TenderDekho Logo
Closed GEM

State Bank of India Varansi Procurement: 1.5 Ton Split AC, 4.0 KVA Stabiliser & Associated Hardware 2026

Bid Publish Date

19-Sep-2026, 7:02 pm

Bid End Date

29-Sep-2026, 8:00 pm

Value

₹2,36,050

Progress

Issue19-Sep-2026, 7:02 pm
AwardPending

Key Highlights

  • • OEM authorization required for non-OEM bidders with complete contact details
  • • Compatibility with existing SBI inventory; supplier to provide necessary integration hardware/software at no extra cost
  • • 25% quantity variation right during contract and extended delivery period per option clause
  • • Data Sheet upload mandatory; strict parameter verification to avoid bid rejection

Tender Overview

State Bank of India seeks procurement of 1.5 Ton split AC, 4.0 KVA wall-mounted stabiliser, drain pipe, copper refrigerant piping set, wire, and robo st MS angle for delivery to the SBI Varansi campus, Uttar Pradesh. Estimated value is ₹236,050. The BoQ lists a total of 7 items, though specific quantities are not disclosed for each line. The delivery address is the SBI administrative office, Varansi Campus, with installation/commissioning as applicable. The option clause permits up to 25% quantity variation at contract and extended periods, ensuring flexibility in supply. Data sheet alignment and OEM authorization are mandatory for bid validity. This tender emphasizes compatibility with the SBI existing inventory and requires non-obsolete products with at least 1 year residual market life. The tender is framed under the State Bank of India procurement program in Uttar Pradesh, focusing on standard-compliant, OEM-authorised equipment.

Technical Specifications & Requirements

  • Product names from title/BOQ: 1.5 Ton Split AC, 4.0 KVA stabiliser, drain pipe, copper refrigerant piping set, wire, MS angle (Robost brand referenced as MS angle).
  • Est. value: ₹236,050; EMD not specified.
  • Standards/Compliance: Data sheet must match product parameters; OEM authorization required for non-OEM bidders; compatibility with existing SBI installation is mandatory.
  • Delivery scope: Delivery and installation/commissioning at SBI Varansi campus address; minimum disruption.
  • Documentation: Upload Data Sheet; include OEM authorization where applicable; ensure product is not end-of-life within 1 year residual life.
  • Compatibility: Ensure supplied items integrate with existing SBI inventory at the Varansi facility.
  • Delivery timeline: Not explicitly stated; option to extend delivery per clause; minimum extension logic applies.
  • Validation: Mismatch in technical parameters may lead to bid rejection.

Terms, Conditions & Eligibility

  • EMD: Not specified.
  • Delivery: Address: STATE BANK OF INDIA, 9 / 14 VIP GUEST HOUSE ADMINISTRATIVE OFFICE VARANASI CAMPUS, OPPOSITE KACHAHERY HARMAUTIA, VARANASI, UP.
  • OEM authorization: Required with vendor bid submission; include name, designation, address, email, phone.
  • Warranty/compatibility: Products must be compatible with SBI existing system; include necessary hardware/software to ensure compatibility at no extra cost.
  • Data Sheet: Mandatory data sheet upload; must align with offered product specifications.
  • Obsolescence: Bidder must supply non-obsolete items with at least 1 year residual market life.
  • GST: GST applied per actuals or as per applicable rate, whichever is lower, within quoted GST percentage.
  • Delivery window flexibility: Option clause allows up to 25% quantity variation and extended delivery period as described.
  • Payment terms: Not explicitly specified; GST treatment as above.

Key Specifications

  • 1.5 Ton Split AC

  • 4.0 KVA wall-mounted stabiliser

  • Drain pipe

  • Copper refrigerant piping set

  • Electrical wire

  • Robost MS angle (MS angle steel) for mounting

Terms & Conditions

  • Delivery quantified by option clause: +25% quantity, extended period with minimum 30 days

  • OEM authorization and data sheet mandatory for bid submission

  • Items must be non-obsolete with at least 1 year residual market life

Important Clauses

Payment Terms

GST as actuals or as per applicable rates; maximum of quoted GST %. No explicit advance or milestone payments noted.

Delivery Schedule

Delivery to SBI Varansi campus; timeframes governed by option clause with minimum 30 days extension logic.

Penalties/Liquidated Damages

Not explicitly stated; bid must adhere to delivery and installation timelines as per terms.

Bidder Eligibility

  • Must supply non-obsolete items with at least 1 year residual market life

  • Must provide OEM authorization or approved distributor details

  • Must upload Data Sheet and ensure compatibility with SBI inventory

Advertisement

Authority & Contact

Office Name

Lho Lucknow

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

75

Category

1.5 Tr Split AC

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

80 %

Warranty Period

3 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

1.5 Tr Split AC , 4.0 KVA wall mounted stabiliser , Drain Pipe , copper refrigerant piping set , Wire , Robost MS Angle

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

12

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

20

Delivery Locations

1

Delivery Cities

Varanasi

Delivery Pincodes

221002

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sonu Singh221002,STATE BANK OF INDIA, ADMINISTRATIVE OFFICE, OPP. KACHAHARI ROADVaranasiUttar Pradesh221002520-

Authority Records

MINISTRY OF FINANCEFINANCIAL SERVICES DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9919568.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

1.5 Tr Split AC

Supply of 1.5 TR hi wall type BEE rated (2025)5-Star inverter technology split air conditioner with full function wireless remote and auto restart feature, with indoor/outdoor unit, gas charge, Copper condenser coils and Copper cooling coils company provided copper refrigerant pipe complete in all respects.

5 nos Delivery: 20 days
#2

4.0 KVA wall mounted stabiliser

Supply & installation of 4.0 KVA (12 AMP), wall mounted stabiliser with TDR (1.5 Split ACs), having Copper winding with voltage range of 130-280V, complete in all respects.

5 nos Delivery: 20 days
#3

Drain Pipe

Supply, installation, testing and commissioning of PVC 25 mm water pipe with accessories and taking care to prevent leakages, for water drainage in concealed manner

20 meter Delivery: 20 days
#4

Drain Pipe

Supply, installation, testing and commissioning of PVC 30 mm water pipe with accessories and taking care to prevent leakages, for water drainage in concealed manner

5 meter Delivery: 20 days
#5

copper refrigerant piping set

Supply, installation, testing and commissioning of insulated copper refrigerant piping set (suction and discharge) duly insulated by nitrile rubber for Split AC.

15 meter Delivery: 20 days
#6

Wire

Supply, installation, testing and commissioning of inter connecting wiring/ cabling between indoor and outdoor of split AC

20 meter Delivery: 20 days
#7

Robost MS Angle

Supply and installation of robust MS angle, MS flat fabricated floor/ wall mounting stand suitable for outdoor units of Cassette/Split Acs

5 nos Delivery: 20 days
Advertisement

Categories 47

Required Documents

1

GST registration certificate

2

PAN card of bidder

3

Data Sheet of offered products

4

OEM authorization/certificate or authorized distributor details

5

Experience certificates for similar procurement (if available)

6

Financial statements or turnover evidence (as applicable by bidder)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for SBI Varansi security equipment tender 2026?

Bidders must submit Data Sheets for 1.5 ton split AC, 4.0 KVA stabiliser and accessories, along with OEM authorization. Include GST details, ensure non-obsolete status with at least 1 year residual market life, and comply with the option clause allowing up to 25% quantity variation.

What documents are required for SBI Varansi procurement bid 2026?

Submit GST certificate, PAN, Data Sheet, OEM authorization, experience certificates for similar work, and financial statements. Ensure the Data Sheet matches product specifications and include any distributor authorization if applicable.

What are the delivery terms for the SBI Varansi tender 2026?

Delivery must occur at STATE BANK OF INDIA, 9/14 VIP GUEST HOUSE, VARANASI CAMPUS. The option clause permits up to 25% quantity variation and the extended delivery period, with a minimum extension of 30 days depending on calculated time.

Which standards or compliance are required for SBI procurement in UP?

Data sheet verification is mandatory; ensure items are not end-of-life within 1 year residual life. OEM authorization is required for non-OEM bidders; compatibility with SBI inventory is a must.

What is the estimated value and scope for SBI Varansi tender 2026?

Estimated value is ₹236,050 for a bundle including a 1.5 ton split AC, 4.0 KVA stabiliser, drain pipe, copper piping set, wire, and MS angle. 7 total items listed in BOQ, with specific quantities not disclosed publicly.

How to ensure bid compatibility with SBI existing system in UP?

Provide compatibility documentation and include necessary hardware/software to integrate with SBI’s current inventory at Varansi campus, at no extra cost. Include OEM authorization and ensure Data Sheet alignment with offered parameters.

When is GST applied for SBI Varansi tender 2026?

GST is applied as actuals or at the applicable rate, whichever is lower, within the quoted GST percentage. Bidders must consider GST compliance in pricing and provide correct GST details in bid submission.

What is required for Data Sheet submission in SBI Varansi bid?

Upload the Data Sheet with exact product specifications; mismatch can cause bid rejection. Data Sheet must reflect 1.5 Ton AC, 4.0 KVA stabiliser, copper piping, drain pipe, wire, and MS angle specifics.

Advertisement