The procurement opportunity is an Electronic Weigh Bridge (Without Civil Work) defined for the Mineral Resource Department in Chhattisgarh. The bid carries an EMD of ₹5,00,000 and permits a quantity variation of up to 25% at contract award and during the contract term. Bidders must reference the full tender document for scope, timelines, and service levels. The requirement targets suppliers with the capacity to supply weigh bridge equipment under the stated terms, with emphasis on compliance and delivery readiness within contractual windows. The ATC clauses imply flexible quantity handling and price stability at contracted rates, subject to bidder compliance and documentary evidence submitted with the bid.
Product: Electronic Weigh Bridge (Without Civil Work)
EMD: ₹5,00,000
Quantity variation: up to 25% during contract
Delivery period: baseline from last delivery order; extended time formula with minimum 30 days
Turnover: average turnover for last 3 years as per bid document; corroborated by audited statements or CA certificate
25% quantity variation allowed at placement and during currency of contract
Delivery period computed from last date of original delivery order; minimum 30 days for extensions
Minimum average annual turnover for last 3 years required; documentary proof to be uploaded
Not explicitly stated in provided data; bidders should verify in tender document and ATC for EMI/Advance payment terms and schedule.
Delivery period begins from the last date of original delivery order; option clause may extend time; additional time = (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
Not specified in the snippet; refer to tender terms for LD/penalties, if any.
Must meet turnover requirement over the last 3 financial years as per bid document
Must submit EMD of ₹5,00,000 via approved mode
Must demonstrate capability to supply electronic weigh bridge equipment without civil works
Must provide OEM authorization if required by the tender terms
Must comply with all ATC terms and SLA referenced in the tender document
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | JAYANTA WEIGHING INDUSTRIES Under PMA | Make : LUNIA Model : JWI | 04-12-2025 14:41:29 | |
| 2 | KUMAR SYSTEM Under PMA | Make : EUROTECH Model : ETW-10 | 04-12-2025 12:45:45 | |
| 3 | RICHA ENTERPRISES Under PMA | Make : NA Model : Weigh Bridge | 29-11-2025 17:56:00 | |
| 4 | Shri Shyam Techno Under PMA | Make : laxmi Model : WB-CS | 04-12-2025 12:14:05 | |
| 5 | WEIGHTEC SCALE PRIVATE LIMITED Under PMA | Make : NA Model : Weigh Bridge | 11-12-2025 14:24:23 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | KUMAR SYSTEM( MSE Social Category:General ) Under PMA | Item Categories : Electronic Weigh Bridge (Without Civil Work) | |
| L2 | Shri Shyam Techno( MSE Social Category:General ) Under PMA | Item Categories : Electronic Weigh Bridge (Without Civil Work) | |
| L3 | WEIGHTEC SCALE PRIVATE LIMITED( MSE Social Category:General ) Under PMA | Item Categories : Electronic Weigh Bridge (Without Civil Work) |
Please sign in or create an account to view contract details and download result documents.
Quantity
6
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
400
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Electronic Weigh Bridge (Without Civil Work) (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
11-Dec-2025, 10:30 am
Opening Date
11-Dec-2025, 11:00 am
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements or CA certificate indicating turnover for the last 3 financial years
Experience certificates for similar Electronic Weigh Bridge supply/installation
EMD submission proof of ₹5,00,000
Technical bid documents showing compliance with weigh bridge specifications
OEM authorization or dealership certificates (if applicable)
Any other documents specified in the Terms and Conditions/ATC
Key insights about CHHATTISGARH tender market
Bidders should prepare an EMD of ₹5,00,000, provide turnover evidence for the last 3 years, submit GST, PAN, and experience certificates, and attach technical bid and OEM authorizations as required. Compliance with ATC terms and delivery timelines is essential; refer to tender document for exact scope and SLA.
Required documents include GST registration, PAN, audited financial statements or CA certificate showing 3-year turnover, experience certificates for similar weigh bridge supply, EMD receipt for ₹5,00,000, technical bid, and OEM authorization if applicable. Ensure submission with bid document as per ATC.
Delivery starts from the last date of the original delivery order. If extended, the additional time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. This ensures schedule alignment with contract quantities.
The purchaser may increase or decrease quantity up to 25% of the bid quantity at contract placement and during the contract term at contracted rates. Vendors must plan capacity accordingly and reflect in the bid pricing.
Eligibility requires meeting the turnover threshold for the last 3 financial years, submitting EMD of ₹5,00,000, providing relevant experience certificates, GST and PAN, and compliance with ATC terms and SLAs stated in the tender document.
The exact scope, timelines, SLA, and minimum component specifications are in the tender document referenced by the ATC. Bidders should review the full tender document to ensure technical compliance and alignment with the required electronic weigh bridge without civil work.
Payment terms are not explicitly stated in the snippet. Bidder should consult the tender document for detailed payment milestones, possible advance payment, and schedule, ensuring conformity with the EMD and SLAs described in ATC.
Anticipate potential order fluctuation by pricing a base quantity accurately and building scalable production plans. Include a clear cost impact framework for up to +25% and -25% changes, ensuring competitiveness at contracted rates during execution.