Progress
Quantity
18
Category
OWS Rugged Processor Units
Bid Type
Two Packet Bid
Office Of Dg (aero) has released a public tender for OWS Rugged Processor Units, Mating Connectors with back shell for all connectors on ORPU, Vibration Test Fixture, Test Cable Harness with 3 meter cable length for all interfaces-One side circular connector on ORPU and other side standard connector, Engg Design Cost -Includes Thermal and Structural Analysis, Doc and Group A and B certificate if applicable, 3D Model, Mech and Elec design details, ESS Test for 2 nos, Environmental Tests MIL-STD- 810G, Power Supply Test MIL-STD-740F and EMI-EMC Test MIL-STD-461G for 1 nos in BANGALORE, KARNATAKA. Quantity: 18. Submission Deadline: 12-06-2026 10: 00: 00. Download documents and apply online.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
OWS Rugged Processor Units , Mating Connectors with back shell for all connectors on ORPU , Vibration Test Fixture , Test Cable Harness with 3 meter cable length for all interfaces-One side circular connector on ORPU and other side standard connector , Engg Design Cost -Includes Thermal and Structural Analysis, Doc and Group A and B certificate if applicable, 3D Model,Mech and Elec design details , ESS Test for 2 nos, Environmental Tests MIL-STD- 810G, Power Supply Test MIL-STD-740F and EMI-EMC Test MIL-STD-461G for 1 nos
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
OWS Rugged Processor Units
OWS Rugged Processor Units
Mating Connectors with back shell for all connectors on ORPU
Mating Connectors with back shell for all connectors on ORPU
Vibration Test Fixture
Vibration Test Fixture
Test Cable Harness with 3 meter cable length for all interfaces-One side circular connector on ORPU and other side standard connector
Test Cable Harness with 3 meter cable length for all interfaces-One side circular connector on ORPU and other side standard connector
Engg Design Cost -Includes Thermal and Structural Analysis, Doc and Group A and B certificate if applicable, 3D Model,Mech and Elec design details
Engg Design Cost -Includes Thermal and Structural Analysis, Doc and Group A and B certificate if applicable, 3D Model,Mech and Elec design details
ESS Test for 2 nos, Environmental Tests MIL-STD-810G, Power Supply Test MIL-STD-740F and EMI-EMC Test MIL-STD-461G for 1 nos
ESS Test for 2 nos, Environmental Tests MIL-STD-810G, Power Supply Test MIL-STD-740F and EMI-EMC Test MIL-STD-461G for 1 nos
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | OWS Rugged Processor Units | OWS Rugged Processor Units | 4 | pieces | [email protected] | 730 | |
| 2 | Mating Connectors with back shell for all connectors on ORPU | Mating Connectors with back shell for all connectors on ORPU | 4 | set | [email protected] | 730 | |
| 3 | Vibration Test Fixture | Vibration Test Fixture | 2 | pieces | [email protected] | 730 | |
| 4 | Test Cable Harness with 3 meter cable length for all interfaces-One side circular connector on ORPU and other side standard connector | Test Cable Harness with 3 meter cable length for all interfaces-One side circular connector on ORPU and other side standard connector | 4 | set | [email protected] | 730 | |
| 5 | Engg Design Cost -Includes Thermal and Structural Analysis, Doc and Group A and B certificate if applicable, 3D Model,Mech and Elec design details | Engg Design Cost -Includes Thermal and Structural Analysis, Doc and Group A and B certificate if applicable, 3D Model,Mech and Elec design details | 2 | job | [email protected] | 730 | |
| 6 | ESS Test for 2 nos, Environmental Tests MIL-STD-810G, Power Supply Test MIL-STD-740F and EMI-EMC Test MIL-STD-461G for 1 nos | ESS Test for 2 nos, Environmental Tests MIL-STD-810G, Power Supply Test MIL-STD-740F and EMI-EMC Test MIL-STD-461G for 1 nos | 2 | job | [email protected] | 730 |
Discover companies most likely to bid on this tender
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
12-Jun-2026, 10:00 am
Opening Date
12-Jun-2026, 10:30 am
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS