TenderDekho Logo
Active GEM

Open Tender for 10 sqmm 2 core Aluminium wire Make Havells Anchor Polycab or equivalent,2 ft x 2 ft Recess Ceiling in JAISALMER, RAJASTHAN

Bid Publish Date

03-Sep-2026, 5:39 pm

Bid End Date

14-Sep-2026, 6:00 pm

EMD

₹3,15,000

Location

JAISALMER , RAJASTHAN

Progress

Issue03-Sep-2026, 5:39 pm
AwardPending

Indian Army announces a tender for 10 sqmm 2 core Aluminium wire Make Havells Anchor Polycab or equivalent, 2 ft x 2 ft Recess Ceiling in JAISALMER, RAJASTHAN. Quantity: 7914. Submission Deadline: 14-09-2026 18: 00: 00. Last date to apply is approaching fast!

Tender Data

Bid Details

Quantity

7914

Category

Battery Connecting Cap Lead 1 point 5 Mtrs Length with Link lead Heavy Duty

Bid Type

Two Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

51

OEM Avg. Turnover

51

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

14

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Jaisalmer

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-JaisalmerJaisalmer--30060-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9835156.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 166 Items Sign in for GEM prices

#1

10 sqmm 2 core Aluminium wire Make Havells Anchor Polycab or equivalent

10 sqmm 2 core Aluminium wire Make Havells Anchor Polycab or equivalent

300 rm Delivery: 60 days
#2

2 ft x 2 ft Recess Ceiling light 36 watt Heavy Duty

2 ft x 2 ft Recess Ceiling light 36 watt Heavy Duty

10 nos Delivery: 60 days
#3

2 ft x 2 ft Surface Ceiling light 36 watt Heavy Duty

2 ft x 2 ft Surface Ceiling light 36 watt Heavy Duty

10 nos Delivery: 60 days
#4

Aluminium lugs 150 sqmm Heavy Duty

Aluminium lugs 150 sqmm Heavy Duty

30 nos Delivery: 60 days
#5

Aluminium Lugs 16 sqmm Heavy Duty

Aluminium Lugs 16 sqmm Heavy Duty

30 nos Delivery: 60 days
#6

Aluminium lugs 185 sqmm Heavy Duty

Aluminium lugs 185 sqmm Heavy Duty

30 nos Delivery: 60 days
#7

Aluminium Lugs 25 sqmm Heavy Duty

Aluminium Lugs 25 sqmm Heavy Duty

30 nos Delivery: 60 days
#8

Aluminium Lugs 35 sqmm Heavy Duty

Aluminium Lugs 35 sqmm Heavy Duty

30 nos Delivery: 60 days
#9

Aluminium lugs 400 sqmm Heavy Duty

Aluminium lugs 400 sqmm Heavy Duty

20 nos Delivery: 60 days
#10

Aluminium lugs 50 sqmm Heavy Duty

Aluminium lugs 50 sqmm Heavy Duty

100 nos Delivery: 60 days
#11

Aluminium lugs 70 sqmm Heavy Duty

Aluminium lugs 70 sqmm Heavy Duty

97 nos Delivery: 60 days
#12

Battery Connecting Cap Lead 1 point 5 Mtrs Length with Link lead Heavy Duty

Battery Connecting Cap Lead 1 point 5 Mtrs Length with Link lead Heavy Duty

10 nos Delivery: 60 days
#13

Bell Push Switch 05 or 06 Amp Heavy Duty

Bell Push Switch 05 or 06 Amp Heavy Duty

50 nos Delivery: 60 days
#14

Capacitor 2 point 5 Mfd Heavy Duty

Capacitor 2 point 5 Mfd Heavy Duty

300 nos Delivery: 60 days
#15

Capacitor 4 Mfd with copper Therminal Heavy Duty

Capacitor 4 Mfd with copper Therminal Heavy Duty

30 nos Delivery: 60 days
#16

Ceiling Fan 1200mm without regulator Heavy Duty

Ceiling Fan 1200mm without regulator Heavy Duty

20 nos Delivery: 60 days
#17

Ceiling Fan Rubber Reel with nuts and bolts set Heavy Duty

Ceiling Fan Rubber Reel with nuts and bolts set Heavy Duty

50 nos Delivery: 60 days
#18

Rose Ceiling Make Havells Cona Anchor or equivalent

Rose Ceiling Make Havells Cona Anchor or equivalent

100 nos Delivery: 60 days
#19

Cordless Bell Heavy Duty

Cordless Bell Heavy Duty

10 nos Delivery: 60 days
#20

Copper Cable three core 1 point 5 sqmm for AC Heavy Duty

Copper Cable three core 1 point 5 sqmm for AC Heavy Duty

200 rm Delivery: 60 days
#21

Copper Cable three core 2 point 5 sqmm for AC Heavy Duty

Copper Cable three core 2 point 5 sqmm for AC Heavy Duty

630 rm Delivery: 60 days
#22

Distil Water Heavy Duty

Distil Water Heavy Duty

100 ltrs Delivery: 60 days
#23

Door Bell Heavy Duty

Door Bell Heavy Duty

70 nos Delivery: 60 days
#24

Electric Cable 1 point 5 Sqmm Rol of 180 mtr Heavy Duty

Electric Cable 1 point 5 Sqmm Rol of 180 mtr Heavy Duty

3 nos Delivery: 60 days
#25

Electric Cable 2 point 5 Sqmm Rol of 180 mtr Heavy Duty

Electric Cable 2 point 5 Sqmm Rol of 180 mtr Heavy Duty

3 nos Delivery: 60 days
#26

Electric Cable 4 Sqmm Rol of 180 mtr Heavy Duty

Electric Cable 4 Sqmm Rol of 180 mtr Heavy Duty

8 nos Delivery: 60 days
#27

Electric Cable 6 Sqmm Roll of 180 mtr Heavy Duty

Electric Cable 6 Sqmm Roll of 180 mtr Heavy Duty

2 nos Delivery: 60 days
#28

Electric plug Top 16 A Heavy Duty

Electric plug Top 16 A Heavy Duty

50 nos Delivery: 60 days
#29

Electric plug Top 6 Amp Heavy Duty

Electric plug Top 6 Amp Heavy Duty

10 nos Delivery: 60 days
#30

Exhaust Fan Motor 250 mm size Heavy Duty

Exhaust Fan Motor 250 mm size Heavy Duty

20 nos Delivery: 60 days
#31

Regoolator Fans switch type or Piano Type Make Anchor panasonic or equivalent

Regoolator Fans switch type or Piano Type Make Anchor panasonic or equivalent

100 nos Delivery: 60 days
#32

Fan regulator Socket Type Make Anchor panasonic or equivalent

Fan regulator Socket Type Make Anchor panasonic or equivalent

49 nos Delivery: 60 days
#33

Flexible wire twin core copper 90 mtr Make Havell Anchor Polycab or equivalent

Flexible wire twin core copper 90 mtr Make Havell Anchor Polycab or equivalent

10 roll Delivery: 60 days
#34

Hight Tension Insulation Tep 3 Mtrs Make 3M or equivalent

Hight Tension Insulation Tep 3 Mtrs Make 3M or equivalent

30 roll Delivery: 60 days
#35

Light Emitting Diode fitting 4 ft long 18 or 20 watt Heavy Duty

Light Emitting Diode fitting 4 ft long 18 or 20 watt Heavy Duty

1,000 nos Delivery: 60 days
#36

Light Emitting Diode Flo od Light 100 Watts Heavy Duty

Light Emitting Diode Flo od Light 100 Watts Heavy Duty

10 nos Delivery: 60 days
#37

Light Emitting Diode Flo od Light 120 Watts Heavy Duty

Light Emitting Diode Flo od Light 120 Watts Heavy Duty

10 nos Delivery: 60 days
#38

Light Emitting Diode Flo od Light 150 Watts Heavy Duty

Light Emitting Diode Flo od Light 150 Watts Heavy Duty

10 nos Delivery: 60 days
#39

Light Emitting Diode Flo od Light 90 Watts Heavy Duty

Light Emitting Diode Flo od Light 90 Watts Heavy Duty

10 nos Delivery: 60 days
#40

Light Emitting Diode street light 60W Heavy Duty

Light Emitting Diode street light 60W Heavy Duty

20 nos Delivery: 60 days
#41

LED street light fitting of 70 to 72 watt Heavy Duty

LED street light fitting of 70 to 72 watt Heavy Duty

20 nos Delivery: 60 days
#42

MCB 100 Amp TPN Heavy Duty

MCB 100 Amp TPN Heavy Duty

4 nos Delivery: 60 days
#43

MCB 2 pole 32A SPN Heavy Duty

MCB 2 pole 32A SPN Heavy Duty

20 nos Delivery: 60 days
#44

MCB 2 pole 40A SPN Heavy Duty

MCB 2 pole 40A SPN Heavy Duty

18 nos Delivery: 60 days
#45

MCB 63 Amp TP Heavy Duty

MCB 63 Amp TP Heavy Duty

10 nos Delivery: 60 days
#46

MCB 63 Amp TPN Heavy Duty

MCB 63 Amp TPN Heavy Duty

40 nos Delivery: 60 days
#47

MCB SP 10A Heavy Duty

MCB SP 10A Heavy Duty

30 nos Delivery: 60 days
#48

MCB SP 16A Heavy Duty

MCB SP 16A Heavy Duty

50 nos Delivery: 60 days
#49

MCB SP 25A Heavy Duty

MCB SP 25A Heavy Duty

60 nos Delivery: 60 days
#50

Metal Clad 3 pin top Heavy Duty

Metal Clad 3 pin top Heavy Duty

20 nos Delivery: 60 days
#51

Metal Clad AC box Heavy Duty

Metal Clad AC box Heavy Duty

20 nos Delivery: 60 days
#52

Modular Plate Module 1 Heavy Duty

Modular Plate Module 1 Heavy Duty

20 nos Delivery: 60 days
#53

Modular Plate Module 10 or 12 Heavy Duty

Modular Plate Module 10 or 12 Heavy Duty

30 nos Delivery: 60 days
#54

Modular Plate Module 2 Heavy Duty

Modular Plate Module 2 Heavy Duty

20 nos Delivery: 60 days
#55

Modular Plate Module 3 Heavy Duty

Modular Plate Module 3 Heavy Duty

20 nos Delivery: 60 days
#56

Modular Plate Module 4 Heavy Duty

Modular Plate Module 4 Heavy Duty

20 nos Delivery: 60 days
#57

Modular Plate Module 6 Heavy Duty

Modular Plate Module 6 Heavy Duty

20 nos Delivery: 60 days
#58

Modular Plate Module 8 Heavy Duty

Modular Plate Module 8 Heavy Duty

20 nos Delivery: 60 days
#59

Modular Socket 15 or 16 Amp as per sample Heavy Duty

Modular Socket 15 or 16 Amp as per sample Heavy Duty

30 nos Delivery: 60 days
#60

Modular Socket 5 or 6 Ampas per sample Heavy Duty

Modular Socket 5 or 6 Ampas per sample Heavy Duty

30 nos Delivery: 60 days
#61

Modular Switch 15 or 16 Amp as per sample Heavy Duty

Modular Switch 15 or 16 Amp as per sample Heavy Duty

30 nos Delivery: 60 days
#62

Modular Switch 5 or 6 Amp as per sample Heavy Duty

Modular Switch 5 or 6 Amp as per sample Heavy Duty

30 nos Delivery: 60 days
#63

Multi Pendent Holder with 2 pin plug Heavy Duty

Multi Pendent Holder with 2 pin plug Heavy Duty

20 nos Delivery: 60 days
#64

Off Load Change Over 200 Amp Heavy Duty

Off Load Change Over 200 Amp Heavy Duty

2 nos Delivery: 60 days
#65

Off Load Change Over 315 Amp Heavy Duty

Off Load Change Over 315 Amp Heavy Duty

1 nos Delivery: 60 days
#66

PVC 10 Sqmm 4 core Aluminium condctor Heavy Duty

PVC 10 Sqmm 4 core Aluminium condctor Heavy Duty

100 rm Delivery: 60 days
#67

PVC Batten Holder Heavy Duty

PVC Batten Holder Heavy Duty

50 nos Delivery: 60 days
#68

PVC bend 25 mm Heavy Duty

PVC bend 25 mm Heavy Duty

20 nos Delivery: 60 days
#69

PVC Casing capping 20mm Heavy Duty

PVC Casing capping 20mm Heavy Duty

50 rm Delivery: 60 days
#70

PVC Casing capping 25mm Heavy Duty

PVC Casing capping 25mm Heavy Duty

50 rm Delivery: 60 days
#71

PVC Conduit Pipe 25mm Heavy Duty

PVC Conduit Pipe 25mm Heavy Duty

80 rm Delivery: 60 days
#72

PVC Flexible Pipe 25 mm Heavy Duty

PVC Flexible Pipe 25 mm Heavy Duty

150 rm Delivery: 60 days
#73

PVC Insulation Tape 25 mtr Heavy Duty

PVC Insulation Tape 25 mtr Heavy Duty

100 nos Delivery: 60 days
#74

PVC round sheet 100mm Heavy Duty

PVC round sheet 100mm Heavy Duty

30 nos Delivery: 60 days
#75

Screw 1 inch for electricians Heavy Duty

Screw 1 inch for electricians Heavy Duty

2 pkt Delivery: 60 days
#76

Screw 2 inches for electricians Heavy Duty

Screw 2 inches for electricians Heavy Duty

2 pkt Delivery: 60 days
#77

Screw 3 inches for electricians Heavy Duty

Screw 3 inches for electricians Heavy Duty

2 pkt Delivery: 60 days
#78

Screw gitti 1 inch Heavy Duty

Screw gitti 1 inch Heavy Duty

2 pkt Delivery: 60 days
#79

Screw gitti 2 inches Heavy Duty

Screw gitti 2 inches Heavy Duty

2 pkt Delivery: 60 days
#80

Screw gitti 3 inches Heavy Duty

Screw gitti 3 inches Heavy Duty

2 pkt Delivery: 60 days
#81

Socket 5 or 15A 6 Pin Multi Make Anchor Legrand Havells or equivalent

Socket 5 or 15A 6 Pin Multi Make Anchor Legrand Havells or equivalent

200 nos Delivery: 60 days
#82

Socket 5A 3 and 5 pin Make Anchor Legrand Havells or equivalent

Socket 5A 3 and 5 pin Make Anchor Legrand Havells or equivalent

200 nos Delivery: 60 days
#83

Switch 05 Amps 2 way Heavy Duty

Switch 05 Amps 2 way Heavy Duty

50 nos Delivery: 60 days
#84

Switch 15 Amp Heavy Duty

Switch 15 Amp Heavy Duty

100 nos Delivery: 60 days
#85

Switch 5 or 6 Amps Heavy Duty

Switch 5 or 6 Amps Heavy Duty

400 nos Delivery: 60 days
#86

Switch socket 5 or 15A with box Heavy Duty

Switch socket 5 or 15A with box Heavy Duty

100 nos Delivery: 60 days
#87

Switch socket 5A with box Heavy Duty

Switch socket 5A with box Heavy Duty

100 nos Delivery: 60 days
#88

Switch Socket Combination 6 Amp Heavy Duty

Switch Socket Combination 6 Amp Heavy Duty

