TenderDekho Logo
GEM

Invitation to Bid - Supply of one no 6 passenger Lift,ITC of one no 6 passenger Lift,Comprehensive maintenance During f in LUCKNOW, UTTAR PRADESH

Bid Publish Date

09-Oct-2025, 3:15 pm

Bid End Date

30-Oct-2025, 1:00 pm

EMD

₹31,309

Value

₹15,65,473

Progress

Issue09-Oct-2025, 3:15 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

38

Category

Supply of one no 6 passenger Lift

Bid Type

Two Packet Bid

Categories 31

Bharat Sanchar Nigam Limited Portal(bsnl) has released a public tender for Supply of one no 6 passenger Lift, ITC of one no 6 passenger Lift, Comprehensive maintenance During first year, Comprehensive maintenance During 2nd year, Comprehensive maintenance During 3rd year in LUCKNOW, UTTAR PRADESH. Quantity: 38. Submission Deadline: 30-10-2025 13: 00: 00. Download documents and apply online.

Documents 6

GeM-Bidding-8451086.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Custom Bid for Services - Supply And Installation of lift,Custom Bid for Services - AMC Service of

Hindustan Petroleum Corporation Ltd

JAIPUR, RAJASTHAN

Posted: 25 July 2025
Closed: 6 August 2025
GEM

Operation And Maintenance Of Lifts (Elevators) - Comprehensive maintenance servicing contract for K

Indian Space Research Organization

AHMEDABAD, GUJARAT

Posted: 20 June 2025
Closed: 29 August 2025
GEM

Operation And Maintenance Of Lifts (Elevators) - 3 Years Comprehensive AMC for lift at Shipyard Sad

Goa Shipyard Limited

SOUTH GOA, GOA

Posted: 25 June 2025
Closed: 5 August 2025
GEM

Comp maint of passenger lifts,Technical specifications of passanger lift 1,Technical specifications

Indian Army

KOTA, RAJASTHAN

Posted: 11 January 2025
Closed: 1 February 2025
GEM

Comp maint of passenger lifts,Technical specifications of passanger lift 1,Technical specifications

Indian Army

Posted: 25 November 2024
Closed: 16 December 2024
GEM

Bill of Quantities (BOQ) 5 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Supply of one no 6 passenger Lift SH I Supply and ITC of 1x6 Passenger Lift, Supply of one No. 6 passenger Gearless, machineroom less electric traction lift in the existing lift well at site conforming to the latest lift act and latest IS code and lift practices serving 4 stops 4 landings G+3 of capacity not less than 408 Kg, having speed 1.0 meters per second suitable for operation on 3 phase, 415/440. V, 50Hz. A.C supply, automatic push button control with latest version control panel, simplex full collective system with or without attendant and all other equipment like, car, car doors, landing doors, indicators, panel, flooring, guide rails, automatic rescue device, safety devices, regenerative drive etc. as per specifications attached including miscellaneous items like supports for guide rails, scaffolding, minor building works like making holes, sockets and making good the same etc. complete as required. 1 nos consignee_sdeejhansi 90
2 ITC of one no 6 passenger Lift Installation, testing and commissioning of one No. 6 passenger Gearless, machineroom less electric traction lift in the existing lift well at site conforming to the latest lift act and latest IS code and lift practices serving 4 stops 4 landings G+3 of capacity not less than 408 Kg, having speed 1.0 meters per second suitable for operation on 3 phase, 415/440. V, 50Hz. A.C supply, automatic push button control with latest version control panel, simplex full collective system with or without attendant and all other equipment like, car, car doors, landing doors, indicators, panel, flooring, guide rails, automatic rescue device, safety devices, regenerative drive etc. as per specifications attached including miscellaneous items like supports for guide rails, scaffolding works, minor civil works including modification of landing openings, if required and making holes, sockets etc. and making good the same complete as required. 1 job consignee_sdeejhansi 90
3 Comprehensive maintenance During first year Sub Head II Comprehensive Maintenance, Comprehensive maintenance of 1 x 6 passenger Lifts i/c checking and performing routine servicing/cleaning as recommended by the manufacturer and specification of contract etc as reqd. a. During first year of operation after warranty period. 12 month consignee_sdeejhansi 365
4 Comprehensive maintenance During 2nd year Sub Head II Comprehensive Maintenance, Comprehensive maintenance of 1 x 6 passenger Lifts i/c checking and performing routine servicing/cleaning as recommended by the manufacturer and specification of contract etc as reqd. b. During 2nd year of operation after warranty period. 12 month consignee_sdeejhansi 365
5 Comprehensive maintenance During 3rd year Sub Head II Comprehensive Maintenance, Comprehensive maintenance of 1 x 6 passenger Lifts i/c checking and performing routine servicing/cleaning as recommended by the manufacturer and specification of contract etc as reqd. c. During 3rd year of operation after warranty period. 12 month consignee_sdeejhansi 365

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC)

8

Additional Doc 3 (Requested in ATC)

9

Additional Doc 4 (Requested in ATC)

10

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

11

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer