Bid Publish Date
06-Oct-2026, 12:58 pm
Bid End Date
26-Oct-2026, 1:00 pm
Progress
Indian Army has released a public tender for Solar Road Studs, Supply and fixing cat eye reflective type of metal body alloy of size 100mm x 100mm x 20mm, Supply and fixing for road speed bumps manufactured by HDPE/PE materail, Road Delineator (V2). Quantity: 530. Submission Deadline: 26-10-2026 13: 00: 00. Download documents and apply online.
Quantity
530
Category
Road Delineator (V2)
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
40 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Solar Road Studs , Supply and fixing cat eye reflective type of metal body alloy of size 100mm x 100mm x 20mm , Supply and fixing for road speed bumps manufactured by HDPE/PE materail , Road Delineator (V2)
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
6
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
PASCHIM MEDINIPUR
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | PASCHIM MEDINIPUR | PASCHIM MEDINIPUR | - | - | 50 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer