TenderDekho Logo
Active GEM

Procurement Opportunity: Copper Wire,Bulb,Combined Box,LED Bulb,Exhaust Fan,Ceiling Rod,Tube Light,6A MCB,Halogen LED Light, in BAGPAT, UTTAR PRADESH

Bid Publish Date

13-Oct-2026, 4:10 pm

Bid End Date

23-Oct-2026, 8:00 pm

Progress

Issue13-Oct-2026, 4:10 pm
AwardPending

A tender has been published for Directorate Of Technical Education Government Of Uttar Pradesh Copper Wire, Bulb, Combined Box, LED Bulb, Exhaust Fan, Ceiling Rod, Tube Light, 6A MCB, Halogen LED Light, Fan Sheet, Tap Vidyut, Brass Screw, Gypsum Screw, Modular Box, Hacksaw Blade, Bend Packet, Gitti, Pliers, Tester, Washer, Socket, Switch, MCB, Conduit pipe, Flexible pipe, Button, Button Holder, Backlight Sheet, Cable Nail Clip Clamp, W PVC Wall Panel, Paint Black, Paint Grey, Paint Offwhite, Tarpeen Oil, Apron, POP, White Cement, Interior Paint White, Primer Paint, Violet, Yellow in BAGPAT, UTTAR PRADESH. Quantity: 1972 by. Submission Deadline: 23-10-2026 20: 00: 00. Check eligibility and apply.

Advertisement

Tender Data

Bid Details

Quantity

1972

Category

Gitti

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Copper Wire , Bulb , Combined Box , LED Bulb , Exhaust Fan , Ceiling Rod , Tube Light , 6A MCB , Halogen LED Light , Fan Sheet , Tap Vidyut , Brass Screw , Gypsum Screw , Modular Box , Hacksaw Blade , Bend Packet , Gitti , Pliers , Tester , Washer , Socket , Switch , MCB , Conduit pipe , Flexible pipe , Button , Button Holder , Backlight Sheet , Cable Nail Clip Clamp , W PVC Wall Panel , Paint Black , Paint Grey , Paint Offwhite , Tarpeen Oil , Apron , POP , White Cement , Interior Paint White , Primer Paint , Violet , Yellow

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Meerut

Delivery Pincodes

250617

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Nikhil Kushwaha250617,GOVERNMENT POLYTECHNIC KIRTHAL BAGHPATMeerutUttar Pradesh250617115-

Authority Records

TECHNICAL EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10028857.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Directorate Of Technical Education, Up, Kanpur

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 50 Items Sign in for GEM prices

#1

Copper Wire

With Installation Specification attached in ATC

1 bundle Delivery: 15 days
#2

Bulb

With Installation Specification attached in ATC

1 box Delivery: 15 days
#3

Combined Box

With Installation Specification attached in ATC

1 pieces Delivery: 15 days
#4

LED Bulb

With Installation Specification attached in ATC

9 pieces Delivery: 15 days
#5

Exhaust Fan

With Installation Specification attached in ATC

5 pieces Delivery: 15 days
#6

Ceiling Rod

With Installation Specification attached in ATC

30 pieces Delivery: 15 days
#7

Tube Light

With Installation Specification attached in ATC

30 pieces Delivery: 15 days
#8

6A MCB

With Installation Specification attached in ATC

1 pieces Delivery: 15 days
#9

Halogen LED Light

With Installation Specification attached in ATC

2 pieces Delivery: 15 days
#10

Fan Sheet

With Installation Specification attached in ATC

30 pieces Delivery: 15 days
#11

Tap Vidyut

With Installation Specification attached in ATC

10 pieces Delivery: 15 days
#12

Brass Screw

With Installation Specification attached in ATC

100 pieces Delivery: 15 days
#13

Copper Wire

With Installation Specification attached in ATC

2 bundle Delivery: 15 days
#14

Copper Wire

With Installation Specification attached in ATC

5 bundle Delivery: 15 days
#15

Gypsum Screw

With Installation Specification attached in ATC

50 pieces Delivery: 15 days
#16

Modular Box

With Installation Specification attached in ATC

13 pieces Delivery: 15 days
#17

Modular Box

With Installation Specification attached in ATC

7 pieces Delivery: 15 days
#18

Hacksaw Blade

With Installation Specification attached in ATC

5 pieces Delivery: 15 days
#19

Modular Box

With Installation Specification attached in ATC

1 pieces Delivery: 15 days
#20

Bend Packet

With Installation Specification attached in ATC

4 pieces Delivery: 15 days
#21

Gitti

With Installation Specification attached in ATC

3 pkt Delivery: 15 days
#22

Pliers

With Installation Specification attached in ATC

1 pieces Delivery: 15 days
#23

Tester

With Installation Specification attached in ATC

1 pieces Delivery: 15 days
#24

Washer

With Installation Specification attached in ATC

3 pieces Delivery: 15 days
#25

Socket

With Installation Specification attached in ATC

26 pieces Delivery: 15 days
#26

Socket

With Installation Specification attached in ATC

13 pieces Delivery: 15 days
#27

Switch

With Installation Specification attached in ATC

62 pieces Delivery: 15 days
#28

Switch

With Installation Specification attached in ATC

13 pieces Delivery: 15 days
#29

MCB

With Installation Specification attached in ATC

4 pieces Delivery: 15 days
#30

Conduit pipe

With Installation Specification attached in ATC

4 bundle Delivery: 15 days
#31

Flexible pipe

With Installation Specification attached in ATC

10 mtr Delivery: 15 days
#32

Button

With Installation Specification attached in ATC

10 pieces Delivery: 15 days
#33

Button Holder

With Installation Specification attached in ATC

3 pkt Delivery: 15 days
#34

Backlight Sheet

With Installation Specification attached in ATC

7 pieces Delivery: 15 days
#35

Backlight Sheet

With Installation Specification attached in ATC

5 pieces Delivery: 15 days
#36

Backlight Sheet

With Installation Specification attached in ATC

4 pieces Delivery: 15 days
#37

Cable Nail Clip Clamp

With Installation Specification attached in ATC

2 pkt Delivery: 15 days
#38

Copper Wire

With Installation Specification attached in ATC

1 bundle Delivery: 15 days
#39

W PVC Wall Panel

With Installation Specification attached in ATC

75 pieces Delivery: 15 days
#40

Paint Black

With paiting Specification attached in ATC

4 litre Delivery: 15 days
#41

Paint Grey

With paiting Specification attached in ATC

4 litre Delivery: 15 days
#42

Paint Offwhite

With paiting Specification attached in ATC

20 litre Delivery: 15 days
#43

Tarpeen Oil

Specification attached in ATC

10 litre Delivery: 15 days
#44

Apron

Specification attached in ATC

5 pieces Delivery: 15 days
#45

POP

With Working Specification attached in ATC

10 bag Delivery: 15 days
#46

White Cement

With Working Specification attached in ATC

25 bag Delivery: 15 days
#47

Interior Paint White

With paiting Specification attached in ATC

240 litre Delivery: 15 days
#48

Primer Paint

With paiting Specification attached in ATC

100 litre Delivery: 15 days
#49

Violet

With paiting Specification attached in ATC

400 grms Delivery: 15 days
#50

Yellow

With paiting Specification attached in ATC

600 grms Delivery: 15 days

Categories 30

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

Additional Doc 1 (Requested in ATC)

3

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement