TenderDekho Logo
Active GEM

Government Tender Published for Copper conductor cable,Copper conductor cable,Copper conductor cable,Copper conductor cable,Copper in KURNOOL, ANDHRA PRADESH

Bid Publish Date

10-Aug-2026, 4:33 pm

Bid End Date

01-Sep-2026, 11:00 am

Progress

Issue10-Aug-2026, 4:33 pm
AwardPending

Indian Institute Of Information Technology (iiit) announces a tender for Copper conductor cable, Electrical Switches, Electrical Sockets, Fan Regulator, Electrical Material, LED Lamps, Exhaust Fans, Tool Kit in KURNOOL, ANDHRA PRADESH. Quantity: 8669. Submission Deadline: 01-09-2026 11: 00: 00. Last date to apply is approaching fast!

Tender Data

Bid Details

Quantity

8669

Category

LED Lamps

Bid Type

Single Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Copper conductor cable , Electrical Switches , Electrical Sockets , Fan Regulator , Electrical Material , LED Lamps , Exhaust Fans , Tool Kit

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

15

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Kurnool

Delivery Pincodes

518007

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Eeram Krishna Murthy518007,Jagannathagattu Kurnool ANDHRA PRADESHKurnoolAndhra Pradesh51800745030-

Authority Records

MINISTRY OF EDUCATIONHIGHER EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9722101.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 61 Items Sign in for GEM prices

