Sea Water Reverse Osmosis (SWRO) Membrane
Directorate General Of Lighthouses And Lightships
SINDHUDURG, MAHARASHTRA
Bid Publish Date
28-Oct-2025, 8:44 am
Bid End Date
17-Nov-2025, 1:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Bharat Petroleum Corporation Ltd seeks procurement of a membrane-less electrolyser with Balance of Plant (BOP) under the government e-marketplace framework. The contract contemplates flexible quantities, with a potential increase/decrease up to 25% of the bid quantity at contract placement and during currency, at contracted rates. Delivery timeline is tied to the order dates, with calculated extensions based on the formula: (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days. The ATC highlights adherence to the purchaser’s option clause; bidders must comply. Location details are not specified in the tender data.
Product/service names: membrane-less electrolyser with Balance of Plant (BOP)
Quantity/scale: not specified (BOQ items: 0)
Estimated value: not disclosed
Experience requirements: not explicitly stated (refer to ATC)
Quality/standards: not specified in data; must rely on ATC and standard GEM terms
Delivery/installation: delivery period rules governed by option clause; minimum 30 days extension
Warranty/AMC: not specified in provided data
Brand/OEM requirements: not specified
Quantity adjustment up to 25% at contract and during currency
Delivery extension calculated with minimum 30 days, per formula
Must comply with uploaded ATC; no explicit technical specs provided
EMD, value and documents to be confirmed on portal
No BOQ items listed; procurement follows GEM terms
Not specified in the provided data; verify ATC and tender terms on portal
Delivery period begins from last date of original delivery order; extended time calculated as (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not specified in data; review ATC and contract for LD provisions
Experience in supplying electrolysers or related energy/storage equipment
Demonstrated financial stability (audited statements)
GST registration and PAN authentication
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Directorate General Of Lighthouses And Lightships
SINDHUDURG, MAHARASHTRA
Satara District Panchayats
SATARA, MAHARASHTRA
Directorate Of Municipal Administration
BIJAPUR, KARNATAKA
Directorate Of Municipal Administration
BIJAPUR, KARNATAKA
Directorate Of Purchase And Stores
KANCHIPURAM, TAMIL NADU
Tender Results
Loading results...
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar electrolysis/BOP projects
Financial statements (audited where possible)
EMD/Security deposit documents (per tender terms)
Technical bid documents demonstrating product capability
OEM authorization letters (if applicable)
Any ATC-specific certificates uploaded by buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | NEWTRACE PRIVATE LIMITED Under PMA | Make : NA Model : Prabha Title : Membrane less Electrolyser with Balance of plant BOP | 14-11-2025 17:10:23 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | NEWTRACE PRIVATE LIMITED(MII) Under PMA | ₹40,46,318 | Item Categories : Membrane less Electrolyser with Balance of plant BOP |
Please sign in or create an account to view contract details and download result documents.
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financials, EMD, and technical bids, plus OEM authorizations if required. Ensure compliance with ATC, confirm the 25% quantity variation clause, and prepare delivery plans aligned to the extended schedule formula. Review portal notices for exact dates, quantities, and agreement terms.
Required documents include GST registration, PAN, experience certificates for similar projects, audited financial statements, EMD documents, technical bid submissions, and OEM authorization letters if applicable. Submit ATC-compliant technical documentation demonstrating capability to deliver membrane-less electrolyser with BOP.
Delivery follows the original delivery order date with an option to extend up to the calculated period: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. If the original period < 30 days, extension equals the original period. Ensure readiness for potential 25% quantity variation.
The tender data specifies ATC requirements uploaded by the buyer; exact standards are not listed. Bidders should verify IS/ISO/Electrolysis-specific standards in the ATC document and ensure ISO 9001 or equivalent quality systems and any OEM-specific certifications as applicable to membrane-less electrolyser with BOP.
The exact submission deadline is not provided in the available data. Bidders should monitor the GEM portal for the tender notices, ATC updates, and any addenda that modify delivery windows or required documentation before submitting the bid.
Eligibility checks include demonstrated experience in similar electrolysis equipment, valid GST and PAN, financial stability, and compliance with ATC. Prepare OEM authorizations if required and provide technical bid detailing membrane-less electrolyser with BOP capabilities, plus delivery and warranty plans.
Sign up now to access all documents
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS