Progress
RACommissioner-cum-secy. To Govt., s.t. & S.c Development, Minorities and Backward Classes Welfare Department Odisha invites bids for a Domestic Washing Machine supply, installation, testing and commissioning in Kandhamal, Odisha (762001). Estimated value: ₹6,000,000. The procurement emphasizes a wide scope including delivery across district locations, with option to increase/decrease quantities by up to 25% and mandatory approval of Detailed Design Drawings within 5 days post-award. The contract requires adherence to buyer-specified design and modifications, and risks delivery timeline adjustments if approval is delayed. The project differentiator includes site-wide deployment and operator training with statutory clearances, managed through a structured escalation and delivery framework.
Product category: Domestic Washing Machine with IoT connectivity
Washing capacity: not specified in kg; requires model-level confirmation
Drying capacity: not specified in kg; model-level confirmation
Provision for water heating: required (yes/no not specified)
Mounting: floor-standing with castors (if specified)
Lid: material details not specified
Cabinet/Drum materials: not specified; requires exact model data
Control panel: type not specified
Washing technology: not specified; model-dependent
Certification: BEE star rating, warranty terms, motor warranty
Test reports: Central Govt Lab/NABL/ILAC accredited lab required
Quantity fluctuation up to 25% at contracted rates with delivery adjustments
Detailed Design Drawings approval within 5 days; modification lists within 5 days
Delivery/installation at district-level addresses; no LD for drawing approval delays
GST responsibility with actual reimbursement; ensure non-obsolescence and 1-year residual life
Not explicitly provided; GST applicable at actuals or quoted rate; ensure compliance with statutory payments and any advance/milestone terms per contract.
Delivery period adjustable based on option clause; minimum 30 days for additional time; delivery starts from last date of original delivery order.
Not explicitly detailed; ensure to capture standard LD terms in final contract as per buyer terms and drawings approval delays.
Not under liquidation, court receivership, or similar proceedings
Not bankrupt with a valid undertaking to that effect
Not declared end-of-life by OEM within the next 12 months
Start
03-Feb-2026, 5:00 pm
End
04-Feb-2026, 5:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
384
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
30
OEM Avg. Turnover
120
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Washing Machine - Domestic Purpose (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar domestic washing machine projects
Financial statements or turnover proof
EMD/Security deposit document (if applicable)
Technical bid documents and product specifications
OEM authorization or manufacturer’s direct supply proof
Detailed Design Drawings and approval correspondence (post-award)
Test reports from Central Govt Lab/NABL/ILAC accredited lab
| Category | Specification | Requirement |
|---|---|---|
| Generic | Automation/Usage Type | Fully Automatic, Semi Automatic |
| Generic | Type of Machine | Washer with Dryer |
| Generic | Type of Loading | Top load |
| Generic | Washing Capacity (in kg) | 10 |
| Generic | Drying Capacity (in kg) | 5, 5.5, 6, 6.5, 7, 7.5, 8, 8.5, 9, 9.5, 10, 10.5, 11, 11.5, 12, 12.5, 13, 13.5, 14, 14.5, 15, 15.5, 16, NA |
| Generic | Provision for Water Heating | No |
| Generic | Type of Mounting | Wall Mounted, Portable, Floor Mounted |
| Generic | Provision for Castor Wheel | Yes, No, NA |
| Generic | Material of the Lid | Toughened Glass, Plastic/fiber, Metal |
| Generic | Material of the Cabinet | Plastic/fiber |
| Generic | Material of the Drum | Plastic/fiber |
| Generic | Type of Control Panel | Knobs, Digital Panel with Touch Buttons, Digital Panel with Tact Button |
| Generic | Washing Technology | Drum Type, Agitator Type, Impellor Type, Pulsator Type, NA |
| Generic | ioT connectivity | Yes, No |
| Generic | Type of Connectivity | Wifi, USB, Bluetooth, NA |
| Generic | List of accessories Included | User manual, Drain pipe, Inlet pipe, Stand, Cover |
| Power Ratings | BEE Star Rating | 1, 2, 3, 4, 5 Or higher |
| Certification and Trial Methodology | Comprehensive Warranty (in years) | 2, 3, 4, 5, 6, 7, 8, 9, 10, 1 |
| Certification and Trial Methodology | Motor Warranty (in years) | 5, 6, 7, 8, 9, 10 |
| Certification and Trial Methodology | Availability of test report from Central Govt Lab/NABL accredited lab/ILAC accredited Lab to prove conformity of the specification | Yes, No |
Key insights about ODISHA tender market
Bidders must submit GST, PAN, experience certificates, financials, EMD (if applicable), OEM authorizations, and technical drawings within 5 days of award approval; ensure IS/BCS conformity, BEE star rating and warranty terms; delivery terms align with 25% quantity flex and design approvals.
Required documents include GST registration, PAN, experience certificates for similar projects, financial statements, EMD documentation, technical bid, OEM authorization, and detailed design drawings with approval letters; ensure NABL/CGTL compliant test reports for conformity.
Specifications cover IoT connectivity, washing technology, control panel type, and provisions for water heating; exact washing/drying capacities are model-specific and must be confirmed, along with cabinet, drum materials, and presence of castor wheels.
Delivery time may extend by (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; original delivery period may be adjusted if drawings approval delays occur; LD terms are not specified here.
EMD amount is not disclosed in the data; GST applies to actuals or quoted rate; payment terms are not explicitly stated and will be defined in final contract along with any advance or milestone payments.
Bidders must provide Comprehensive Warranty and Motor Warranty; a test report from Central Govt Lab/NABL/ILAC accredited lab to prove conformity is required; delivery includes installation, testing, commissioning, and operator training.
Delivery and installation addresses are to be provided by the tendering authority; installations occur across district locations in Kandhamal, Odisha, with on-site commissioning and training as part of the scope.
Product must meet BEE star rating requirements, IS/IEC conformity protocols, and supply a NABL/CGTL/ILAC-lab tested conformity report; OEM authorizations may be required for model-specific compliance.