TenderDekho Logo
GEM

Contract Bidding Open For Handle,Handle,Tower Bolt,Tower Bolt,Sliding Door bolt,Sliding Door bolt,Handle,Handle,Tower Bolt,To in JAMNAGAR, GUJARAT

Bid Publish Date

20-Feb-2025, 11:58 am

Bid End Date

13-Mar-2025, 12:00 pm

EMD

₹24,400

Progress

Issue20-Feb-2025, 11:58 am
Technical13-03-2025 01:16:37
Financial
AwardCompleted
Explore all 5 tabs to view complete tender details

Quantity

2287

Category

Door bell

Bid Type

Two Packet Bid

Categories 95

Indian Army has released a public tender for Handle, Tower Bolt, Sliding Door bolt, Sliding Door Bolt, Cupboard Handle, Helical Door Spring, Die Cast Body Hydraulic door closer, Floor door Stopper, Door Lock, Magnatic Catcher, HW beeding, Nail, Screw, Plain glass, Figured glass, Wall Putty, Curtain Rod, Curtain Rod Braket, Curtain Rod Holder, Nails of Wdn beeding, Looking Mirror, Mirror cabinate, SS Coat Hook, Aluminium Hasp and Staple, Stainless steel Hasp, Hook and Eye, Plywood BWR, Tube, Tank Nipple, Tank Cover, Elbow, Socket, Union, Tee, Nipple, Adhiesive, Butt hinges, Thread Roll, Epoxy compound, Stop Cock, Angular Cock, Piller cock, Bip tap Head Washer, Connection Pipe, Waste pipe, Waste fitting, Couppling, Head for WHB Mixer, Health faucet, Flush tank, Jet Spray, EWC Seat cover, Over head shower rose, Wall Mixture, Towel rail, Soap dish, Glass corner shelves, Grating, Float valve, Bib cock, Concealed stop cock, Fancy tap, Flot valve, Syphone set for LLFC, Liquid Chemical, Flush Strip, Bib Tap Two way, Wire cloth, Wire Mesh, Hand Shower, Non returing valve, Over head shower, Two way angle cock, Water pipe, Coupler, Hinges, Flush Cistern, Brackets of MS, White Putty, Towel Ring, Bend, Floor trap round, Floor trap square, Clamp, SWR Pipe, Water tank, Tube light fitting LED, Switch Socket Combine, LED Lamp, Fan Capacitor, Door bell, Fan regulator, Bell Push switch, Switch, MCB, Calcium hypo chlorite, SCS 10 K Chlorite Dioxide, Alum Crystal, Sodium Hypo Chlorite, Poly Aluminium Chlorite in JAMNAGAR, GUJARAT. Quantity: 2287. Submission Deadline: 13-03-2025 12: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Handle , Tower Bolt , Sliding Door bolt , Sliding Door Bolt , Cupboard Handle , Helical Door Spring , Die Cast Body Hydraulic door closer , Floor door Stopper , Door Lock , Magnatic Catcher , HW beeding , Nail , Screw , Plain glass , Figured glass , Wall Putty , Curtain Rod , Curtain Rod Braket , Curtain Rod Holder , Nails of Wdn beeding , Looking Mirror , Mirror cabinate , SS Coat Hook , Aluminium Hasp and Staple , Stainless steel Hasp , Hook and Eye , Plywood BWR , Tube , Tank Nipple , Tank Cover , Elbow , Socket , Union , Tee , Nipple , Adhiesive , Butt hinges , Thread Roll , Epoxy compound , Stop Cock , Angular Cock , Piller cock , Bip tap Head Washer , Connection Pipe , Waste pipe , Waste fitting , Couppling , Head for WHB Mixer , Health faucet , Flush tank , Jet Spray , EWC Seat cover , Over head shower rose , Wall Mixture , Towel rail , Soap dish , Glass corner shelves , Grating , Float valve , Bib cock , Concealed stop cock , Fancy tap , Flot valve , Syphone set for LLFC , Liquid Chemical , Flush Strip , Bib Tap Two way , Wire cloth , Wire Mesh , Hand Shower , Non returing valve , Over head shower , Two way angle cock , Water pipe , Coupler , Hinges , Flush Cistern , Brackets of MS , White Putty , Towel Ring , Bend , Floor trap round , Floor trap square , Clamp , SWR Pipe , Water tank , Tube light fitting LED , Switch Socket Combine , LED Lamp , Fan Capacitor , Door bell , Fan regulator , Bell Push switch , Switch , MCB , Calcium hypo chlorite , SCS 10 K Chlorite Dioxide , Alum Crystal , Sodium Hypo Chlorite , Poly Aluminium Chlorite

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-7540505.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 173 Items Sign in for GEM prices

#1

Handle

Aluminium Handle 150mm Long ISI Marked

8 each Delivery: 45 days
#2

Handle

Aluminium Handle 100mm long ISI Marked

6 each Delivery: 45 days
#3

Tower Bolt

Aluminium Tower Bolt 150mm Long ISI Marked

7 each Delivery: 45 days
#4

Tower Bolt

Aluninium Tower Bolt 100mm Long ISI Marked

5 each Delivery: 45 days
#5

Sliding Door bolt

Aluminium Sliding Door bolt 250mm long ISI Marked

4 each Delivery: 45 days
#6

Sliding Door bolt

Aluminium Sliding Door bolt 300 mm long ISI Marked

4 each Delivery: 45 days
#7

Handle

Stainless steel Handle 150mm Long ISI Marked

4 each Delivery: 45 days
#8

Handle

Stainless Steel Handle 100mm Long ISI Marked

3 each Delivery: 45 days
#9

Tower Bolt

SS Tower Bolt 150mm Long ISI Marked

4 each Delivery: 45 days
#10

Tower Bolt

SS Tower Bolt 100mm Long ISI Marked

8 each Delivery: 45 days
#11

Sliding Door Bolt

Stainless Steel Sliding Door Bolt 250mm long and 16mm dia road ISI Marked

2 each Delivery: 45 days
#12

Cupboard Handle

Cupboard Handle Fancy Type SS

12 each Delivery: 45 days
#13

Helical Door Spring

Helical Door Spring 250mm Long Rat Tail ISI Marked

4 each Delivery: 45 days
#14

Die Cast Body Hydraulic door closer

Aluminum Die Cast Body Hydraulic door closer universal type 701 to 800mm long ISI Marked

