TenderDekho Logo
Closed GEM

Invitation to Bid - OWS Rugged Processor Units,Mating Connectors with back shell for all connectors on ORPU,Vibration T in BANGALORE, KARNATAKA

Bid Publish Date

06-May-2026, 12:00 pm

Bid End Date

12-Jun-2026, 10:00 am

Generate Docs

Progress

Issue06-May-2026, 12:00 pm
Corrigendum29-May-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

18

Category

OWS Rugged Processor Units

Bid Type

Two Packet Bid

Categories 16

Office Of Dg (aero) has released a public tender for OWS Rugged Processor Units, Mating Connectors with back shell for all connectors on ORPU, Vibration Test Fixture, Test Cable Harness with 3 meter cable length for all interfaces-One side circular connector on ORPU and other side standard connector, Engg Design Cost -Includes Thermal and Structural Analysis, Doc and Group A and B certificate if applicable, 3D Model, Mech and Elec design details, ESS Test for 2 nos, Environmental Tests MIL-STD- 810G, Power Supply Test MIL-STD-740F and EMI-EMC Test MIL-STD-461G for 1 nos in BANGALORE, KARNATAKA. Quantity: 18. Submission Deadline: 12-06-2026 10: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

OWS Rugged Processor Units , Mating Connectors with back shell for all connectors on ORPU , Vibration Test Fixture , Test Cable Harness with 3 meter cable length for all interfaces-One side circular connector on ORPU and other side standard connector , Engg Design Cost -Includes Thermal and Structural Analysis, Doc and Group A and B certificate if applicable, 3D Model,Mech and Elec design details , ESS Test for 2 nos, Environmental Tests MIL-STD- 810G, Power Supply Test MIL-STD-740F and EMI-EMC Test MIL-STD-461G for 1 nos

Authority Records

MINISTRY OF DEFENCEDEFENCE RESEARCH & DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9118728.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

OWS Rugged Processor Units

OWS Rugged Processor Units

4 pieces Delivery: 730 days
#2

Mating Connectors with back shell for all connectors on ORPU

Mating Connectors with back shell for all connectors on ORPU

4 set Delivery: 730 days
#3

Vibration Test Fixture

Vibration Test Fixture

2 pieces Delivery: 730 days
#4

Test Cable Harness with 3 meter cable length for all interfaces-One side circular connector on ORPU and other side standard connector

Test Cable Harness with 3 meter cable length for all interfaces-One side circular connector on ORPU and other side standard connector

4 set Delivery: 730 days
#5

Engg Design Cost -Includes Thermal and Structural Analysis, Doc and Group A and B certificate if applicable, 3D Model,Mech and Elec design details

Engg Design Cost -Includes Thermal and Structural Analysis, Doc and Group A and B certificate if applicable, 3D Model,Mech and Elec design details

2 job Delivery: 730 days
#6

ESS Test for 2 nos, Environmental Tests MIL-STD-810G, Power Supply Test MIL-STD-740F and EMI-EMC Test MIL-STD-461G for 1 nos

ESS Test for 2 nos, Environmental Tests MIL-STD-810G, Power Supply Test MIL-STD-740F and EMI-EMC Test MIL-STD-461G for 1 nos

2 job Delivery: 730 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC)

6

Additional Doc 3 (Requested in ATC)

7

Additional Doc 4 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

2 Updates
#1

Update

29-May-2026
#2

Update

27-May-2026

Extended Deadline

12-Jun-2026, 10:00 am

Opening Date

12-Jun-2026, 10:30 am