#1

Copper conductor cable

1.5 Sq mm ISI marked, FRLS PVC insulated, single core copper conductor cable

450 meter Delivery: 30 days
#2

Copper conductor cable

1.5 Sq mm ISI marked, FRLS PVC insulated, single core copper conductor cable

450 meter Delivery: 30 days
#3

Copper conductor cable

1.5 Sq mm ISI marked, FRLS PVC insulated, single core copper conductor cable

630 meter Delivery: 30 days
#4

Copper conductor cable

2.5 Sq mm ISI marked, FRLS PVC insulated, single core copper conductor cable

900 meter Delivery: 30 days
#5

Copper conductor cable

2.5 Sq mm ISI marked, FRLS PVC insulated, single core copper conductor cable

900 meter Delivery: 30 days
#6

Copper conductor cable

4 Sq mm ISI marked, FRLS PVC insulated, single core copper conductor cable

900 meter Delivery: 30 days
#7

Copper conductor cable

4 Sq mm ISI marked, FRLS PVC insulated, single core copper conductor cable

900 meter Delivery: 30 days
#8

Copper conductor cable

2.5 Sq mm ISI marked, FRLS 3-core copper conductor cable

180 meters Delivery: 30 days
#9

Copper conductor cable

1.5 Sq mm ISI marked, FRLS 3-core copper conductor cable

180 meters Delivery: 30 days
#10

Electrical Switches

S.P. 6 A, one-way modular switch, ISI marked

250 each Delivery: 30 days
#11

Electrical Switches

S.P. 6 A, one-way modular switch, ISI marked

150 each Delivery: 30 days
#12

Electrical Switches

S.P. 16 A, one-way modular switch, ISI marked

250 each Delivery: 30 days
#13

Electrical Switches

S.P. 16 A, one-way modular switch, ISI marked

150 each Delivery: 30 days
#14

Electrical Sockets

3 pin 6 A modular socket outlet, ISI marked

250 each Delivery: 30 days
#15

Electrical Sockets

3 pin 6 A modular socket outlet, ISI marked

150 each Delivery: 30 days
#16

Electrical Sockets

6 pin 16 A modular socket outlet, ISI marked

250 each Delivery: 30 days
#17

Electrical Sockets

6 pin 16 A modular socket outlet, ISI marked

150 each Delivery: 30 days
#18

Fan Regulator

Stepped type Modular Fan regulator 2 module

100 each Delivery: 30 days
#19

Electrical Material

Modular base and cover plate for 2 modules

20 each Delivery: 30 days
#20

Electrical Material

Modular base and cover plate for 3 modules

30 each Delivery: 30 days
#21

Electrical Material

Modular base and cover plate for 4 modules

15 each Delivery: 30 days
#22

Electrical Material

Modular base and cover plate for 6 modules

100 each Delivery: 30 days
#23

Electrical Material

Modular base and cover plate for 8 modules

40 each Delivery: 30 days
#24

Electrical Material

Modular base and cover plate for 12 modules

70 each Delivery: 30 days
#25

Electrical Material

Modular switch board and Sheets for 16 modules

10 each Delivery: 30 days
#26

Electrical Material

Modular switch board for 12 modules

70 each Delivery: 30 days
#27

Electrical Material

Modular switch board for 8 modules

40 each Delivery: 30 days
#28

Electrical Material

Modular switch board for 6 modules

100 each Delivery: 30 days
#29

Electrical Material

Modular switch board for 4 modules

15 each Delivery: 30 days
#30

Electrical Material

Modular switch board for 3 modules

30 each Delivery: 30 days
#31

Electrical Material

Modular switch board for 2 modules

20 each Delivery: 30 days
#32

Electrical Material

SS Command box

50 each Delivery: 30 days
#33

Electrical Material

Extension Box

30 each Delivery: 30 days
#34

LED Lamps

LED Batten light System lumen efficiency greater than135 Im per Watt

70 each Delivery: 30 days
#35

LED Lamps

Smart Thread bulb with Edison screw10W

30 each Delivery: 30 days
#36

LED Lamps

2 feet reading Tube Light 10W

50 each Delivery: 30 days
#37

Exhaust Fans

Exhaust fans 9 inches 1400RPM with Steel

5 each Delivery: 30 days
#38

Exhaust Fans

Exhaust fans 9 inches 1400RPM with Fiber

5 each Delivery: 30 days
#39

Electrical Material

Fan capacitor 2.5 MFD

200 each Delivery: 30 days
#40

Electrical Material

Round Surface light 15W

30 each Delivery: 30 days
#41

Electrical Material

Sigma Instruments Digital Battery Powered Multimeter Sigma 22ATRMS 6000 Counts

2 each Delivery: 30 days
#42

Electrical Material

Sigma Instruments Digital Smart Ac Clamp Meter Sigma Mtq 679 TRMS Red

2 each Delivery: 30 days
#43

Electrical Material

Wire Stripper

5 each Delivery: 30 days
#44

Tool Kit

Double Sided Combination Spanner Set CSS25 from CS06 to CS 32

2 set Delivery: 30 days
#45

Electrical Material

3- pin Plug top 6A

50 each Delivery: 30 days
#46

Electrical Material

3- pin Plug top 16A

50 each Delivery: 30 days
#47

Electrical Material

Three fourths inch PVC pipes

100 each Delivery: 30 days
#48

Electrical Material

Three fourths inch PVC bends

100 each Delivery: 30 days
#49

Electrical Material

1 inch PVC pipes

30 each Delivery: 30 days
#50

Electrical Material

1 inch PVC bends

50 each Delivery: 30 days
#51

Electrical Material

Three fourths inches Screws

5 box Delivery: 30 days
#52

Electrical Material

one fourth inches Screws

5 box Delivery: 30 days
#53

Electrical Material

1 inches Screws

4 box Delivery: 30 days
#54

Electrical Material

2 inches Screws

2 box Delivery: 30 days
#55

Electrical Material

3 inches Screws

2 box Delivery: 30 days
#56

Electrical Material

1 inch PVC Clamps

2 box Delivery: 30 days
#57

Electrical Material

Three fourths inch PVC Clamps

2 box Delivery: 30 days
#58

Electrical Material

5 Step Fan regulator with 1Modular

15 each Delivery: 30 days
#59

Electrical Material

70 mm FD Capacitor

10 each Delivery: 30 days
#60

Electrical Material

Electrical Tester

6 each Delivery: 30 days
#61

Electrical Material

Cobmination Plier

5 each Delivery: 30 days

Categories 53

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

OEM Authorization Certificate

2

OEM Annual Turnover

3

Additional Doc 1 (Requested in ATC)

4

Additional Doc 2 (Requested in ATC)

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer