AC 50 Hz; voltage levels as per IS 16242 compatibility
Inbuilt isolation transformer presence required
Minimum UPS overload capacity specification to be met
Battery type and backup time clearly defined by bidder
Ingress Protection level to be stated
Mounting type of UPS and mounting enclosure requirements
EMD ₹265,791; bid documents and data sheet required
Quantity can vary up to ±25% with 30 days minimum extension
Optional site visit at bidder cost; NDA and indemnity required
Delivery to Imphal West, Manipur; data sheet must match product specs
PAN, GSTIN, cancelled cheque, EFT mandate must accompany bid
Not explicitly stated; bidders should confirm terms with issuing authority during bid process
Delivery period governed by last date of original delivery order; extended period for option clause; minimum 30 days for additional time
Not detailed; assess contract terms during bid clarification and penalties clause review
Not under liquidation or similar proceedings
Demonstrate financial stability with required documents
Submit mandatory data sheets and OEM authorizations
Quantity
58
Category
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1)
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
44
OEM Avg. Turnover
300
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) , Generator Set 5 KVA (Silent)
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
39
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
IMPHAL WEST
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | IMPHAL WEST | IMPHAL WEST | - | - | 7 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
BOQ
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT mandate certified by bank
EMD submission proof
Data Sheet of offered product(s) aligned to IS 16242 Part 1
Non-disclosure declaration on bidder letter head
OEM authorization if required for UPS and Generator Set
Vendor code creation documents
| Category | Specification | Requirement |
|---|---|---|
| Performance Parameters | Rating (in KVA) | 10 |
| Performance Parameters | Input Voltage (AC, 50 Hz) | Single Phase, 160V - 260V |
| Performance Parameters | Output Voltage (AC, 50 Hz) | Single Phase, 230V±1%, |
| Construction | Availability of Inbuilt Isolation Transformer | Yes, No |
| Construction | Minimum Overload Capacity of Online UPS | 120% of Rating in KVA for 10 minutes, 150% of Rating in KVA for 60 seconds |
| Battery/Backup Bank | Type of Battery | SMF-VRLA (Sealed Maintenance Free-Valve Regulated Lead Acid) / Stationary Lead Acid Batteries |
| Battery/Backup Bank | Backup Time | 180.0 |
| Features | Type of Mounting of Online UPS | Floor Standing |
| Features | Ingress Protection | IP20, IP21 Or higher |
Key insights about MANIPUR tender market
Bidders must submit the EMD ₹265,791, PAN, GSTIN, cancelled cheque, EFT mandate, NDA, and a data sheet aligned to IS 16242 Part 1. Ensure eligibility criteria, and prepare OEM authorizations if required. Site visit, if chosen, is at bidder cost with NDA compliance.
Key documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, EMD proof, Data Sheet, NDA, and OEM authorizations. Data Sheet must match offered UPS 10 KVA and Generator 5 KVA specifications; ensure IS 16242 Part 1 compliance.
The UPS must be 10 KVA with inbuilt isolation transformer, minimum overload capacity, IS 16242 Part 1 compliant battery, 50 Hz input/output, and specified backup time. The generator is 5 KVA Silent; both must meet IS standards and have proper ingress protection and mounting details.
Delivery follows the last date of the original delivery order; option to increase quantity by up to 25% at contracted rates; extended delivery period uses a minimum 30 days rule for adjustments.
EMD is ₹265,791. Payment terms are not fully specified; bidders should seek clarity during bid clarification. Ensure submission of EMD along with data sheet and other documents to qualify for evaluation.
Site visit is optional; bidders bear the costs. If chosen, provide NDA on bidder letterhead and indemnify buyer against liabilities arising from the visit; entry is subject to approval by consignee premises.
UPS must conform to IS 16242 Part 1 for online UPS with battery configurations; generator set must be silent and meet 5 KVA rating; data sheet alignment with technical parameters is mandatory to avoid rejection.
Submit a Data Sheet that precisely matches the UPS 10 KVA and Generator 5 KVA specifications; cross-check input/output voltages, overload capacity, isolation transformer presence, battery type, and backup time to ensure no parameter mismatches.