TenderDekho Logo
GEM

Bids are Invited For Basic electrical lab including pelton wheel turbine in UDHAM SINGH NAGAR, UTTARAKHAND

Bid Publish Date

17-Jul-2025, 3:38 pm

Bid End Date

07-Aug-2025, 4:00 pm

Progress

Issue17-Jul-2025, 3:38 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 5

A tender has been published for Development Commissioner (micro Small & Medium Enterprises) Basic electrical lab including pelton wheel turbine in UDHAM SINGH NAGAR, UTTARAKHAND. Quantity: 1 by. Submission Deadline: 07-08-2025 16: 00: 00. Check eligibility and apply.

Documents 3

GeM-Bidding-8102311.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Experiment for Basic Electrical Engineering Laboratory

National Institute Of Technology (nit)

CACHAR, ASSAM

Posted: 4 November 2024
Closed: 25 November 2024
GEM

TURBINE DISCHARGE MEASURING SYSTEM,INSTALLATION, COMMISSIONING, TRAINING & DEMONSTRATION OF TURBINE

Bharat Heavy Electricals Limited (bhel)

BHOPAL, MADHYA PRADESH

Posted: 9 July 2025
Closed: 30 July 2025
GEM

SUPPLY, ASSEMBLY, WELDING, TESTING, INSTALLATION AND COMMISSIONING OF TURBINE CONNECTORS

Directorate Of Purchase And Stores

Posted: 10 November 2025
Closed: 26 November 2025
GEM

Basic Electric Vehicle Lab Setup

National Institute Of Technology (nit)

Posted: 27 November 2024
Closed: 18 December 2024
GEM

Cut-section of Differential assembly,Ackerman steering gear mechanism,Davison steering gear mechani

N/a

KAPURTHALA, PUNJAB

Posted: 5 August 2025
Closed: 27 August 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer