PISTON SLEEVE,PISTON WITH RING,HEAD GASKET,VALVE INLET AND OUTLET,VALVE OIL SEAL,VALVE LOCK,PUSH RO
Indian Army
ALMORA, UTTARAKHAND
Progress
RAQuantity
21
Category
PIPE ISI CLASS BGI FIVE HUNDRED FEET
Bid Type
Two Packet Bid
Public procurement opportunity for Kendriya Vidyalaya Sangathan BUTTERFLY VALVE WITH INSTALLATION, NRV VALVE WITH INSTALLATION, AIR RELEASE VALVE WITH INSTALLATION, CONNECTION INLET WITH INSTALLATION, MONO BLOCK PUMP WITH INSTALLATION, FIRE ALARM WITH INSTALLATION, PIPE ISI CLASS BGI FIVE HUNDRED FEET, PIPE ISI FOR FIRE FIGHTING EQUIPMENT, COMPLETE INSTALLATION TO BE DONE in DAHOD, GUJARAT. Quantity: 21 issued by. Submission Deadline: 16-09-2025 15: 00: 00. View full details and respond.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
ALMORA, UTTARAKHAND
Indian Army
DIMAPUR, NAGALAND
Indian Army
AMRITSAR, PUNJAB
Indian Army
ALLAHABAD, UTTAR PRADESH
Indian Army
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | BUTTERFLY VALVE WITH INSTALLATION | FIRE FIGHTING EQUIPMENT | 6 | pieces | buyer-2195 | 10 |
| 2 | NRV VALVE WITH INSTALLATION | FIRE FIGHTING EQUIPMENT | 1 | pieces | buyer-2195 | 10 |
| 3 | AIR RELEASE VALVE WITH INSTALLATION | FIRE FIGHTING EQUIPMENT | 1 | pieces | buyer-2195 | 10 |
| 4 | CONNECTION INLET WITH INSTALLATION | 2WAY | 1 | pieces | buyer-2195 | 10 |
| 5 | MONO BLOCK PUMP WITH INSTALLATION | 15 HP | 1 | pieces | buyer-2195 | 10 |
| 6 | FIRE ALARM WITH INSTALLATION | 2 ZONE | 1 | pieces | buyer-2195 | 10 |
| 7 | PIPE ISI CLASS BGI FIVE HUNDRED FEET | FOUR INCH | 1 | pieces | buyer-2195 | 10 |
| 8 | PIPE ISI FOR FIRE FIGHTING EQUIPMENT | FOUR INCH PIPENOZZLE WITH SS FITTING | 8 | pieces | buyer-2195 | 10 |
| 9 | COMPLETE INSTALLATION TO BE DONE | ALL ITMES | 1 | pieces | buyer-2195 | 10 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
26-Sep-2025, 5:00 pm
End
27-Sep-2025, 5:46 pm
Duration: 25 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | CENTRE TAP ENGINEERING Under PMA | - | 15-09-2025 10:01:32 | Disqualified |
| 2 | EASY FIRE CONTROL SYSTEMS Under PMA | - | 08-09-2025 17:09:25 | Qualified |
| 3 | JAY AMBE FABRICATOR Under PMA | - | 14-09-2025 15:14:51 | Disqualified |
| 4 | PYRO DEFENCE CONTROL SYSTEM Under PMA | - | 15-09-2025 21:29:44 | Qualified |
| 5 | SBC ENTERPRISES Under PMA | - | 16-09-2025 11:34:48 | Qualified |
| 6 | Spark Jump Fire Protection Under PMA | - | 16-09-2025 14:55:58 | Qualified |
| 7 | TOP FLAM TECH Under PMA | - | 16-09-2025 13:20:59 | Disqualified |
| 8 | UNIVERSAL ENGINEERS Under PMA | - | 27-08-2025 12:48:20 | Qualified |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | EASY FIRE CONTROL SYSTEMS(MSE,MII) Under PMA Winner | ₹4,29,500 | Item Categories : BUTTERFLY VALVE WITH INSTALLATION,NRV VALVE WITH INSTALLATION,AIR RELEASE VALVE WITH INSTALLATION,C |
| L2 | SBC ENTERPRISES (MSE,MII) Under PMA | ₹4,30,994 | Item Categories : BUTTERFLY VALVE WITH INSTALLATION,NRV VALVE WITH INSTALLATION,AIR RELEASE VALVE WITH INSTALLATION,C |
| L3 | UNIVERSAL ENGINEERS (MSE,MII) Under PMA | ₹5,78,804 | Item Categories : BUTTERFLY VALVE WITH INSTALLATION,NRV VALVE WITH INSTALLATION,AIR RELEASE VALVE WITH INSTALLATION,C |
| L4 | PYRO DEFENCE CONTROL SYSTEM (MSE,MII) Under PMA | ₹6,38,500 | Item Categories : BUTTERFLY VALVE WITH INSTALLATION,NRV VALVE WITH INSTALLATION,AIR RELEASE VALVE WITH INSTALLATION,C |
🎉 L1 Winner
EASY FIRE CONTROL SYSTEMS(MSE,MII) Under PMA
Final Price: ₹4,29,500
Please sign in or create an account to view contract details and download result documents.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS