TenderDekho Logo
Closed GEM

Indian Army Department Of Military Affairs Procurement Wind Shield Glass Laminated and Related Components Tender 2026

Bid Publish Date

19-Sep-2026, 11:25 am

Bid End Date

29-Sep-2026, 12:00 pm

Value

₹26,700

Location

Progress

Issue19-Sep-2026, 11:25 am
Technical29-09-2026 01:35:58
Financial
AwardCompleted

Tender Overview

The Indian Army, Department Of Military Affairs, is inviting bids for a portfolio of components including wind shield glass laminated, rubber mould, drive assembly, wheel nut M14, accelerator cable, hand control valve, oil seal FRT wheel, hose assembly, fly wheel ring, PTO switch, regulator SR-40, water temp gauge and field coil. Estimated contract value is ₹26,700.00, with 13 total items listed in the BOQ. The tender emphasizes flexibility with an option to increase or decrease ordered quantities up to 25%, and the delivery period adjustments are calculated via a formula that ensures a minimum of 30 days augmented by the proportion of added quantity. Bidders should anticipate a technically diverse procurement aligned to military vehicle components, potentially requiring rapid service support during warranty.

Technical Specifications & Requirements

  • Notable terms: option clause allows +/- 25% quantity adjustment at contract placement and during currency at contracted rates.
  • Delivery timing: original delivery period; extended period scales with (additional quantity/original quantity) × original days, minimum 30 days.
  • Documentation for vendor setup includes: PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank.
  • Warranty expectations: dedicated technical service personnel for timely servicing and defect rectification during the warranty period per SLA.
  • Financial health: turnover evidence required for last three years (Audited statements or CA certificate), with special consideration if the bidder is <3 years old.
  • Compliance: bidders must avoid liquidation or bankruptcy declarations and must upload necessary certificates as per bid documents.

Terms & Eligibility

  • EMD details are not disclosed; bidders must ensure financial and documentary readiness.
  • The contract prohibits assignment and sub-contracting without prior written consent from the buyer.
  • The bidder must demonstrate capability via service personnel deployment for warranty support and timely service.
  • Turnover criteria require submission of certified financial statements or CA certificate indicating three-year average turnover.
  • Documents for bid submission include PAN, GSTIN, cancelled cheque, EFT mandate, and other certificates specified in the bid.
  • The seller must comply with all terms in the bid document and any ATC/Corrigendum.

Key Specifications

  • Wind shield glass laminated

  • Rubber mould components

  • Drive assembly

  • Wheel nut M14

  • Accelerator cable

  • Hand control valve

  • Oil seal FRT wheel

  • Hose assembly

  • Fly wheel ring

  • PTO switch

  • Regulator SR-40

  • Water temp gauge

  • Field coil

Terms & Conditions

  • Option clause allows ±25% quantity variation at contract and during currency with proportional delivery time extension.

  • Delivery period extends based on (additional quantity ÷ original quantity) × original delivery period, minimum 30 days.

  • Bid submission requires PAN, GSTIN, cancelled cheque, EFT mandate and other standard documents; turnover proof for last three years.

Important Clauses

Payment Terms

No explicit EMD amount disclosed; ensure readiness to provide relevant security and payment terms as per bid document and ATC.

Delivery Schedule

Delivery period to commence from last date of original delivery order; extended periods calculated with minimum 30 days and proportional time for added quantity.

Penalties/Liquidated Damages

Not specified in provided terms; suppliers should expect SLA-driven service commitments and potential penalties per bid document.

Bidder Eligibility

  • Not under liquidation or bankruptcy; non-encumbrance status

  • Three-year turnover evidence (Audited or CA certificate) indicating required financial capacity

  • Compliance with warranty SLA and deployment of dedicated service personnel

  • Submission of PAN, GSTIN, cancelled cheque, EFT mandate and all certificates per ATC/Corrigendum

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
RAJDHANI TRADERS   Under PMA
-29-09-2026 01:35:58
2
RISHAB AUTOMOBILES   Under PMA
-29-09-2026 11:15:33
3
ROYAL ENTERPRISES   Under PMA
-29-09-2026 11:42:26

