Hindustan Petroleum Corporation Ltd announces a tender for MS ANGLE, MASTIC FLOORING, PCC, BOLT, ANGLE FASTENER, DISMANTLING AND ASSEMBLY, GI PIPE, EQUIPMENT REMOVAL AND INSTALLATION, SUPPLY OF STRUCTURAL STEEL, MOFICATION OF STRUCTRUAL STEEL, FABRICATION OF STRUCTURAL STEEL in KOTA, RAJASTHAN. Quantity: 5575. Submission Deadline: 09-06-2025 15: 00: 00. Last date to apply is approaching fast!
Quantity
5575
Category
SUPPLY OF STRUCTURAL STEEL
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
MS ANGLE , MASTIC FLOORING , PCC , BOLT , ANGLE FASTENER , DISMANTLING AND ASSEMBLY , GI PIPE , EQUIPMENT REMOVAL AND INSTALLATION , SUPPLY OF STRUCTURAL STEEL , MOFICATION OF STRUCTRUAL STEEL , FABRICATION OF STRUCTURAL STEEL
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
MS ANGLE
Refer tender document
MS ANGLE
Refer tender document
MASTIC FLOORING
Refer tender document
PCC
Refer tender document
BOLT
Refer tender document
ANGLE FASTENER
Refer tender document
DISMANTLING AND ASSEMBLY
Refer tender document
GI PIPE
Refer tender document
EQUIPMENT REMOVAL AND INSTALLATION
Refer tender document
EQUIPMENT REMOVAL AND INSTALLATION
Refer tender document
EQUIPMENT REMOVAL AND INSTALLATION
Refer tender document
EQUIPMENT REMOVAL AND INSTALLATION
Refer tender document
SUPPLY OF STRUCTURAL STEEL
Refer tender document
MOFICATION OF STRUCTRUAL STEEL
Refer tender document
FABRICATION OF STRUCTURAL STEEL
Refer tender document
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | MS ANGLE | Refer tender document | 1,140 | kg | sushiltatwal | 42 | |
| 2 | MS ANGLE | Refer tender document | 1,200 | kg | sushiltatwal | 42 | |
| 3 | MASTIC FLOORING | Refer tender document | 120 | sqm | sushiltatwal | 42 | |
| 4 | PCC | Refer tender document | 130 | sqm | sushiltatwal | 42 | |
| 5 | BOLT | Refer tender document | 52 | kg | sushiltatwal | 42 | |
| 6 | ANGLE FASTENER | Refer tender document | 90 | kg | sushiltatwal | 42 | |
| 7 | DISMANTLING AND ASSEMBLY | Refer tender document | 300 | rm | sushiltatwal | 42 | |
| 8 | GI PIPE | Refer tender document | 20 | m | sushiltatwal | 42 | |
| 9 | EQUIPMENT REMOVAL AND INSTALLATION | Refer tender document | 12 | ea | sushiltatwal | 42 | |
| 10 | EQUIPMENT REMOVAL AND INSTALLATION | Refer tender document | 1 | ea | sushiltatwal | 42 | |
| 11 | EQUIPMENT REMOVAL AND INSTALLATION | Refer tender document | 1 | ea | sushiltatwal | 42 | |
| 12 | EQUIPMENT REMOVAL AND INSTALLATION | Refer tender document | 1 | ea | sushiltatwal | 42 | |
| 13 | SUPPLY OF STRUCTURAL STEEL | Refer tender document | 1,000 | kg | sushiltatwal | 42 | |
| 14 | MOFICATION OF STRUCTRUAL STEEL | Refer tender document | 8 | ea | sushiltatwal | 42 | |
| 15 | FABRICATION OF STRUCTURAL STEEL | Refer tender document | 1,500 | kg | sushiltatwal | 42 |
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about RAJASTHAN tender market
The eligibility requirements include being a registered entity compliant with local regulations, having prior experience in similar projects, and possessing the necessary certifications. Bidders must also demonstrate their technical capabilities in handling materials like MS Angle and Structural Steel.
Bidders must provide relevant certificates such as:
To register for participation, interested parties should follow the outlined steps:
The tender emphasizes several technical specifications, including:
The payment terms typically include a structured payment schedule based on project milestones achieved. Additionally, a performance security may be required, ensuring that the contractor fulfills all obligations as stated in the contract.