Bus Stop Shelter
Urban Development And Housing Department
GAYA, BIHAR
Progress
Quantity
10
Bid Type
Two Packet Bid
The Urban Development And Housing Department Bihar seeks a vendor for Bus Stop Shelter construction under a single procurement, including Supply, Installation, Testing and Commissioning. The project carries an EMD of ₹100000 and an estimated turnover condition linked to the bid. Location specifics are implied to be within Bihar, focusing on public street furniture with covered shelter, lighting and seating. The scope emphasizes delivery against option to modify quantity by up to 25%, and execution within contracted rates. Unique aspects include the requirement to meet standard governance and warranty criteria while ensuring accessibility and durable construction.
EMD of ₹100000 required with bid submission
Quantity may be increased/decreased up to 25% at contract and during currency
Bidder and OEM must meet 3-year turnover criteria with supporting documents
Imported products require an in-India after-sales office for service
Supply, Installation, Testing and Commissioning scope included
Not specified in this extract; bid requires EMD and full cost inclusion for supply, installation, testing and commissioning with delivery as per option clause
Delivery period adjustable based on option clause; minimum 30 days equivalent in extended delivery, linked to original delivery period
Not explicitly stated; penalties typically apply for delays per contract terms; ensure alignment with option clause timings
3-year average annual turnover eligible bidder and OEM
Audited or CA-certified turnover proofs
OEM authorization for the offered product (if applicable)
Presence of Indian after-sales support for imported products
Urban Development And Housing Department
GAYA, BIHAR
Urban Development And Housing Department
EAST CHAMPARAN, BIHAR
Urban Development And Housing Department
SAHARSA, BIHAR
Urban Development And Housing Department
SARAN, BIHAR
Urban Development And Housing Department
SUPAUL, BIHAR
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Construction | Primary Structure Material | Stainless Steel 304 |
| Construction | Roof Cladding Material | Polycarbonate Sheet (UV Protected) |
| Construction | Side Walls Material | N.A. |
| Construction | Shelter Length | 2 - 6 Meters |
| Construction | Shelter Width | 1.5 - 4 Meters |
| Construction | Shelter Height (Roof Peak Height from the surface of Ground) | 3 - 6 Meters |
| Construction | Lighting | LED Lights |
| Seating | Seating Capacity | 10 |
| Seating | Seat Material | Stainless Steel 304 |
| Seating | Seat with Backrest | No |
| Seating | Wheelchair Accessibility | No |
| Certification, Testing and Warranty | Warranty | 2, 3, 4, 5 Or higher |
| Certification, Testing and Warranty | All specifications and requirements mentioned in the bid have been seen and understood | Yes |
Discover companies most likely to bid on this tender
GST registration
Permanent Account Number (PAN) card
Audited financial statements or CA certificate for turnover (last 3 financial years)
Experience certificates for similar bus shelter or public works
EMD payment proof (₹100000)
Technical bid documents
OEM authorization or authorized dealership certificate (if applicable)
Proof of registered office for OEM (if imported product)
Extended Deadline
16-Jan-2026, 6:00 pm
Opening Date
16-Jan-2026, 6:30 pm
Extended Deadline
13-Jan-2026, 6:00 pm
Opening Date
13-Jan-2026, 6:30 pm
Key insights about BIHAR tender market
Bidders must submit GST, PAN, turnover proof, experience certificates, EMD ₹100000, and OEM authorizations. The scope includes Supply, Installation, Testing and Commissioning, with up to 25% quantity variation. Ensure compliance with warranty and accessibility requirements; upload technical bid and financials per terms.
Required documents include GST registration, PAN, last 3-year turnover audited statements, experience certificates for similar projects, EMD proof of ₹100000, technical bid, OEM authorization if applicable, and Indian after-sales office proof for imported goods.
Key specs cover primary structure material, roof cladding, side walls, shelter length/width/height, lighting, seating with backrest, seating capacity, and wheelchair accessibility, plus a warranty. Ensure all components align with bid requirements and delivery scope.
EMD is ₹100000 and demonstrates bidder seriousness. It is submitted with the bid and may be adjusted or forfeited if the bidder fails to meet contract terms or withdraws after submission, in line with standard procurement norms.
The buyer can vary quantity up to 25% at contract, with delivery period adjustments. Additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days; original delivery constraints apply and may extend to contracted time frames.
Imported products must have an in-India registered OEM or authorized seller with a dedicated Indian after-sales service office; provide certification confirming presence and service capabilities in the bid.
Bid scope includes the complete cycle: Supply, Installation, Testing and Commissioning of bus stop shelter, along with associated works; the bidder must furnish all components, integrate lighting and seating, and ensure compliance with warranty terms.
Bidder and OEM must meet the minimum average annual turnover for the last three years ending 31st March; provide audited balance sheets or CA certificates indicating turnover; if company is younger than 3 years, use completed years’ turnover post-incorporation.
Sign up now to access all documents
Main Document
CATALOG Specification
ATC