2 each Delivery: 45 days
#15

Floor door Stopper

Aluminum Floor door Stopper 50mm long Double Leg ISI Marked

15 each Delivery: 45 days
#16

Door Lock

Door Lock for Aluminium door Mortise lock ISI Marked

1 each Delivery: 45 days
#17

Magnatic Catcher

Magnatic Catcher

2 each Delivery: 45 days
#18

HW beeding

1st class HW beeding 12mmx12mm

2 rm Delivery: 45 days
#19

Nail

Nail 2 inchLong

1 kg Delivery: 45 days
#20

Nail

Nail 1.5 inchLong

1 kg Delivery: 45 days
#21

Nail

Nail 3 inch Long

1 kg Delivery: 45 days
#22

Nail

Nail 4 inch Long

1 kg Delivery: 45 days
#23

Screw

Screw 35x5mm Long of 100 Each pkt

2 pkt Delivery: 45 days
#24

Screw

Screw 25x5mm Long of 100 Each Pkt

2 pkt Delivery: 45 days
#25

Screw

Screw 20x5mm Long of 100 Each Pkt

4 pkt Delivery: 45 days
#26

Plain glass

3mm thick plain glass

12 sqm Delivery: 45 days
#27

Figured glass

3mm thick figured glass

14 sqm Delivery: 45 days
#28

Plain glass

4mm thick plain glass

10 sqm Delivery: 45 days
#29

Wall Putty

Wall Putty

6 kg Delivery: 45 days
#30

Curtain Rod

25mm dia SS Curtain Rod

7 rm Delivery: 45 days
#31

Curtain Rod Braket

SS Curtain Rod Braket

7 pair Delivery: 45 days
#32

Curtain Rod Holder

SS Curtain Rod Holder

3 pair Delivery: 45 days
#33

Nails of Wdn beeding

Nails for Wiremesh

3 kg Delivery: 45 days
#34

Looking Mirror

Looking Mirror 450x600mm long with Aluminium frame with 5mm thick glass

3 each Delivery: 45 days
#35

Mirror cabinate

Mirror cabinate

1 each Delivery: 45 days
#36

SS Coat Hook

SS Coat Hook with 6 Each Hook

2 each Delivery: 45 days
#37

Aluminium Hasp and Staple

Aluminium Hasp and Staple 75mm Long ISI Marked

1 each Delivery: 45 days
#38

Stainless steel Hasp

Stainless steel Hasp 75mm Long ISI Marked

1 each Delivery: 45 days
#39

Hook and Eye

Aluminium Hook and Eye 100mm Long

1 each Delivery: 45 days
#40

Plywood BWR

Plywood BWR 6 mm thick 6ftx4ft ISI Marked

2 sqft Delivery: 45 days
#41

Plywood BWR

Plywood BWR 12 mm thick 6ftx4ft ISI Marked

15 sqft Delivery: 45 days
#42

Plywood BWR

Plywood BWR 18 mm thick 6ftx4ft ISI Marked

14 sqft Delivery: 45 days
#43

Plywood BWR

Plywood BWR 4 mm thick 6ftx4ft ISI Marked

10 sqft Delivery: 45 days
#44

Plywood BWR

Plywood BWR 8 mm thick 6ftx4ft ISI Marked

3 sqft Delivery: 45 days
#45

Plywood BWR

Plywood BWR 6 mm thick 8ftx4ft ISI Marked

3 sqft Delivery: 45 days
#46

Tube

GI Tubing 15mm bore dia medium grade ISI Marked

8 rm Delivery: 45 days
#47

Tube

GI Tubing 20 mm bore dia medium grade ISI Marked

5 rm Delivery: 45 days
#48

Tube

GI Tubing 25mm bore dia medium grade ISI Marked

9 rm Delivery: 45 days
#49

Tank Nipple

GI Tank Nipple 20mm with chaked nut and washer for OHT ISI Marked

14 each Delivery: 45 days
#50

Tank Nipple

GI Tank Nipple 25mm with Chaked Nut and Washer for OHT ISI Marked

12 each Delivery: 45 days
#51

Tank Cover

Tank Cover of capacity 500 ltr and 1000 Ltr in white and black cover

4 each Delivery: 45 days
#52

Elbow

GI Elbow 15mm ISI Marked ISI Marked

7 each Delivery: 45 days
#53

Socket

GI Socket 15mm ISI Marked ISI Marked

8 each Delivery: 45 days
#54

Union

GI Union 15mm ISI Marked ISI Marked

6 each Delivery: 45 days
#55

Tee

GI Tee 15mm ISI Marked

7 each Delivery: 45 days
#56

Nipple

GI Nipple 15x50mm ISI Marked

8 each Delivery: 45 days
#57

Nipple

GI Nipple 15x75mm ISI Marked

8 each Delivery: 45 days
#58

Nipple

GI Nipple 15x100 mm ISI Marked

8 each Delivery: 45 days
#59

Nipple

GI Nipple 15x150mm ISI Marked

14 each Delivery: 45 days
#60

Nipple

GI Nipple 15x200mm ISI Marked

9 each Delivery: 45 days
#61

Nipple

GI Nipple 15x250 mm ISI Marked

8 each Delivery: 45 days
#62

Elbow

GI Elbow 20mm ISI Marked

11 each Delivery: 45 days
#63

Socket

GI Socket 20mm ISI Marked

7 each Delivery: 45 days
#64

Union

GI Union 20mm ISI Marked

6 each Delivery: 45 days
#65

Tee

GI Tee 20mm ISI Marked

4 each Delivery: 45 days
#66

Nipple

GI Nipple 20x50mm ISI Marked

3 each Delivery: 45 days
#67

Nipple

GI Nipple 20x75mm ISI Marked

8 each Delivery: 45 days
#68

Adhiesive

Adhesive1 kg pack

6 each Delivery: 45 days
#69

Adhiesive

Adhesive 2 Kg pack

5 each Delivery: 45 days
#70

Butt hinges

MS Butt hinges 100mm ISI Marked

8 each Delivery: 45 days
#71

Butt hinges

MS Butt hinges 75 mm ISI Marked

5 each Delivery: 45 days
#72

Nipple

GI Nipple 20x100mm ISI Marked

4 each Delivery: 45 days
#73

Nipple

GI Nipple 20x150 mm ISI Marked

3 each Delivery: 45 days
#74

Nipple

GI Nipple 20x200mm ISI Marked

3 each Delivery: 45 days
#75

Nipple

GI Nipple 20x250mm ISI Marked

13 each Delivery: 45 days
#76

Thread Roll

Thread Roll for GI Pipes 12 Each in each pkt

3 each Delivery: 45 days
#77

Epoxy compound

Epoxy compound 1 Kg ISI Marked

7 each Delivery: 45 days
#78

Stop Cock

CP Stop Cock 15mm econy series in ISI Marked

5 each Delivery: 45 days
#79

Angular Cock

CP Angular Cock 15mm econmy series ISI Marked

10 each Delivery: 45 days
#80

Piller cock

Piller cock metal alloy casting water tap with quarter turn faucet ISI Marked

6 each Delivery: 45 days
#81

Bip tap Head Washer

CP Bip tap Head Washer ISI Marked

18 each Delivery: 45 days
#82

Connection Pipe

PVC Connection 15x450mm ISI Marked

9 each Delivery: 45 days
#83

Connection Pipe

PVC Connection 15x600mm ISI Marked

5 each Delivery: 45 days
#84

Waste pipe

PVC Waste pipe 32mm dia for WHB and Urinal ISI Marked

3 each Delivery: 45 days
#85

Waste fitting

CP Waste fitting of size 32 mm coupling ISI Marked

2 each Delivery: 45 days
#86

Couppling

Sink couppling 40mm ISI Marked

4 each Delivery: 45 days
#87

Head for WHB Mixer

Head for WHB Mixer

2 each Delivery: 45 days
#88

Health faucet

CP Health faucet 1.5m long tube ISI Marked

5 each Delivery: 45 days
#89

Flush tank

Push Button type flush tank of 10 ltr capacity ISI Marked

2 each Delivery: 45 days
#90

Jet Spray

CP Jet Spray with 1.50 mtr Long tupe ISI Marked

5 each Delivery: 45 days
#91

EWC Seat cover

EWC Seat cover ISI Marked

3 each Delivery: 45 days
#92

Over head shower rose

CP Over head shower rose 15mm dia with arms 150mm with flange ISI Marked

7 each Delivery: 45 days
#93

Wall Mixture

Wall Mixture for hot and cold water ISI Marked

1 each Delivery: 45 days
#94

Towel rail

CP Towel rail 600mm long ISI Marked

5 each Delivery: 45 days
#95

Soap dish

CP Soap dish ISI Marked

4 each Delivery: 45 days
#96

Glass corner shelves

Glass corner shelves

3 each Delivery: 45 days
#97

Grating

SS Grating 150 x 150mm with waste hole ISI Marked

6 each Delivery: 45 days
#98

Grating

SS Grating 150x 150mm Square without waste hole ISI Marked

4 each Delivery: 45 days
#99

Float valve

PTMT Float valve 20mm dia with aluminum rod and ball

5 each Delivery: 45 days
#100

Float valve

PTMT Float valve 25mm dia high pressure

1 each Delivery: 45 days
#101

Bib cock

Bib cock short body metal alloy casting water tap with half turn faucet ISI Marked

21 each Delivery: 45 days
#102

Bib cock

Bib cock long body metal alloy casting water tap with quarter turn faucet ISI Marked

17 each Delivery: 45 days
#103

Nipple

X Nipple 15 mm ISI Marked

6 each Delivery: 45 days
#104

Concealed stop cock

CP Concealed stop cock ISI Marked

5 each Delivery: 45 days
#105

Fancy tap

Fancy tap 15mm bronze

3 each Delivery: 45 days
#106

Waste pipe

PVC Waste pipe 750 mm length ISI Marked

14 each Delivery: 45 days
#107

Flot valve

PTMT Float valve 25mm dia with aluminum rod and bal

1 each Delivery: 45 days
#108

Syphone set for LLFC

Syphone set for LLFC

1 each Delivery: 45 days
#109

Liquid Chemical

Liquid Chemical for WPT in 1 ltr bottel ISI Marked

1 each Delivery: 45 days
#110

Flush Strip

Flush Strip 100mm wide 10 mtr long ISI Marked

1 each Delivery: 45 days
#111

Bib Tap Two way

CP Bib Tap Two way ISI Marked

1 each Delivery: 45 days
#112

Wire cloth

SS Wire cloth 0.36mm dia wire 1.40mm aperture 1.20x15 Mtr roll ISI Marked

3 each Delivery: 45 days
#113

Wire Mesh

GI Wire Mesh 0.36 mm dia wire 1.40 mm aperture 1.20 x15 mtr ISI Marked

3 each Delivery: 45 days
#114

Wire Mesh

GI Wire Mesh 0.90x15 Mtr roll ISI Marked

2 each Delivery: 45 days
#115

Hand Shower

Hand Shower ISI Marked

6 each Delivery: 45 days
#116

Non returing valve

Non returing valve 20mm ISI Marked

5 each Delivery: 45 days
#117

Non returing valve

Non returing valve 25 mm ISI Marked

9 each Delivery: 45 days
#118

Over head shower

Over head shower waterfall type fancy ISI Marked

1 each Delivery: 45 days
#119

Two way angle cock

CP Two way angle cock ISI Marked

4 each Delivery: 45 days
#120

Butt hinges

Butt hinges 100 mm SS ISI Marked

10 each Delivery: 45 days
#121

Butt hinges

Butt hinges 75 mm SS ISI Marked

12 each Delivery: 45 days
#122

Water pipe

Water pipe CPVC 15 mm ISI Marked

18 each Delivery: 45 days
#123

Water pipe

Water pipe CPVC 20 mm ISI Marked

18 each Delivery: 45 days
#124

Water pipe

Water pipe CPVC 25 mm ISI Marked

11 each Delivery: 45 days
#125

Coupler

CPVC Coupler 20 mm ISI Marked

12 each Delivery: 45 days
#126

Coupler

CPVC Coupler 25 mm ISI Marked

7 each Delivery: 45 days
#127

Elbow

CPVC Elbow 20 mm ISI Marked

7 each Delivery: 45 days
#128

Elbow

CPVC Elbow 25 mm ISI Marked

13 each Delivery: 45 days
#129

Hinges

Hinges PVC 100 mm ISI Marked

8 each Delivery: 45 days
#130

Hinges

Hinges PVC 75 MM ISI Marked

3 each Delivery: 45 days
#131

Flush Cistern

Flush Cistern handle PVC ISI Marked

8 each Delivery: 45 days
#132

Brackets of MS

WHB Brackets of MS ISI Marked

9 each Delivery: 45 days
#133

White Putty

White Putty ISI Marked

7 each Delivery: 45 days
#134

Towel Ring

Towel Ring Fancy ISI Marked

3 each Delivery: 45 days
#135

Towel Ring

Towel Ring PTMT ISI Marked

4 each Delivery: 45 days
#136

Bend

PVC Bend 75 mm dia ISI Marked

6 each Delivery: 45 days
#137

Bend

PVC Bend 110 mm ISI Marked

12 each Delivery: 45 days
#138

Floor trap round

PVC floor trap 110mm Round ISI Marked

9 each Delivery: 45 days
#139

Floor trap square

PVC floor trap 75 mm Square ISI Marked

2 each Delivery: 45 days
#140

Clamp

Clamp for PVC pipe 110 mm ISI Marked

9 each Delivery: 45 days
#141

Clamp

Clamp for PVC Pipe 75 mm ISI Marked

31 each Delivery: 45 days
#142

SWR Pipe

PVC SWR Pipe 75 mm dia ISI Marked

19 each Delivery: 45 days
#143

SWR Pipe

PVC SWR Pipe 110 mm dia ISI Marked

14 each Delivery: 45 days
#144

Water tank

HDPE water tank 500 ltr ISI Marked

7 each Delivery: 45 days
#145

Tube light fitting LED

Tube light fitting LED 20W 6500K ISI Marked

123 each Delivery: 45 days
#146

Tube light fitting LED

Tube light fitting LED 10W 6500K or 4000K ISI Marked

87 each Delivery: 45 days
#147

Switch Socket Combine

Switch Socket Combination 15 Amp 5 or 6 pin ISI Marked

28 each Delivery: 45 days
#148

Switch Socket Combine

Switch Socket Combination 5 Amp 5 or 6 pin ISI Marked

39 each Delivery: 45 days
#149

LED Lamp

LED Lamp 9 watt ISI Marked

41 each Delivery: 45 days
#150

LED Lamp

LED Lamp 7 watt ISI Marked

43 each Delivery: 45 days
#151

Fan Capacitor

Fan Capacitor 2.5 Mfd ISI Marked

78 each Delivery: 45 days
#152

Fan Capacitor

Fan Capacitor 3.15 Mfd ISI Marked

14 each Delivery: 45 days
#153

Door bell

Door bell Ding Dong ISI Marked

22 each Delivery: 45 days
#154

Fan regulator

Fan regulator mini type 120 watt Moduler Type ISI Marked

31 each Delivery: 45 days
#155

Bell Push switch

Bell Push switch PT ISI Marked

31 each Delivery: 45 days
#156

Switch

Switch 5 Amp PT 2 way ISI Marked

9 each Delivery: 45 days
#157

Switch

Switch 5 Amp PT ISI Marked

31 each Delivery: 45 days
#158

Switch

Switch 5 or 6 Amp Modular one way ISI Marked

9 each Delivery: 45 days
#159

Socket

Socket 15 or 16 Amp 5 or 6 pin Modular ISI Marked

15 each Delivery: 45 days
#160

Switch

Switch 15 Amp Modular one way ISI Marked

15 each Delivery: 45 days
#161

MCB

MCB SP 32 Amp ISI Marked

8 each Delivery: 45 days
#162

MCB

MCB SP 25 Amp ISI Marked

4 each Delivery: 45 days
#163

MCB

MCB SP 20 Amp ISI Marked

13 each Delivery: 45 days
#164

MCB

MCB SP 16 Amp ISI Marked

3 each Delivery: 45 days
#165

MCB

MCB SPN 240 Volt 40Apms ISI Marked

7 each Delivery: 45 days
#166

MCB

MCB SPN 240 Volt 25Apms ISI Marked

3 each Delivery: 45 days
#167

MCB

MCB SPN 240 Volt 32Apms ISI Marked

3 each Delivery: 45 days
#168

MCB

MCB SP 40 Amp ISI Marked

2 each Delivery: 45 days
#169

Calcium hypo chlorite

Calcium hypo chlorite ISO certified

344 each Delivery: 45 days
#170

SCS 10 K Chlorite Dioxide

SCS 10 K Chlorite Dioxide water BIS

49 each Delivery: 45 days
#171

Alum Crystal

Alum Crystal

64 each Delivery: 45 days
#172

Sodium Hypo Chlorite

Sodium Hypo Chlorite ISI Marked

151 each Delivery: 45 days
#173

Poly Aluminium Chlorite

Poly Aluminium Chlorite ISI Marked

88 each Delivery: 45 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
ARIHANT CORPORATION   Under PMA
-13-03-2025 01:16:37
2
JAY ENTERPRISE   Under PMA
-13-03-2025 00:16:11
3
JEET ENTERPRISE   Under PMA
-13-03-2025 01:33:39
4
PARSHWA ENTERPRISE   Under PMA
-12-03-2025 19:02:51

Financial Results

Rank Seller Price Item
L1
ARIHANT CORPORATION(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Handle,Handle,Tower Bolt,Tower Bolt,Sliding Door bolt,Sliding Door bolt,Handle,Handle,Tower Bolt,To
L2
JEET ENTERPRISE (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Handle,Handle,Tower Bolt,Tower Bolt,Sliding Door bolt,Sliding Door bolt,Handle,Handle,Tower Bolt,To
L3
JAY ENTERPRISE (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Handle,Handle,Tower Bolt,Tower Bolt,Sliding Door bolt,Sliding Door bolt,Handle,Handle,Tower Bolt,To
L4
PARSHWA ENTERPRISE (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Handle,Handle,Tower Bolt,Tower Bolt,Sliding Door bolt,Sliding Door bolt,Handle,Handle,Tower Bolt,To

Frequently Asked Questions

Key insights about GUJARAT tender market

What are the eligibility requirements for the tender GEM/2025/B/5965766?

The eligibility requirements include being a registered legal entity with experience in supplying hardware items. Bidders must also meet the financial turnover requirements and provide essential documentation, including OEM authorizations and compliance certifications, to ensure eligibility for participation in the tender process.

What specific certificates are needed for participation in this tender?

Bidders must submit several required certificates, including:

  • OEM Authorization Certificate
  • Compliance certificates as specified in the BoQ
  • Experience Certificates showcasing past performance related to similar supplies

These documents are crucial for bid validation and eligibility assessment.

What is the process for registration and submission in this tender?

The registration process involves creating an account on the designated procurement platform. Bid submission requires uploading all necessary documents in specified formats. It's essential to ensure that all required paperwork is submitted electronically, in compliance with the outlined guidelines to avoid disqualification.

What are the requirements concerning the Earnest Money Deposit (EMD) and performance security?

The EMD amount for this tender stands at ₹24,400. Bidders must ensure that this deposit is submitted alongside their proposal to secure their bid. Furthermore, performance security requirements will be outlined after the awarding of the contract to safeguard the performance obligations of the winning bidder.

How are submissions evaluated and how will results be notified?

The submissions will be evaluated based on a total value-wise evaluation process considering price, compliance with technical specifications, and overall documentation adherence. Results will be communicated through the official tender platform, where bidders can check the status of their proposals upon completion of the evaluation process.

By addressing these queries, we hope to provide clarity to potential bidders and facilitate a smooth tender process.