TenderDekho Logo
Active GEM

Open Tender for Core Switch and Ports,Next Generation Firewall cum WiFi User Controller,Unpopulated SFP and MACSec in DIBRUGARH, ASSAM

Bid Publish Date

11-Aug-2026, 4:38 pm

Bid End Date

01-Sep-2026, 5:00 pm

EMD

₹1,58,775

Progress

Issue11-Aug-2026, 4:38 pm
AwardPending

Assam Valley Fertilizer And Chemical Company Ltd invites bids for Core Switch and Ports, Next Generation Firewall cum WiFi User Controller, Unpopulated SFP and MACSec capable, PoE and 8x10G unpopulated SFP and MACSec capable, Wireless Controller Management Platform, Wireless Access Point, 10 Gigabit Ethernet SFP and module, Cat6 UTP Cable, Cat6 24Port loaded Patch Panel, Cat6 Information outlet with SMB, Cat6 Patch Cord 1m, Cat6 Patch Cord 2m, Cat6A UTP Cable, 6Port LIU including accessories, OFC Patch Cord, 15U Wall mount Indoor Rack including accessories, 42U Server Rack including accessories, Caching capping with accessories, 10KVA Online UPS with Battery Backup, 1KVA Line Interactive UPS, Installation of 24 12 6Port LIU including accessories, Installation of Network Rack including accessories including labelling with Kits, Installation of Core Switch including accessories, Installation of Next Generation Firewall cum WiFi User Controller, Installation of Network PoE Non-PoE Switch including power supply, Installation of Cat6 IO Box with SMB including labelling with Kits, Installation of Cat6 24Port Patch Panel including labelling with Kits, Laying of Cat6 UTP Cable with caching capping and accessories with nodes reports as required, Electrical work for UPS including Installation of 10 KVA Online UPS in DIBRUGARH, ASSAM. Quantity: 594. Submission Deadline: 01-09-2026 17: 00: 00. Submit your proposal before the deadline.

Tender Data

Bid Details

Quantity

594

Category

Core Switch and Ports

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

35

OEM Avg. Turnover

150

Past Performance

70 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Core Switch and Ports , Next Generation Firewall cum WiFi User Controller , Unpopulated SFP and MACSec capable , PoE and 8x10G unpopulated SFP and MACSec capable , Wireless Controller Management Platform , Wireless Access Point , 10 Gigabit Ethernet SFP and module , Cat6 UTP Cable , Cat6 24Port loaded Patch Panel , Cat6 Information outlet with SMB , Cat6 Patch Cord 1m , Cat6 Patch Cord 2m , Cat6A UTP Cable , 6Port LIU including accessories , OFC Patch Cord , 15U Wall mount Indoor Rack including accessories , 42U Server Rack including accessories , Caching capping with accessories , 10KVA Online UPS with Battery Backup , 1KVA Line Interactive UPS , Installation of 24 12 6Port LIU including accessories , Installation of Network Rack including accessories including labelling with Kits , Installation of Core Switch including accessories , Installation of Next Generation Firewall cum WiFi User Controller , Installation of Network PoE Non-PoE Switch including power supply , Installation of Cat6 IO Box with SMB including labelling with Kits , Installation of Cat6 24Port Patch Panel including labelling with Kits , Laying of Cat6 UTP Cable with caching capping and accessories with nodes reports as required , Electrical work for UPS including Installation of 10 KVA Online UPS

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

39

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Dibrugarh

Delivery Pincodes

786623

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sunil Singh Negi786623,AVFCCL Office, C/o BVFCL NamrupDibrugarhAssam786623130-

Authority Records

MINISTRY OF CHEMICALS AND FERTILIZERSFERTILIZERS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9741034.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 29 Items Sign in for GEM prices

#1

Core Switch and Ports

Core Switch and Ports

1 nos Delivery: 30 days
#2

Next Generation Firewall cum WiFi User Controller

Next Generation Firewall cum WiFi User Controller

1 nos Delivery: 30 days
#3

Unpopulated SFP and MACSec capable

Unpopulated SFP and MACSec capable

4 nos Delivery: 30 days
#4

PoE and 8x10G unpopulated SFP and MACSec capable

PoE and 8x10G unpopulated SFP and MACSec capable

2 nos Delivery: 30 days
#5

Wireless Controller Management Platform

Wireless Controller Management Platform

1 nos Delivery: 30 days
#6

Wireless Access Point

Wireless Access Point

20 nos Delivery: 30 days
#7

10 Gigabit Ethernet SFP and module

10 Gigabit Ethernet SFP and module

16 nos Delivery: 30 days
#8

Cat6 UTP Cable

Cat6 UTP Cable

10 box Delivery: 30 days
#9

Cat6 24Port loaded Patch Panel

Cat6 24Port loaded Patch Panel

6 nos Delivery: 30 days
#10

Cat6 Information outlet with SMB

Cat6 Information outlet with SMB

120 nos Delivery: 30 days
#11

Cat6 Patch Cord 1m

Cat6 Patch Cord 1m

160 nos Delivery: 30 days
#12

Cat6 Patch Cord 2m

Cat6 Patch Cord 2m

100 nos Delivery: 30 days
#13

Cat6A UTP Cable

Cat6A UTP Cable

1 box Delivery: 30 days
#14

6Port LIU including accessories

6Port LIU including accessories

2 nos Delivery: 30 days
#15

OFC Patch Cord

OFC Patch Cord

2 nos Delivery: 30 days
#16

15U Wall mount Indoor Rack including accessories

15U Wall mount Indoor Rack including accessories

2 nos Delivery: 30 days
#17

42U Server Rack including accessories

42U Server Rack including accessories

1 nos Delivery: 30 days
#18

Caching capping with accessories

Caching capping with accessories

1 jobs Delivery: 30 days
#19

10KVA Online UPS with Battery Backup

10KVA Online UPS with Battery Backup

1 nos Delivery: 30 days
#20

1KVA Line Interactive UPS

1KVA Line Interactive UPS

2 nos Delivery: 30 days
#21

Installation of 24 12 6Port LIU including accessories

Installation of 24 12 6Port LIU including accessories

2 nos Delivery: 30 days
#22

Installation of Network Rack including accessories including labelling with Kits

Installation of Network Rack including accessories including labelling with Kits

3 nos Delivery: 30 days
#23

Installation of Core Switch including accessories

Installation of Core Switch including accessories

1 nos Delivery: 30 days
#24

Installation of Next Generation Firewall cum WiFi User Controller

Installation of Next Generation Firewall cum WiFi User Controller

1 nos Delivery: 30 days
#25

Installation of Network PoE Non-PoE Switch including power supply

Installation of Network PoE Non-PoE Switch including power supply

6 nos Delivery: 30 days
#26

Installation of Cat6 IO Box with SMB including labelling with Kits

Installation of Cat6 IO Box with SMB including labelling with Kits

120 nos Delivery: 30 days
#27

Installation of Cat6 24Port Patch Panel including labelling with Kits

Installation of Cat6 24Port Patch Panel including labelling with Kits

6 nos Delivery: 30 days
#28

Laying of Cat6 UTP Cable with caching capping and accessories with nodes reports as required

Laying of Cat6 UTP Cable with caching capping and accessories with nodes reports as required

1 jobs Delivery: 30 days
#29

Electrical work for UPS including Installation of 10 KVA Online UPS

Electrical work for UPS including Installation of 10 KVA Online UPS

1 jobs Delivery: 30 days

Categories 34

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Authorization Certificate

5

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer