TenderDekho Logo
GEM

Indian Army Tender Srinagar Electricals and Misc Equipment procurement 2026 ISO/MII compliance

Bid Publish Date

01-Mar-2026, 3:20 pm

Bid End Date

11-Mar-2026, 4:00 pm

Progress

Issue01-Mar-2026, 3:20 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

529

Category

ISO Profile Liquid

Bid Type

Single Packet Bid

Key Highlights

  • OEM declarations required with Make in India content disclosure
  • Local content / MSME certification as eligibility gate
  • Mandatory GST clearance up to March 2026 (GSTR 3B)
  • Demonstration of vehicle and machine capability in front of authorities
  • State government installation experience in last 2 years required
  • Delivery/extension implications under option clause (up to 25% quantity change)
  • Local state seller priority for service and support
  • Non-submission of any required document leads to disqualification

Categories 16

Tender Overview

Organization: Indian Army (Department of Military Affairs) in Srinagar, Jammu & Kashmir. Procures a broad list of items across electronics, mechanic, cabling, and fitness components (e.g., D Link Cat 6 24 Port, Exide Battery 200 watt, Mirror 32 Inchs, AC Router 1900, various Fan Belts, Fuel Pump Accessories, and multiple other ancillary items). Although the exact quantity and total estimated value are not disclosed, the scope covers 18 BoQ items with a substantial supply and installation component. A unique emphasis exists on local capability (Make in India) and prior state government installation experience. Key differentiators include mandatory OEM declarations, local content commitments, and post-delivery service expectations. This tender highlights vendor compliance, local supplier preference, and demonstrable capability for immediate deployment in a military environment.

Technical Specifications & Requirements

  • No technical specifications are published in the provided data; bidders should prepare to demonstrate equipment compatibility and installation readiness across a diverse catalog.
  • Critical compliance themes from terms and conditions include: Make in India local content declaration, OEM authorization, MSME status submission, GST clearance up to March 2026, and proof of prior supply/installations to state governments within the last two years.
  • Additional emphasis on vehicle/machine demonstrations in front of authorities, and a minimum three-year turnover or equivalent financial stability is implied by typical government procurement norms. Bidders must align with the option clause for quantity adjustments up to 25% and adhere to extended delivery calculations as specified.
  • Suppliers should be ready to furnish certificates and documents as required in the ATC, along with GST and local content disclosures to ensure eligibility.

Terms & Eligibility

  • EMD: Not disclosed in the data; bidders must verify bid document for exact amount and payment terms.
  • Make in India: Mandatory local content declaration; non-declaration may render bidder non-local and ineligible.
  • Documentation: Upload GST clearance, MSME certificate, OEM declarations, and commitment certificates; failure to provide documents may lead to disqualification.
  • Experience: Demonstrate prior supply/installations to state governments in the last two years; private orders are not accepted for this tender.
  • Payment: Payment upon successful delivery; terms beyond delivery are not specified in the provided data.
  • Additional terms: Vehicle and machine demonstrations required; bidder turnover and financial performance to meet unspecified minimum thresholds; ensures GST applicability and local support readiness.

Key Specifications

    • Product categories include: networking equipment (D Link Cat 6 24 Port), electrical components (Exide battery 200 watt), mechanical belts (Fan Belts for 5 KVA–20 KVA categories), mirrors, and miscellaneous accessories
    • Demonstrable prior installation with state government or equivalent public sector clients
    • GST compliance to March 2026 and Make in India / local content declarations
    • OEM authorization for products; local service capability

Terms & Conditions

  • Option clause allowing ±25% quantity adjustment at contract, with extended delivery time calculated per formula

  • GST clearance and Make in India/local content declarations mandatory for bid eligibility

  • Mandatory documentation including GST, MSME, OEM declarations; non-submission leads to disqualification

Important Clauses

Payment Terms

Payment will be made after successful delivery; exact milestones not specified in provided data.

Delivery Schedule

Delivery period adjustments allowed under option clause; extended delivery time follows calculated formula with minimum 30 days.

Penalties/Liquidated Damages

Not explicitly specified in data; standard government procurement penalties may apply for late delivery or non-compliance.

Bidder Eligibility

  • Must upload GST clearance up to March 2026 and MSME certificate if applicable

  • OEM declarations and local content percentage disclosure required

  • Demonstrate prior supply/installations to state governments in last 2 years

  • No disqualification in GEM portal incidents; eligible bidders must pass all terms

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

ISO Profile Liquid , Dis Water Heavy Duty , Collent Custrol , D Link Cat 6 24 Port , Jamper Wire , AC Router 1900 , Piston , Wire 90 mtr , Fan Belt 20 KVA 1564 NO , Fan Belt 15 KVA 1500 NO , Fan Belt 7.5 KVA AX56 NO , Fan Belt 7.5 KVA 1185 NO , Fan Belt 5 KVA AX54 No , Fan Belt 20 KVA 1262 NO , Exide Battery 200 watt , Fuel Pump Accessories 3.5 KVA , Mirror 32 Inchs , 1.5mm Wire Havellas

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9064461.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 18 Items Sign in for GEM prices

#1

ISO Profile Liquid

ISO Profile Liquid

5 ltr Delivery: 15 days
#2

Dis Water Heavy Duty

Dis Water Heavy Duty

50 ltr Delivery: 15 days
#3

Collent Custrol

Collent Custrol

27 ltr Delivery: 15 days
#4

D Link Cat 6 24 Port

D Link Cat 6 24 Port

2 nos Delivery: 15 days
#5

Jamper Wire

Jamper Wire

400 mtr Delivery: 15 days
#6

AC Router 1900

AC Router 1900

1 nos Delivery: 15 days
#7

Piston

Piston

6 nos Delivery: 15 days
#8

Wire 90 mtr

Wire 90 mtr

5 bundle Delivery: 15 days
#9

Fan Belt 20 KVA 1564 NO

Fan Belt 20 KVA 1564 NO

2 nos Delivery: 15 days
#10

Fan Belt 15 KVA 1500 NO

Fan Belt 15 KVA 1500 NO

4 nos Delivery: 15 days
#11

Fan Belt 7.5 KVA AX56 NO

Fan Belt 7.5 KVA AX56 NO

8 nos Delivery: 15 days
#12

Fan Belt 7.5 KVA 1185 NO

Fan Belt 7.5 KVA 1185 NO

2 nos Delivery: 15 days
#13

Fan Belt 5 KVA AX54 No

Fan Belt 5 KVA AX54 No

8 nos Delivery: 15 days
#14

Fan Belt 20 KVA 1262 NO

Fan Belt 20 KVA 1262 NO

2 nos Delivery: 15 days
#15

Exide Battery 200 watt

Exide Battery 200 watt

1 nos Delivery: 15 days
#16

Fuel Pump Accessories 3.5 KVA

Fuel Pump Accessories 3.5 KVA

1 nos Delivery: 15 days
#17

Mirror 32 Inchs

Mirror 32 Inchs

1 nos Delivery: 15 days
#18

1.5mm Wire Havellas

1.5mm Wire Havellas

4 nos Delivery: 15 days

Required Documents

1

GST Registration Certificate and GST Return (GSTR-3B) up to March 2026

2

MSME Certificate (if applicable)

3

OEM Authorization / Make in India declaration with local content percentage

4

Commitment Certificate

5

Experience certificates showing state government installations within last 2 years

6

Financial statements / turnover evidence

7

Proof of past successful delivery and installation

Financial Results

Rank Seller Price Item
L1
ALTAF ENTERPRISES   Under PMA
Item Categories : ISO Profile Liquid,Dis Water Heavy Duty,Collent Custrol,D Link Cat 6 24 Port,Jamper Wire,AC Router
L2
M/S J.A.TRADING COMPANY   Under PMA
Item Categories : ISO Profile Liquid,Dis Water Heavy Duty,Collent Custrol,D Link Cat 6 24 Port,Jamper Wire,AC Router
L3
ARKTIKWOLF SOLUTIONS PRIVATE LIMITED   Under PMA
Item Categories : ISO Profile Liquid,Dis Water Heavy Duty,Collent Custrol,D Link Cat 6 24 Port,Jamper Wire,AC Router

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for Indian Army Srinagar electricals tender 2026?

Bidders must prepare GST clearance up to March 2026, MSME certificate if applicable, OEM authorizations, and Make in India local content declarations. Ensure prior state government installation experience within two years and be ready for vehicle/machine demonstrations before authorities.

What documents are required for Army procurement in Srinagar JK?

Required documents include GST clearance (GSTR-3B), MSME certificate, OEM authorization, commitment certificate, local content declaration, and experience certificates showing state government installations in the last two years, along with turnover evidence.

What are the key eligibility criteria for local content in this Army tender?

Bidder must provide percentage of local content as per Make in India policy; failure to provide this percentage or declaration renders bidder non-local and possibly ineligible for the procurement.

What installation experience is required for this Army supply contract?

Bidders must demonstrate prior supply and installation of similar products to state governments in the last two years; private orders are not accepted as eligible proof of experience.

What are the payment terms for the Srinagar Army tender after delivery?

Payment is processed after successful delivery; the data does not specify milestones or advance payment terms, so bidders should anticipate payment upon acceptance and delivery completion.

Which standards or certifications are mandatory for this bid in JK?

Key commitments include OEM authorizations, Make in India declarations, and GST compliance; while explicit technical standards are not listed, adherence to local content and supplier verification is mandatory.

How to demonstrate compliance during the bid process for Army equipment?

Prepare for vehicle and machine demonstrations in front of authorities; ensure all required certificates (GST, MSME, OEM) are uploaded, and be ready to show prior government installation references.

What is the scope of quantity adjustments under the option clause?

The purchaser may increase/decrease quantity by up to 25% at contract placement and during the currency, with delivery time adjusted using a specific formula, ensuring minimum 30 days extra.