TenderDekho Logo
GEM

Invitation to Bid - 10mm Armd 4 core cable,4mm copper wire,2.5mm 3 core copper wire,1.5mm copper wire,6way box,16amp ss in SHIMOGA, KARNATAKA

Bid Publish Date

18-Dec-2024, 10:22 am

Bid End Date

08-Jan-2025, 11:00 am

EMD

₹5,500

Progress

Issue18-Dec-2024, 10:22 am
Technical01-Aug-2025, 10:50 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2360

Categories 13

Central Reserve Police Force (crpf) has released a public tender for 10mm Armd 4 core cable, 4mm copper wire, 2. 5mm 3 core copper wire, 1. 5mm copper wire, 6way box, 16amp ss combined box, 64amp mcb with box, casing pipe, 5map switch, 5amp socket, hanging tac, DP switch in SHIMOGA, KARNATAKA. Quantity: 2360. Submission Deadline: 08-01-2025 11: 00: 00. Download documents and apply online.

Documents 3

GeM-Bidding-7261770.pdf

Main Document

View File

Referenced Document

attached categories, trials are allowed as per approved procurement policy of the buyer nodal Ministries)

Referenced Document

Past Similar Tenders (Historical Results)

5 found

Single Core PVC wire copper 1 pont 5 sqmm,Single Core PVC wire copper 2 sqmm,Single Core PVC wire c

Indian Army

RAIPUR, CHHATTISGARH

Posted: 14 July 2025
Closed: 24 July 2025
GEM

6mm 2 core AluminiumWire,2.5 sqmm Copper Wire,1.5 sqmm Copper Wire,1 sqmm Copper Wire,0.5 sqmm Copp

Border Security Force (bsf)

DINAJPUR DAKSHIN, WEST BENGAL

Posted: 2 June 2025
Closed: 23 June 2025
GEM

Power Cable 4 Core 2.5mm copper,1 Inch Casing Capping,1.5 Inch Casing Capping,0.5 Inch Casing Cappi

Indian Army

LEH, JAMMU & KASHMIR

Posted: 11 December 2025
Closed: 1 January 2026
GEM

Wire 2.5 MM Single Core Copper,Wire 1.5 MM Single Core,Wire 1.0 MM Single Core Copper,Wire 0.75 MM

Indian Army

ALWAR, RAJASTHAN

Posted: 1 March 2025
Closed: 22 March 2025
GEM

4.0 sqmm copper wire,2.5 Sqmm copper wire,3 core 16 sqmm cable,3 modular PVC Box,6 modular PVC Box,

Indian Institute Of Technology (iit)

Posted: 27 February 2025
Closed: 20 March 2025
GEM

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC)

8

Additional Doc 3 (Requested in ATC)

9

Additional Doc 4 (Requested in ATC)

10

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

11

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1CERVO ELECTRICALS & LIGHTINGS   Under PMA-08-01-2025 10:50:38Disqualified
2PARAMOUNT INDUSTRIES   Under PMA-01-01-2025 12:36:47Qualified
3S L R INDUSTRIES   Under PMA-23-12-2024 21:07:15Disqualified
4SREE SUPRIYA ENTERPRISES   Under PMA-19-12-2024 14:25:18Disqualified
5tamilnadu distributors   Under PMA-31-12-2024 13:54:59Qualified

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1tamilnadu distributors   Under PMA Winner ₹3,49,666Item Categories : 10mm Armd 4 core cable,4mm copper wire,2.5mm 3 core copper wire,1.5mm copper wire,6way box,16amp ss
L2PARAMOUNT INDUSTRIES   Under PMA₹3,52,942Item Categories : 10mm Armd 4 core cable,4mm copper wire,2.5mm 3 core copper wire,1.5mm copper wire,6way box,16amp ss

🎉 L1 Winner

tamilnadu distributors   Under PMA

Final Price: ₹3,49,666

Frequently Asked Questions

Key insights about KARNATAKA tender market

FAQs

Details are provided in the tender document.

What are the eligibility criteria for bidding in this tender?

A1: To be eligible to bid, suppliers must have a minimum average annual turnover of INR 1 Lakh over the last three financial years and 3 years of past experience in supplying similar items. MSEs and Startups cannot qualify for exemptions related to turnover or experience.

What documents are required for submission?

A2: Bidders must submit experience criteria documentation, OEM Authorization Certificate, compliance documents for the BoQ, certified balance sheets, or a certificate from a Chartered Accountant. All documents should be uploaded during the submission phase.

What is the EMD amount for this tender?

A3: The Earnest Money Deposit (EMD) required for this tender is Rs. 5,500.

How will bids be evaluated?

A4: Bids will undergo a total value-wise evaluation. A reverse auction may be conducted among the lowest priced technically qualified bidders.

Can MSEs benefit from this tender?

A5: Yes, the procurement is reserved for MSEs with valid Udyam registration, and they must provide proof of their capability to participate in this bidding process.

Is there a technical specification document available?

A6: Yes, detailed technical specifications and the Bill of Quantities (BoQ) documents are provided in the links attached to the tender.

What is the deadline for bid submission?

A7: Bids must be submitted by 8th January 2025, 11:00 AM.

What happens if a bidder needs to seek exemption from experience/turnover criteria?

A8: Bidders seeking exemption must upload relevant supporting documents proving their eligibility for this exemption with their bid.

Where is the delivery location for the supplies?

A9: The delivery location is at 577301, Commandant 97 BN RAF, Hobli, Kasaba-II, Vill Bullapura, Karnataka-577301.

What is the active period for bid offers?

A10: Bid offers are valid for a period of 60 days from the closing date of the tender.

Are there any provisions related to local sourcing?

A11: Yes, procurement under this tender is reserved for Class 1 local suppliers as per the 'Make in India' policy, which requires a minimum of 50% local content for qualification.

Who is the contact person for clarifications?

A12: For any clarifications, bidders should contact Kamlesh Kumar in the Central Reserve Police Force (CRPF).

What is the consequence of non-compliance with submission requirements?

A13: Non-compliance with submission requirements may result in disqualification from the bidding process.

How are payments processed in this tender?

A14: Payment terms are outlined in the bidding documents; suppliers should ensure to review the payment processes before submitting bids.

What are the consequences of not adhering to the local content requirements?

A15: Bids that do not comply with the local content requirements are at risk of rejection during the evaluation process.