Workstation for Recorder system
Hindustan Aeronautics Limited (hal)
📍 SULTANPUR, UTTAR PRADESH
Bid Publish Date
18-Jul-2026, 9:29 am
Bid End Date
08-Aug-2026, 2:00 pm
Location
Progress
Quantity
1
Bid Type
Single Packet Bid
Hindustan Aeronautics Limited (Department of Defence Production) seeks procurement of a Data Recorder Work Station under a defence production framework. The scope covers Supply, Installation, Testing and Commissioning of the goods. The contract includes a 25% quantity option for both increase during bidding and within the currency of the contract, at contracted rates. Detailed delivery timing is triggered from the last date of the original delivery order. Required bidder documents include PAN Card, GSTIN, Cancelled Cheque, and an EFT Mandate certified by the bank. Location details are not specified. No BOQ items are listed, indicating a likely standalone equipment package. AAT terms specify compliance with buy-sell adjustments and SITC scope, with emphasis on end-to-end deployment.
Scope: Supply Installation Testing and Commissioning of Data Recorder Work Station
Quantity option: up to 25% increase during contract at same rates
Delivery timing formula: ((Additional quantity ÷ Original quantity) × Original delivery period) with minimum 30 days
No explicit technical specifications in provided data; verify via ATC
Documents: PAN, GSTIN, Cancelled Cheque, EFT Mandate
Option Clause permits 25% quantity variation at contracted rates
Delivery schedule anchored to last date of original order and extended periods if applicable
SITC delivery with installation and commissioning requirements
Not specified in provided data; verify in ATC
Delivery begins from the last date of original delivery order; extended duration follows option formula
Not specified in provided data; verify in ATC
Submit PAN and GST registration
Provide EFT Mandate and bank certification
Comply with 25% quantity variation clause and SITC scope
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Data Recorder Work Station
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
SULTANPUR
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | SULTANPUR | SULTANPUR | - | - | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
BIDDER SUBMISSION documents from Terms and Conditions: PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate copy certified by Bank
Any OEM authorization if required by ATC
Technical bid documentation as per ATC
Key insights about UTTAR PRADESH tender market
Bidders must submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate. Ensure compliance with the 25% quantity option and SITC scope. Review the ATC for site-specific terms and attach OEM authorizations if required. Prepare equipment specification alignment and installation plan for HAL deployment.
Required documents include PAN Card copy, GSTIN copy, Cancelled Cheque, EFT Mandate certified by bank, and any OEM authorizations. Ensure vendor code creation is completed prior to bid submission and attach a technical bid per ATC guidelines.
The scope is Supply, Installation, Testing and Commissioning of a Data Recorder Work Station. Bidders must include all costs in the bid and ensure installation/commissioning readiness, with adherence to ATC terms for defence production deployment.
The Purchaser may increase or decrease the quantity up to 25% of bid/contract quantity. This applies during placement and within the currency of the contract at the contracted rates, with delivery timing adjusted per the specified formula.
Delivery will commence from the last date of the original delivery order. If extended under the option clause, the additional time is calculated by the specified formula, with a minimum of 30 days.
No detailed technical specifications are provided in the data. Bidders should consult the Buyer Uploaded ATC document for any mandatory standards, fittings, or integration requirements for the Data Recorder Work Station.
Hindustan Aeronautics Limited (hal)
📍 SULTANPUR, UTTAR PRADESH
National Institute Of Technology (nit)
📍 ALLAHABAD, UTTAR PRADESH
Sanjay Gandhi Post Graduate Institute Of Medical Sciences Lucknow
📍 LUCKNOW, UTTAR PRADESH
Indian Council Of Medical Research (icmr)
📍 AHMEDABAD, GUJARAT
Office Of Dg (aero)
📍 BANGALORE, KARNATAKA
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS