TenderDekho Logo
Closed GEM

Technical Education Department Uttar Pradesh Gorakhpur Stability of Flow Apparatus Tender 2026 ISI/ISO Standards 2026

Bid Publish Date

28-Mar-2026, 10:43 am

Bid End Date

13-Apr-2026, 5:00 pm

EMD

₹46,602

Value

₹46,60,268

Progress

Issue28-Mar-2026, 10:43 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

19

Category

Visualization of streamlines

Bid Type

Two Packet Bid

Key Highlights

  • OEM/Authorized Distributor requirement with proper authorization certificate
  • EMD of ₹46,602 and estimated contract value ₹46,60,268
  • 3 years government/PSU supply experience for similar products
  • Supply, installation, testing and commissioning scope
  • Delivery flexibility up to 25% quantity with extension rules
  • On-site installation and operator training by OEM-certified staff

Categories 44

Tender Overview

The Technical Education Department Uttar Pradesh invites bids for the supply, installation, testing and commissioning of a range of fluid dynamics and hydraulic demonstration equipment at Gorakhpur, Uttar Pradesh 273001. Estimated project value is ₹46,60,268 with an EMD of ₹46,602. Scope includes multiple demonstration rigs covering flow, pipes, turbines, pumps, and hydrostatics, intended for government technical education institutions. Bidders must demonstrate OEM/authorized reseller capacity and prior government experience, with scope to scale by up to 25% per option clause. This procurement emphasizes OEM installation capability and post-installation support.

Technical Specifications & Requirements

  • Scope of supply: Supply, installation, testing and commissioning of 19 demonstration items related to hydraulic and fluid mechanics experiments (flow over notches, Venturi, orifice meters, Pelton/Francis turbines, water hammer, Reynolds apparatus, etc.).
  • Delivery & commissioning: On-site installation at Gorakhpur facility; training if applicable; performance verification by OEM-certified personnel.
  • Experience & turnover: Bidder or OEM must have 3 years of regular government supply experience for similar category products; include copies of contracts for each year.
  • Data sheet alignment: Upload product data sheets; ensure no mismatch with technical parameters.
  • Warranty & support: OEM/authorized reseller to provide installation support and alignment with scope of supply; ensure spare parts availability.
  • Financials: Provide audited turnover statements for the last 3 financial years; turnover threshold as per bid document.
  • Option clause: 25% quantity flex within contracted rates, with proportional delivery timeline adjustment.
  • Quality & compliance: Data sheets to match with offered products; compliance with government procurement norms.

Terms, Conditions & Eligibility

  • EMD: ₹46,602 (as per tender terms) submitted upfront in required form.
  • Validity of bid: Bid must include OEM authorization and service arrangements; data sheet alignment is mandatory.
  • Delivery period: Delivery and commissioning timelines to be defined; option clause may adjust delivery up to 25% of contracted quantity.
  • Quality control: Regular government contract experience; evidence via copies of relevant contracts.
  • Payment terms: Scope states supply, installation, testing and commissioning; exact payment terms to be defined in purchase order.
  • Documentation: GST, PAN, experience certificates, financial statements, EMD documents, OEM authorization, and technical bid documents as required.
  • Liabilities: Installation by OEM-certified resources; non-compliance may lead to bid rejection.

Key Specifications

  • Scope includes 19 demonstration items related to fluid dynamics

  • Delivery and on-site installation at Gorakhpur, UP

  • Data sheets must match offered product specifications

  • OEM-certified installation, testing and commissioning

  • 3-year government or PSU supply experience required

  • Turnover requirement: minimum average annual turnover over last 3 years

  • EMD ₹46,602; total estimated value ₹46,60,268

Terms & Conditions

  • EMD of ₹46,602 required; bid security details per terms

  • 3 years government/PSU experience with relevant contracts

  • Up to 25% quantity variation allowed during contract

Important Clauses

Payment Terms

Scope includes supply, installation, testing and commissioning; specific payment terms to be defined in purchase order.

Delivery Schedule

Option clause allows quantity up to 25% increase with proportional delivery time; minimum delivery extension 30 days when applicable.

Penalties/Liquidated Damages

Not specified; penalties to be defined in purchase order; ensure compliance with OEM installation timelines.

Bidder Eligibility

  • 3 years of government/PSU supply experience for similar equipment

  • Not under liquidation or bankruptcy; provide undertaking

  • Authorized OEM/distributor with data sheet alignment and OEM authorization

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Stability of floating bodies , Impact of jet on vanes , Bernoullis principle , Discharge through venturi rota and orifice meter , Free and forced vortex apparatus , Flow over notches , Pelton wheel turbine demonstration , Losses due to friction in pipelines , Flow through orifice and mouthpiece , Losses due to pipe fittings , Hydrostatic bench , Cavitation apparatus , Francis turbine demonstration , Centrifugal pump demonstration , Water hammer apparatus , Reciprocating pump test rig , Visualization of streamlines , Centre of pressure apparatus , Reynolds apparatus

Authority Records

TECHNICAL EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9110697.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 19 Items Sign in for GEM prices

#1

Stability of floating bodies

As per sr no 1 of specification document

1 pieces Delivery: 30 days
#2

Impact of jet on vanes

As per sr no 2 of specification document

1 pieces Delivery: 30 days
#3

Bernoullis principle

As per sr no 3 of specification document

1 pieces Delivery: 30 days
#4

Discharge through venturi rota and orifice meter

As per sr no 4 of specification document

1 pieces Delivery: 30 days
#5

Free and forced vortex apparatus

As per sr no 5 of specification document

1 pieces Delivery: 30 days
#6

Flow over notches

As per sr no 6 of specification document

1 pieces Delivery: 30 days
#7

Pelton wheel turbine demonstration

As per sr no 7 of specification document

1 pieces Delivery: 30 days
#8

Losses due to friction in pipelines

As per sr no 8 of specification document

1 pieces Delivery: 30 days
#9

Flow through orifice and mouthpiece

As per sr no 9 of specification document

1 pieces Delivery: 30 days
#10

Losses due to pipe fittings

As per sr no 10 of specification document

1 pieces Delivery: 30 days
#11

Hydrostatic bench

As per sr no 11 of specification document

1 pieces Delivery: 30 days
#12

Cavitation apparatus

As per sr no 12 of specification document

1 pieces Delivery: 30 days
#13

Francis turbine demonstration

As per sr no 13 of specification document

1 pieces Delivery: 30 days
#14

Centrifugal pump demonstration

As per sr no 14 of specification document

1 pieces Delivery: 30 days
#15

Water hammer apparatus

As per sr no 15 of specification document

1 pieces Delivery: 30 days
#16

Reciprocating pump test rig

As per sr no 16 of specification document

1 pieces Delivery: 30 days
#17

Visualization of streamlines

As per sr no 17 of specification document

1 pieces Delivery: 30 days
#18

Centre of pressure apparatus

As per sr no 18 of specification document

1 pieces Delivery: 30 days
#19

Reynolds apparatus

As per sr no 19 of specification document

1 pieces Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements for last 3 years

4

Experience/contract copies for similar government projects (3 years)

5

OEM authorization / distributor authorization certificate

6

Data sheet of offered products

7

Bid security / EMD submission proof

8

Technical bid documents

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for fluid dynamics demonstration equipment tender in Gorakhpur UP 2026?

Bidders must submit GST, PAN, audited turnover for three years, and OEM authorization along with data sheets for all 19 items. Include EMD ₹46,602 and evidence of prior government contracts for similar products. Ensure data sheets match offered specifications and employment of OEM-certified installation personnel.

What documents are required for the Uttar Pradesh demo rigs tender submission?

Required documents include GST certificate, PAN, audited financials for last 3 years, OEM authorization, data sheets for offered products, evidence of 3-year government/PSU supply experience, and EMD submission. Technical bid documents must align with product data sheets and contract scope.

What is the EMD amount and its purpose for this tender?

The EMD is ₹46,602, serving as a bid security to ensure seriousness of bidders. It must be submitted with the bid as specified, with refunds according to bid outcomes. Failure to meet terms may result in bid rejection.

What are the key technical requirements for the 19 demonstration items?

Items cover flow, jet impact, Venturi/Orifice meters, turbine demonstrations, water hammer, Reynolds apparatus, and hydrostatic benches. Data sheets must reflect exact capacities, performance parameters, and conformity to government procurement norms; installation by OEM-certified personnel is mandated.

When is the delivery and commissioning expected for Gorakhpur equipment?

Delivery terms allow up to 25% quantity variation with a proportional extension; minimum extension rules require a base delivery timeframe, with additional time determined by (increased quantity / original quantity) × original period, minimum 30 days.

What experience criteria must bidders meet for this UP tender?

Bidders or OEMs must show 3 years of regular government/PSU supply of similar products, with contract copies for each year. This ensures proven capability to meet government procurement standards and installation requirements.