Item no 1,Item no 2,Item no 3,Item no 4,Item no 5
Society For Applied Microwave Electronic Engineering And Research (sameer)
Progress
Quantity
16
Category
ANTI VIBRATION PAD
Bid Type
Two Packet Bid
The procuring organization is Hmt Machine Tools Limited in Ajmer, Rajasthan seeking the anti vibration pads to be supplied as per HMT drawings. The bid scope covers the supply of goods (no installation) for a probable bulk requirement, with a noted option to increase up to 25% of quantity during contract and extended delivery periods. Payment terms include 60 days credit after material acceptance. A Data Sheet verification requirement ties bid eligibility to precise product parameter matching. A 1-year warranty from acceptance or after commissioning is specified, with OEM warranty certificates due at delivery. This tender emphasizes delivery timelines and post-sales support for a Indian service network. The procurement is defined by the clause to align with HMT drawings and to ensure compliance with the buyer’s data sheet during bid evaluation.
Product/Category: anti vibration pads
Reference: HMT drawings
Delivery: as per option clause with minimum 30 days additional time
Warranty: 1 year from acceptance or post-installation testing
Data Sheet: mandatory; must match product parameters
Service network: established centers in India; installation/training may be included by bidder
60 days credit payment after material acceptance
Quantity may be increased up to 25% during contract
Data Sheet verification is mandatory for bid acceptance
1-year warranty with OEM certificates required at delivery
Supply only; no installation unless specified by bidder
As per HMT drawings, goods must comply exactly
60 days credit after acceptance of material per ATC; ensure alignment with delivery schedule
Option-based quantity extension up to 25%; extended delivery period calculated; minimum 30 days required for added time
Not explicitly stated; implied adherence to delivery and warranty conditions; evaluate in final contract
Experience in supplying anti vibration pads or closely related vibration isolation components
Demonstrated capability to meet HMT drawing specifications
Financial stability demonstrated by recent financial statements
Society For Applied Microwave Electronic Engineering And Research (sameer)
Office Of Dg (mss)
HYDERABAD, TELANGANA
Indian Army
ALWAR, RAJASTHAN
Indian Army
ALWAR, RAJASTHAN
Indian Army
ALWAR, RAJASTHAN
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | ANTI VIBRATION PAD | J44201005001 | 12 | nos | ajbuycon | 60 |
| 2 | NO ITEM A | NIL | 1 | nos | ajbuycon | 60 |
| 3 | NO ITEM B | NIL | 1 | nos | ajbuycon | 60 |
| 4 | NO ITEM C | NIL | 1 | nos | ajbuycon | 60 |
| 5 | NO ITEM D | NIL | 1 | nos | ajbuycon | 60 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates demonstrating prior supply of similar anti vibration pads
Financial statements for last 2-3 years
EMD document (as applicable by tender norms)
Technical bid documents and Data Sheet uploaded
OEM authorization / manufacturer evidence
Proof of service center presence near consignee locations
Key insights about RAJASTHAN tender market
Bidders must upload Data Sheet aligned with HMT drawings, provide OEM authorization, and submit GST, PAN, and financial statements. The tender requires 60 days credit after material acceptance and a 1-year warranty. Ensure the bid includes all costs and a verified service network in India.
Required documents include GST certificate, PAN card, 2–3 years of experience certificates, financial statements, OEM authorizations, Data Sheet, and proof of service centers. Upload Data Sheet with the bid to allow parameter verification against HMT drawings.
Specific technical parameters follow HMT drawings; data sheet must match product parameters; scope is supply only, with option to extend quantity up to 25% and extended delivery timelines with minimum 30 days extra time.
Payment terms specify 60 days credit after material acceptance. Ensure delivery aligns with acceptance and any extended delivery periods outlined by the option clause are satisfied without penalties.
Delivery begins from the last date of the original delivery order; extended time is calculated as (increased quantity / original quantity) × original delivery period, with a minimum of 30 days.
A 1-year warranty from acceptance or after final commissioning is required, with OEM warranty certificates submitted at delivery; after-sales service centers must be demonstrated in India.
Yes, quantity may be increased up to 25% of bid quantity at contract placement and again during the currency of the contract at contracted rates; delivery timing adapts via the option clause.
Bid must comply with HMT drawings; Data Sheet verification is mandatory to prevent rejection due to technical parameter mismatch.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS