Bid Publish Date
22-Jul-2026, 11:59 am
Bid End Date
01-Aug-2026, 12:00 pm
Location
Progress
The Rural Engineering Department, Uttar Pradesh, invites bids for a Honey Processing Unit under a government procurement process in Uttar Pradesh. The tender contemplates flexible quantity—up to 25% additional quantity during the contract period at contracted rates, with delivery timeline calculations tied to the original delivery period and adjusted per option usage. Bidders must ensure supply readiness with required material test certificates. This tender leverages standard acceptance criteria based on buyer lab testing outcomes. A minimum three-year turnover verification is mandated, with alternate turnover proof if company inception is under three years. The scope emphasizes compliance with delivery timelines, quantity management, and post-award certificate submission, with emphasis on reliable QA and documentation.
Honey Processing Unit procurement
Quantity flexibility up to 25% during contract
Minimum 30 days extension if extended delivery period chosen
Material Test Certificate mandatory with delivery
Acceptance based on buyer laboratory results
Turnover proof for last 3 financial years; CA/Cost Accountant certificate acceptable
Quantity variation up to 25% with contractual pricing
Delivery period adjustments based on option clause
Mandatory material test certification and lab-based acceptance
Not specified in provided data; verify in bid documents and ATC.
Delivery period starts from last date of original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days.
Not specified; bidders should review contract terms and ATC for LD provisions.
Minimum turnover proof for last 3 financial years as required
Academic or corporate eligibility to supply Honey Processing Units
Ability to meet material test certificate submission and QA requirements
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | KALSI AGRICULTURE WORKS Under PMA | Make : OEM Model : KALSI-GMP Title : HONEY PROCESSING UNIT | 01-08-2026 09:47:27 | |
| 2 | Madhumakhi Wala Under PMA | Make : OEM Model : GMP Title : HONEY PROCESSING UNIT | 29-07-2026 23:03:26 | |
| 3 | MAGHI RAM & SONS Under PMA | Make : NA Model : HONEY PROCESSING UNIT Title : HONEY PROCESSING UNIT | 01-08-2026 11:08:29 | |
| 4 | ONLY AND SURELY ORGANIC (OSO) AGRO PRODUCTS Under PMA | Make : OEM Model : OSO-HPP Title : HONEY PROCESSING UNIT | 30-07-2026 23:07:22 | |
| 5 | SUNRISE CHEMTEK INDUSTRIES Under PMA | Make : OEM Model : SCI-cGMP Title : HONEY PROCESSING UNIT | 28-07-2026 22:32:57 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SUNRISE CHEMTEK INDUSTRIES( MSE Social Category:General ) Under PMA | Item Categories : HONEY PROCESSING UNIT | |
| L2 | ONLY AND SURELY ORGANIC (OSO) AGRO PRODUCTS( MSE Social Category:General ) Under PMA | Item Categories : HONEY PROCESSING UNIT | |
| L3 | Madhumakhi Wala( MSE Social Category:General ) Under PMA | Item Categories : HONEY PROCESSING UNIT |
Please sign in or create an account to view contract details and download result documents.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
140 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
40
Past Performance
40 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
HONEY PROCESSING UNIT
Max Delivery Days
110
Delivery Locations
1
Delivery Cities
Saharanpur
Delivery Pincodes
247001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ravi | 247001,vikas bhawan saharanpur | Saharanpur | Uttar Pradesh | 247001 | 1 | 110 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Audited Balance Sheets or CA/Cost Accountant turnover certificate for last 3 years
Material Test Certificate to be sent with supply
Technical bid documents aligned with ATC/Corrigendum
OEM authorizations (if applicable) and any quality/certification certificates
Proof of incorporation or company registration (for turnover calculation if <3 years old)
Key insights about UTTAR PRADESH tender market
Bidders should first confirm eligibility including turnover proof for last 3 years, provide GST/PAN, and submit Material Test Certificate with the supply. Ensure to meet ATC requirements and upload all required certificates; review option clause for quantity variation up to 25% and deliver as per original delivery period extended accordingly.
Submit GST certificate, PAN, audited Balance Sheets or CA turnover certificate for 3 years, Material Test Certificate, technical bid documents per ATC, OEM authorizations if applicable, and company registration proof; ensure all certificates are uploaded to avoid rejection.
The purchaser may increase or decrease quantity up to 25% at contracted rates during placement and within the contract period. Additional time is calculated by (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.
Delivery begins from the last date of the original delivery order. If the option clause is exercised, extended time is calculated as specified, with a minimum 30-day extension; the buyer’s lab results determine acceptance.
Material Test Certificate is mandatory; acceptance depends on the buyer's laboratory results. Ensure all other required certificates per ATC/Corrigendum are uploaded; no specific ISO/IS standards are listed in the data but verify in official documents.
Provide turnover proof for the last three financial years ending 31st March; if entity is under 3 years old, use turnover figures from completed years post-incorporation as acceptable.
Bidder's offer may be rejected as per ATC and Corrigendum; ensure submission of all certificates, financials, and material test documentation to avoid disqualification.
Exact delivery timelines are governed by the original delivery period and option-based extensions; penalties or LD details are not specified here—consult the official bid document and ATC for precise LD rates and conditions.