Indian Army Department of Military Affairs 37 Item Spare Parts Tender India 2026: Supply, Installation, Testing & Commissioning

Bid Publish Date

07-Oct-2026, 8:13 pm

Bid End Date

17-Oct-2026, 9:00 pm

Progress

Issue07-Oct-2026, 8:13 pm
AwardPending

Tender Overview

The Indian Army, Department Of Military Affairs, is inviting bids for a comprehensive spare parts procurement package comprising 37 items spanning Wind Screen Front, Link Track Rod, Bucket Teeth, Bucket Side Cutter, Teeth Nut and Bolt 30mm, Bucket Bush, Bucket Sim, Bucket Pin Lock Nut and Bolt, Engine Oil Filter, Fuel Filter (Magnetic & Primary), Air Filter (Inner & Outer), Break Friction Plate, Grease Nipple 10 and 11mm, Rope Spray lubricant, Eather Capsule, Benjo Bolt/Washer (various sizes), Injector Returning Line, Hose assemblies, Air Line with adapter, Ex 70 Shelf Repairs, Break Master Cylinder Assy Repairs, Field Coil, Metal Bush Set, Press Pipe Gas Cylinder, Armature, Retainer, Washer, Collet, Gasket, Oil Seal, Spacer, Cotter Pin. The scope includes Supply, Installation, Testing and Commissioning with a possibly varied quantity up to 25% as per option clause. The procurement supports critical military equipment maintenance and requires a service centre in the consignee state or establishment within 30 days post award. The estimated value and delivery specifics are not disclosed in the data provided, but the contract contemplates on-site or carrier support depending on warranty. This tender targets vendors capable of rapid design approvals and adherence to buyer-drawn specifications. Tender is aligned with GEM portal processes and 2026 procurement norms for the Indian Army.

  • Target location and procurement context: tender in India for the Indian Army’s vehicle/machinery spare parts.
  • Key differentiator: option clause enabling up to 25% quantity variation; detailed design drawings due within 5 days of award.
  • Unique aspects: on-site/off-site warranty considerations and 30-day establishment requirement for service centres.

Key Specifications

  • 37 listed spare parts across multiple categories (filters, bushings, bolts, seals, etc.)

  • Supply, installation, testing & commissioning scope

  • Option to increase quantity up to 25% during contract execution

  • Delivery period adjustments without LD for buyer-approved drawing delays

  • Service centre presence in each consignee's state or establishment within 30 days

Terms & Conditions

  • Option Clause allows up to 25% quantity variation

  • 5-day window to submit Detailed Design Drawings after award

  • Service centre establishment within 30 days of award

Important Clauses

Payment Terms

Payment terms not specified; anticipate milestone-based payments post-acceptance per standard GEM/DM guidelines.

Delivery Schedule

Delivery commences from last date of original delivery order; extended delivery period based on increased quantity per formula.

Penalties/Liquidated Damages

Penalty details not provided; ensure compliance with detailed design approval timelines to avoid delays.

Bidder Eligibility

  • Functional service centre presence in the State of every consignee or capability to establish within 30 days

  • Compliance with NDA and Detailed Design Drawings submission within 5 days of award

  • PAN, GSTIN, cancelled cheque, EFT mandate documents furnished with bid

Advertisement

Tender Data

Bid Details

Quantity

578

Category

Coller

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

OEM Avg. Turnover

1

Past Performance

80 %

Warranty Period

2 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Wind Screen Front , Link Track Rod , Bucket Teeth , Bucket Side Cutter , Teeth Nut and Bolt 30mm , Bucket Bush , Bucket Sim , Bucket Pin Lock nut and bolt , Engine Oil Filter , Fuel Filter Magnetic , Fuel Filter Primary , Air Filter Inner and Outer , Break Friction Plate , Grease Nipple 10 and 11mm , Rope Spray lubricant , Eather Capsule , Benjo Bolt 19mm , Benjo Washer 19mm , Benjo Bolt 17mm , Benjo Washer 17mm , Injector returning Line , Benjo Washer 10mm , Hose with Nozal and adapter , Air Line with adapter , Ex 70 Shelf Repairs , Break Master Cylinder Assy Repairs , Field Coil , Metal Bush Set , Press Pipe Gas Cylinder , Armature , Retainer , Washer , Coller , Gasket , Oil Seal , Spacer , Cotter Pin

Pre-Bid & Qualification

Pre-Bid Date

13-10-2026 11:00:00

Pre-Bid Venue

At the office of OC FD PK 15 ENGR REGT Near Rinchen Auditorium Leh Ladakh

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

LEH

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-LEHLEH--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9998102.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 37 Items Sign in for GEM prices

#1

Wind Screen Front

JCB 3dx

1 pieces Delivery: 15 days
#2

Link Track Rod

JCB 3dx

4 pieces Delivery: 15 days
#3

Bucket Teeth

JCB 3dx

20 pieces Delivery: 15 days
#4

Bucket Side Cutter

JCB 3dx

10 pieces Delivery: 15 days
#5

Teeth Nut and Bolt 30mm

JCB 3dx

40 pieces Delivery: 15 days
#6

Bucket Bush

JCB 3dx

10 pieces Delivery: 15 days
#7

Bucket Sim

JCB 3dx

15 pieces Delivery: 15 days
#8

Bucket Pin Lock nut and bolt

JCB 3dx

20 pieces Delivery: 15 days
#9

Engine Oil Filter

JCB 3dx

5 pieces Delivery: 15 days
#10

Fuel Filter Magnetic

JCB 3dx

5 pieces Delivery: 15 days
#11

Fuel Filter Primary

JCB 3dx

5 pieces Delivery: 15 days
#12

Air Filter Inner and Outer

JCB 3dx

5 pieces Delivery: 15 days
#13

Break Friction Plate

JCB 3dx

2 pieces Delivery: 15 days
#14

Grease Nipple 10 and 11mm

JCB 3dx

50 pieces Delivery: 15 days
#15

Rope Spray lubricant

JCB 3dx

2 pieces Delivery: 15 days
#16

Eather Capsule

JCB 3dx

100 pieces Delivery: 15 days
#17

Benjo Bolt 19mm

JCB 3dx

50 pieces Delivery: 15 days
#18

Benjo Washer 19mm

JCB 3dx

50 pieces Delivery: 15 days
#19

Benjo Bolt 17mm

JCB 3dx

50 pieces Delivery: 15 days
#20

Benjo Washer 17mm

JCB 3dx

50 pieces Delivery: 15 days
#21

Injector returning Line

JCB 3dx

2 pieces Delivery: 15 days
#22

Benjo Washer 10mm

JCB 3dx

50 pieces Delivery: 15 days
#23

Hose with Nozal and adapter

JCB 3dx

5 pieces Delivery: 15 days
#24

Air Line with adapter

JCB 3dx

2 pieces Delivery: 15 days
#25

Ex 70 Shelf Repairs

Ex 70

1 pieces Delivery: 15 days
#26

Break Master Cylinder Assy Repairs

Ex 70

1 pieces Delivery: 15 days
#27

Field Coil

JCB 3dx

1 pieces Delivery: 15 days
#28

Metal Bush Set

JCB 3dx

1 pieces Delivery: 15 days
#29

Press Pipe Gas Cylinder

JCB 3dx

1 pieces Delivery: 15 days
#30

Armature

JCB 3dx

1 pieces Delivery: 15 days
#31

Retainer

OBM 30HP

1 pieces Delivery: 15 days
#32

Washer

OBM 30HP

5 pieces Delivery: 15 days
#33

Coller

OBM 30HP

3 pieces Delivery: 15 days
#34

Gasket

OBM 30 HP

2 pieces Delivery: 15 days
#35

Oil Seal

OBM 30 HP

1 pieces Delivery: 15 days
#36

Spacer

OBM 30 HP

2 pieces Delivery: 15 days
#37

Cotter Pin

OBM 30 HP

5 pieces Delivery: 15 days
Advertisement

Categories 39

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate certified by bank

5

Non-disclosure declaration on bidder letterhead

6

Detailed Design Drawings (within 5 days of award) with buyer approval

7

OEM authorization (if applicable) and service centre details

8

Any existing certifications or quality approvals relevant to 37 spare parts

Frequently Asked Questions

How to bid on Indian Army spare parts tender in India 2026

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate with the bid; provide Non-Disclosure Declarations and Detailed Design Drawings within 5 days of award. Ensure 37 item scope and supply–installation–testing–commissioning. Prepare service centre readiness in each consignee state within 30 days.

What are the eligibility criteria for this tender in India 2026

Eligibility includes a functional service centre in each consignee state or the ability to establish within 30 days; submission of PAN, GSTIN, NDA, EFT mandate, and detailed drawings within deadlines; capability to supply 37 identified spare parts with proper OEM/authorization if required.

Which documents are required for bid submission in this Army tender

Required documents include PAN Card, GSTIN, cancelled cheque, EFT Mandate, NDA on bidder letterhead, and Detailed Design Drawings within 5 days; OEM authorizations and service centre details should be included if applicable.

What are the technical requirements for the 37 spare parts tender

Parts cover filters, bushings, bolts, gaskets, seals, cotter pins, and related hardware; no explicit iso/is standards listed; bidders must align to buyer-approved drawings and modifications within 7 days; ensure fitment accuracy and military-grade tolerances.

What is the delivery timeline and option clause for this procurement

Delivery starts after original delivery order date; quantity can be increased by up to 25% under the option clause; extended delivery time uses a formula based on increased vs original quantity with a minimum of 30 days.

What service/support requirements are specified for this Army contract

A functional service centre in each consignee state is required for carry-in warranty; if not existing, establish within 30 days post award; on-site warranty may apply depending on item and supplier terms.

When are the drawings approvals and modifications due for this tender

Detailed Design Drawings must be submitted within 5 days of award; buyer will approve or issue a modification list within 7 days; implementation of modifications is required to proceed with supply and fabrication.

What is the expected scope of supply for the Army spare parts tender

Scope includes supply, installation, testing and commissioning of 37 items; the BOQ lists items with N/A quantities but total items fixed at 37; ensure complete lifecycle support, including testing and commissioning at the designated sites.