Bid Publish Date
12-Mar-2026, 6:15 am
Bid End Date
02-Sep-2026, 10:00 am
Value
₹0
Location
Progress
The issuing authority announces a tender for In-situ, Dual-Beam, Cross-Duct Transmissometer type PM Analyzers required for Continuous Emission Monitoring Systems at KTPS V and VI Stages stacks in TELANGANA. Submission Deadline: 02-09-2026 10: 00: 00. Last date to apply is approaching fast!
Tender Type
OPEN
Bid Submission Start
12-03-2026 19:00:00
Bid Validity
180
Evaluation
Item Wise
Tender Category
Goods
Tender Value
₹0
Processing Fee
₹3
Tender Fee Payable To
Transaction Fee Payable to 'TSTS ' payable at Hyderabad.
Bid To RA
No
Officer Inviting Bids
Superintending Engineer/A&P
Bid Opening Authority
Superintending Engineer/A&P
Address
o/o CE/O&M/KTPS-V&VI stages
Contact Details
9493122604
Document Source
ts_portal
Bidder should submit previous 5years Pos in supply of similar material to AP/TGGENCO/NTPC/BHEL/Singareni Thermal Power Plant etc. or any other power stations above 210MW Unit and shall furnish the documentary evidence such as performance certificates/PO copies of the similar material in support of qualifying requirements failing which offers are liable for rejection.
Bidder must be OEM or authorized dealer of Siemens/Yokogawa/Thermofisher/Forbersmarshall make only. Original Manufacturer must upload NSIC/SSI/MSME or any other relevant certificate(s). Authorized dealer must upload the authorization letter issued by the original manufacturer.
The product should be latest compliance to meet the CPCB Norms.
The bidder should submit life span certificate of analyzers.
The bidder should supply complete Continuous Emission Monitoring system specified in this specification.
The bidder should supply all analyzers/monitors, transmitters including all required accessories for completeness of analyzers furnished by him even though this may not be specifically stated in other clauses of this specification.
The bidder should supply all the necessary hardware, special cables and connectors for Continuous Emission Monitoring system.
9. The bidder shall be fully responsible for proper engineering, selection of hardware, manufacture, testing, installation, commissioning, calibration and satisfactory furnishing of complete and fully operational emission monitoring system, meeting the intent of this specification. All system components and accessories required for completeness of this system shall be furnished by the bidder altho
10. Preparation and submission of drawing/documents for approval /information to purchase/consultant.
All necessary interconnecting piping, tubing, fittings and valves etc. shall be furnished.
Testing commissioning and performance testing of the complete system.
Submission of QA/QC plans, inspection & testing of the equipment, submission of test certificate.
The bidder should include in his offer, the recommended spares for two years of operation, mandatory spares, erection hardware & special tools & tackles (if any).
The bidder must offer special tools & tackles and special calibration instruments required during start-up, trail run, operation and maintenance of the plant.
Bidders with poor performance in executing the previous purchase orders /bidders who have executed partial supplies during the delivery period/bidders who have not supplied the material even after several notices/bidders who supplied the material lately and suffered the works/bidders whose supplies failed during guarantee performance period/black listed firms are not eligible for quoting as we
Bidders who are technically suitable as per tender specifications and annexure enclosed can only be considered.
Responsibility for correctness of the information submitted in the online bid lies with bidder. If any information furnished in the bid is proved to be false at a later date, the bid will be rejected.
1. Bidder should submit previous 5years Pos in supply of similar material to AP/TGGENCO/NTPC/BHEL/Singareni Thermal Power Plant etc. or any other power stati...
1. The rates quoted shall be exclusive of Taxes. All Taxes and Charges shall be shown separately in Cost Component. 2. The quantities are likely to be increa...
As per tender documents
As per tender documents
Show Procedure for Bid Submission
Show Procedure for Bid Submission
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Tender documents
Discover companies most likely to bid on this tender