Goa Shipyard Limited Defence Production Tender Goa 2026 – 50% Quantity Variation Option Clause, GEM

Bid Publish Date

18-Feb-2026, 5:11 pm

Bid End Date

28-Feb-2026, 6:00 pm

Progress

Issue18-Feb-2026, 5:11 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

22

Category

DAME126733

Bid Type

Two Packet Bid

Categories 14

Tender Overview

Goa Shipyard Limited, operating under the Department Of Defence Production, initiates a defence procurement tender in South Goa, GOA with five BOQ items. The exact product category and item specifications are not disclosed in the tender excerpt, and the estimated value remains unspecified. A notable differentiator is the inclusion of an option clause permitting up to 50% quantity variation at contracted rates, impacting both initial ordering and during contract execution. The tender emphasizes flexibility in delivery timelines tied to the revised quantities, a critical consideration for bidders planning capacity.

Technical Specifications & Requirements

  • No explicit product specifications or technical parameters are provided in the excerpt.
  • BOQ comprises 5 items, all marked as N/A in quantity/unit details, signaling incomplete data in the available document.
  • The ATC document is uploaded by the buyer for terms clarification; bidders should review the ATC for any omitted technical requirements.
  • Key contractual mechanic: the purchaser may exercise quantity variations up to 50% of bid quantity and extend delivery time proportionally, with a minimum extension of 30 days. This implies bidders must model scalable manufacturing and logistics plans suitable for fluctuating orders.
  • Delivery period starts from the last date of original delivery order; extended periods follow the option formula, reinforcing the need for flexible production scheduling.

Terms, Conditions & Eligibility

  • EMD amount and exact tender value are not disclosed in the provided data.
  • The option clause is binding: quantity adjustments up to 50%, with corresponding delivery-time recalculations.
  • Delivery-time calculations use the formula: (Increased quantity ÷ Original quantity) × Original delivery period, subject to a minimum of 30 days.
  • The tender document references a Buyer Added ATC; bidders must carefully review the ATC for any organization-specific compliance, warranty or inspection terms.
  • The tender requires compliance with the extended delivery framework and associated contractual planning. Bidders should prepare for dynamic order quantities and scheduling.

Key Specifications

  • Item count: 5 items in BOQ

  • Delivery term: based on order date; extended delivery period provided by option clause

  • Quantity variation: up to 50% of bid quantity

  • Delivery-time adjustment formula: (Increased quantity ÷ Original quantity) × Original delivery period; minimum extension 30 days

  • ATC document: Buyer-uploaded for additional terms

Terms & Conditions

  • Quantity variation up to 50% during and after contract award

  • Delivery period tied to original and extended periods with minimum 30 days

  • EMD amount and precise values not disclosed in current data

Important Clauses

Payment Terms

Not explicitly disclosed in available data; bidders should verify in ATC and final tender documents.

Delivery Schedule

Original delivery period governs baseline; extended period calculated by the option formula with a minimum of 30 days.

Penalties/Liquidated Damages

Not specified in current excerpt; consult ATC for LD rates and remedies.

Bidder Eligibility

  • Ability to demonstrate defence/shipbuilding procurement experience

  • Compliance with GST, PAN, and financial solvency requirements

  • Authorized to bid as OEM agent or with OEM authorization

Documents 5

GeM-Bidding-9007794.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 DAME126733 FUEL INJECTORS FOR 750KW MAIN DG 16 nos con3.gsl 15
2 DAME126732 HP FUEL PUMP INLET SOLENOID VALVE (MPROP) FOR 750KW DG 1 nos con3.gsl 15
3 DAME126735 ROTARY HP FUEL PUMPS OF 750KW MAIN DG 2 nos con3.gsl 15
4 DAME126736 LIFT PUMP UNIT WITH FUEL FILTERS OF 750KW MAIN DG 2 nos con3.gsl 15
5 DAME126737 COMMON RAIL FOR 1 BANK OF 750KW MAIN DG 1 nos con3.gsl 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates in defence/shipbuilding procurement

4

Financial statements (latest audited, to demonstrate financial stability)

5

EMD deposition proof (amount not disclosed in data) and payment method details

6

Technical bid documents and product/service compliance statements

7

OEM authorizations or principal confirmations (if bidding as an authorized reseller)

8

ATC/viewer acknowledgement from Buyer Added Terms and Conditions

Frequently Asked Questions

Key insights about GOA tender market

How to participate in Goa Shipyard Limited defence tender in Goa 2026?

Bidders should submit GST registration, PAN, financial statements, experience certificates, and EMD documentation; review the ATC for any OEM authorizations and technical compliance statements. Ensure readiness to manage up to 50% quantity variation and follow the extended delivery timelines.

What documents are required for the Goa GEM tender submission?

Required documents include GST certificate, PAN, audited financial statements, experience certificates in defence procurement, EMD proof, technical bid, and OEM authorizations if bidding as an agent; ATC may specify additional bidder qualifications.

What are the delivery time implications with the 50% quantity option in Goa tender?

Delivery periods can extend according to the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days; bidders must plan scalable production and logistics to meet fluctuating orders.

What is the EMD amount for the Goa defence tender 2026?

The exact EMD amount is not disclosed in the provided tender excerpt; bidders should consult the final tender documents or ATC to confirm the required security deposit and mode of payment.

What standards or ATC requirements apply to this Goa tender?

An ATC document exists for Buyer-specific terms. Bidders must review the ATC for any certifications, warranty terms, inspection norms, or performance criteria that bind the contract and ensure compliance with organization standards.

What is the scope of items in the Goa GEM BOQ 5 items?

The BOQ lists 5 items with all quantities marked as N/A in the available data; bidders should obtain the final BOQ and item specifications from the tender portal and ATC to align technical bids.

How does the delivery deadline change with quantity adjustments in this tender?

Delivery deadlines scale with quantity via the stated formula; bidders must calculate revised timelines per increased order proportion and maintain minimum lead times to avoid penalties.

What are the key eligibility criteria for bidders in Goa defence procurement?

Eligibility includes defence procurement experience, GST and PAN compliance, financial stability, and OEM authorizations if bidding as a partner; ensure capacity to absorb quantity fluctuations and conform to ATC terms.