Financial Results

Rank Seller Price Item
L1
RAJDHANI TRADERS(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Wind Shield Glass laminated,Rubber Mould,Drive Assy,Wheel Nut M14,Accelerator Cable,Hand Control Va
L2
RISHAB AUTOMOBILES (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Wind Shield Glass laminated,Rubber Mould,Drive Assy,Wheel Nut M14,Accelerator Cable,Hand Control Va
L3
ROYAL ENTERPRISES (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Wind Shield Glass laminated,Rubber Mould,Drive Assy,Wheel Nut M14,Accelerator Cable,Hand Control Va

Tender Data

Bid Details

Quantity

36

Category

Wind Shield Glass laminated

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Wind Shield Glass laminated , Rubber Mould , Drive Assy , Wheel Nut M14 , Accelerator Cable , Hand Control Valve , Oil Seal FRT Wheel , Hose Assy , Fly Wheel Ring , PTO Switch , Regulator SR-40 , Water Temp Guage , Field Coil

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Nagaon

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-NagaonNagaon--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9914940.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 13 Items Sign in for GEM prices

#1

Wind Shield Glass laminated

MT SPARES

1 nos Delivery: 10 days
#2

Rubber Mould

MT SPARES

1 nos Delivery: 10 days
#3

Drive Assy

MT SPARES

1 nos Delivery: 10 days
#4

Wheel Nut M14

MT SPARES

20 nos Delivery: 10 days
#5

Accelerator Cable

MT SPARES

1 nos Delivery: 10 days
#6

Hand Control Valve

MT SPARES

1 nos Delivery: 10 days
#7

Oil Seal FRT Wheel

MT SPARES

4 nos Delivery: 10 days
#8

Hose Assy

MT SPARES

1 nos Delivery: 10 days
#9

Fly Wheel Ring

MT SPARES

1 nos Delivery: 10 days
#10

PTO Switch

MT SPARES

1 nos Delivery: 10 days
#11

Regulator SR-40

MT SPARES

2 nos Delivery: 10 days
#12

Water Temp Guage

MT SPARES

1 nos Delivery: 10 days
#13

Field Coil

MT SPARES

1 nos Delivery: 10 days

Categories 21

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT mandate certified by bank

5

Audited Balance Sheets for last three financial years or CA/Cost Accountant certificate indicating turnover

6

Certificates and documents as per Bid Document, ATC and Corrigendum

7

Evidence of non-liquidation or non-bankruptcy status

8

Warranty and SLA documents, service deployment plan

Frequently Asked Questions

Key insights about ASSAM tender market

What documents are required for this Indian Army wind shield glass tender in 2026?

Bidders must submit PAN Card, GSTIN, cancelled cheque, EFT mandate, and turnover proof for the last three years via audited statements or CA certificate. Also include certificates listed in the ATC/Corrigendum and service SLA documentation proving warranty support capabilities.

How is the 25% quantity option applied in this Army procurement?

The purchaser may modify quantity by up to 25% at contract placement and during the currency at contracted rates. Delivery time adjusts with the formula (additional quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.

What are the key warranty and service requirements for this bid?

Winners must deploy dedicated technical personnel to attend service requests promptly and comply with the warranty SLA outlined in the bid. Service timeliness and defect rectification are critical performance metrics for the contract.

What is the estimated contract value and item scope for this tender in 2026?

Estimated value is ₹26,700.00 with a BOQ listing 13 items, including wind shield glass laminated and related automotive components like rubber moulds, drive assemblies, and regulator SR-40.

What turnover evidence is acceptable for eligibility in this procurement?

Submit audited balance sheets for the last three years or a Chartered Accountant/Cost Accountant certificate with turnover figures. If the bidder is under 3 years old, use completed years post-incorporation for average turnover calculation.

What are the submission submission requirements beyond financials and identity proofs?

Include all certificates requested in the Bid Document, ATC, and Corrigendum, plus evidence of non-liquidation, a detailed service deployment plan, and any OEM authorizations if applicable to the wind shield glass and related components.

How does the delivery timeline adjust when quantities increase under option clause?

Increased quantities extend the delivery period proportionally by (additional quantity ÷ original quantity) × original days, with a hard minimum of 30 days; if the original period is shorter, that shorter period is used.

What is the eligibility to participate in this Indian Army procurement for vehicle components?

Eligibility requires non-liquidity, GST/PAN compliance, EFT setup, turnover sufficiency, and adherence to warranty SLA. Bidders must upload all required documentation and certificates per ATC, Corrigendum, and Bid Document.

Advertisement