100 nos Delivery: 60 days
#89

Switch Socket Combination 6 or 16 Amps Heavy Duty

Switch Socket Combination 6 or 16 Amps Heavy Duty

80 nos Delivery: 60 days
#90

Almirah lock 6 lever Heavy Duty

Almirah lock 6 lever Heavy Duty

20 nos Delivery: 60 days
#91

Anti Termite Treatment in 01 ltr Heavy Duty

Anti Termite Treatment in 01 ltr Heavy Duty

25 ltrs Delivery: 60 days
#92

Brass Hook 3 inches Heavy Duty

Brass Hook 3 inches Heavy Duty

30 nos Delivery: 60 days
#93

Brass Hook 5 inches Heavy Duty

Brass Hook 5 inches Heavy Duty

30 nos Delivery: 60 days
#94

Brown Cardboard corrugated roll 140 gsm 25 inches or 50 inches wide Heavy Duty

Brown Cardboard corrugated roll 140 gsm 25 inches or 50 inches wide Heavy Duty

50 mtrs Delivery: 60 days
#95

Cane Plastic 2mm white Heavy Duty

Cane Plastic 2mm white Heavy Duty

30 kgs Delivery: 60 days
#96

Cane Plastic 4mm white Heavy Duty

Cane Plastic 4mm white Heavy Duty

30 kgs Delivery: 60 days
#97

Caster wheel push type Heavy Duty

Caster wheel push type Heavy Duty

40 nos Delivery: 60 days
#98

Caster wheel with base plate Heavy Duty

Caster wheel with base plate Heavy Duty

40 nos Delivery: 60 days
#99

Channel telescopic for drawer 12 inches Heavy Duty

Channel telescopic for drawer 12 inches Heavy Duty

20 nos Delivery: 60 days
#100

Circular wooden Cutter Blade 4 inches Heavy Duty

Circular wooden Cutter Blade 4 inches Heavy Duty

10 nos Delivery: 60 days
#101

Cloth Cotton Green Blazer Heavy Duty

Cloth Cotton Green Blazer Heavy Duty

40 rm Delivery: 60 days
#102

Cloth Mal Mal White Heavy Duty

Cloth Mal Mal White Heavy Duty

100 rm Delivery: 60 days
#103

CP Drawer Handle 4 inches Heavy Duty

CP Drawer Handle 4 inches Heavy Duty

20 nos Delivery: 60 days
#104

CP Drawer Handle 6 inches Heavy Duty

CP Drawer Handle 6 inches Heavy Duty

20 nos Delivery: 60 days
#105

CP Drawer Handle 8 inches Heavy Duty

CP Drawer Handle 8 inches Heavy Duty

20 nos Delivery: 60 days
#106

Cushion Seat and back set with rexine cover bottom ply for Chair CB Steel with arms Heavy Duty

Cushion Seat and back set with rexine cover bottom ply for Chair CB Steel with arms Heavy Duty

30 prs Delivery: 60 days
#107

Emery paper 100mm with 60 No Heavy Duty

Emery paper 100mm with 60 No Heavy Duty

40 nos Delivery: 60 days
#108

Emery paper 100mm with 80 No Heavy Duty

Emery paper 100mm with 80 No Heavy Duty

50 nos Delivery: 60 days
#109

Febric Upholstery 6 ft width Heavy Duty

Febric Upholstery 6 ft width Heavy Duty

25 mtrs Delivery: 60 days
#110

Fevi Quick 20 ml pack Heavy Duty

Fevi Quick 20 ml pack Heavy Duty

30 nos Delivery: 60 days
#111

Foam Cushion with stiched cloth cover for chair dining size 16 inches x 17 inches x 4 inches Heavy Duty

Foam Cushion with stiched cloth cover for chair dining size 16 inches x 17 inches x 4 inches Heavy Duty

70 nos Delivery: 60 days
#112

Foam Cushion with stiched cloth cover for sofa size 21x22x4 Set of 10 Heavy Duty

Foam Cushion with stiched cloth cover for sofa size 21x22x4 Set of 10 Heavy Duty

40 set Delivery: 60 days
#113

French polish Heavy Duty

French polish Heavy Duty

20 ltrs Delivery: 60 days
#114

Haydrolic assy for chair computer Heavy Duty

Haydrolic assy for chair computer Heavy Duty

40 nos Delivery: 60 days
#115

Melamin Polish 4 Ltrs Heavy Duty

Melamin Polish 4 Ltrs Heavy Duty

1 nos Delivery: 60 days
#116

Melamin Sealer 4 Ltrs Heavy Duty

Melamin Sealer 4 Ltrs Heavy Duty

1 nos Delivery: 60 days
#117

Multipurpose Lock 50mm 5 Lever heavy duty with 2 Keys Heavy Duty

Multipurpose Lock 50mm 5 Lever heavy duty with 2 Keys Heavy Duty

40 nos Delivery: 60 days
#118

Packing Material bubble wrap 80 gsm 1 mtr wide Heavy Duty

Packing Material bubble wrap 80 gsm 1 mtr wide Heavy Duty

40 mtrs Delivery: 60 days
#119

Packing wrap roll heavy duty 2 ft wide Heavy Duty

Packing wrap roll heavy duty 2 ft wide Heavy Duty

40 mtrs Delivery: 60 days
#120

Paint Brush 100mm Make Camel Brustro or equivalent

Paint Brush 100mm Make Camel Brustro or equivalent

13 nos Delivery: 60 days
#121

Paint Brush 25 mm Make Camel Brustro or equivalent

Paint Brush 25 mm Make Camel Brustro or equivalent

16 nos Delivery: 60 days
#122

Paint Brush 50 mm Make Camel Brustro or equivalent

Paint Brush 50 mm Make Camel Brustro or equivalent

10 nos Delivery: 60 days
#123

Paint Brush 75mm Make Camel Brustro or equivalent

Paint Brush 75mm Make Camel Brustro or equivalent

10 nos Delivery: 60 days
#124

Paint synthetic enamel colourBlack Make Asianpaint Bergerpaint Nerolac or equivalent

Paint synthetic enamel colourBlack Make Asianpaint Bergerpaint Nerolac or equivalent

40 ltrs Delivery: 60 days
#125

Paints enamel colourwhite Make Asianpaint Bergerpaint Nerolac or equivalent

Paints enamel colourwhite Make Asianpaint Bergerpaint Nerolac or equivalent

30 ltrs Delivery: 60 days
#126

Paint Synthetic Enamel OG Olive GreenMake Asianpaint Bergerpaint Nerolac or equivalent

Paint Synthetic Enamel OG Olive GreenMake Asianpaint Bergerpaint Nerolac or equivalent

40 ltrs Delivery: 60 days
#127

Paint Synthetic Enamel Smoke Grey Heavy Duty

Paint Synthetic Enamel Smoke Grey Heavy Duty

20 ltrs Delivery: 60 days
#128

Plywood Commercial of Size 36 inches x 78 inches x 12 mm Thick Heavy Duty

Plywood Commercial of Size 36 inches x 78 inches x 12 mm Thick Heavy Duty

10 nos Delivery: 60 days
#129

Plywood Commercial of Size 8 ft x 4 ft x 18 mm Thick Heavy Duty

Plywood Commercial of Size 8 ft x 4 ft x 18 mm Thick Heavy Duty

10 nos Delivery: 60 days
#130

Prelaminated ply board 12mm thick 8 ft x 4 ft Heavy Duty

Prelaminated ply board 12mm thick 8 ft x 4 ft Heavy Duty

20 nos Delivery: 60 days
#131

Prelaminated ply board 18mm thick 8 ft x 4 ft Heavy Duty

Prelaminated ply board 18mm thick 8 ft x 4 ft Heavy Duty

20 nos Delivery: 60 days
#132

Sand Paper 100 Nos Make 3M Deerfos or equivalent

Sand Paper 100 Nos Make 3M Deerfos or equivalent

1 nos Delivery: 60 days
#133

Teak wood beading 20mm x 6mm x 6 ft long Heavy Duty

Teak wood beading 20mm x 6mm x 6 ft long Heavy Duty

20 nos Delivery: 60 days
#134

Teak Wood Section 10 inches x 1 inch 7 point 5 ft Length Heavy Duty

Teak Wood Section 10 inches x 1 inch 7 point 5 ft Length Heavy Duty

20 nos Delivery: 60 days
#135

Teak Wood Section 10 inches x 4 inches 7 point 5 ft Length Heavy Duty

Teak Wood Section 10 inches x 4 inches 7 point 5 ft Length Heavy Duty

5 nos Delivery: 60 days
#136

Teak Wood Section 11 inches x 1 inches 7 point 5 ft Length Heavy Duty

Teak Wood Section 11 inches x 1 inches 7 point 5 ft Length Heavy Duty

25 nos Delivery: 60 days
#137

Teak Wood Section 11 inches x 4 inches 7 point 5 ft Length Heavy Duty

Teak Wood Section 11 inches x 4 inches 7 point 5 ft Length Heavy Duty

7 nos Delivery: 60 days
#138

Teak Wood Section 3 inches x 1 point 5 inches 7 point 5 ft Length Heavy Duty

Teak Wood Section 3 inches x 1 point 5 inches 7 point 5 ft Length Heavy Duty

20 nos Delivery: 60 days
#139

Teak Wood Section 3 inches x 2 inches 7 point 5 ft Length Heavy Duty

Teak Wood Section 3 inches x 2 inches 7 point 5 ft Length Heavy Duty

8 nos Delivery: 60 days
#140

Teak Wood Section 4 inches x 1 inch 7 point 5 ft Length Heavy Duty

Teak Wood Section 4 inches x 1 inch 7 point 5 ft Length Heavy Duty

25 nos Delivery: 60 days
#141

Teak Wood Section 4 inches x 1 point 5 inches 7 point 5 feet Length Heavy Duty

Teak Wood Section 4 inches x 1 point 5 inches 7 point 5 feet Length Heavy Duty

25 nos Delivery: 60 days
#142

Teak Wood Section 4 inches x 2 inches 7 point 5 ft Length Heavy Duty

Teak Wood Section 4 inches x 2 inches 7 point 5 ft Length Heavy Duty

5 nos Delivery: 60 days
#143

Teak Wood Section 4 inches x 3 inches 7 point 5 ft Length Heavy Duty

Teak Wood Section 4 inches x 3 inches 7 point 5 ft Length Heavy Duty

10 nos Delivery: 60 days
#144

Teak Wood Section 5 inches x 1 inch 7 point 5 ft Length Heavy Duty

Teak Wood Section 5 inches x 1 inch 7 point 5 ft Length Heavy Duty

25 nos Delivery: 60 days
#145

Teak Wood Section 5 inches x 1 point 5 inches 7 point 5 ft Length Heavy Duty

Teak Wood Section 5 inches x 1 point 5 inches 7 point 5 ft Length Heavy Duty

25 nos Delivery: 60 days
#146

Teak Wood Section 5 inches x 3 inches 7 point 5 ft Length Heavy Duty

Teak Wood Section 5 inches x 3 inches 7 point 5 ft Length Heavy Duty

10 nos Delivery: 60 days
#147

Teak Wood Section 6 inches x 1 inch 7 point 5 ft Length Heavy Duty

Teak Wood Section 6 inches x 1 inch 7 point 5 ft Length Heavy Duty

25 nos Delivery: 60 days
#148

Teak Wood Section 6 inches x 3 inches 7 point 5 ft Length Heavy Duty

Teak Wood Section 6 inches x 3 inches 7 point 5 ft Length Heavy Duty

10 nos Delivery: 60 days
#149

Teak Wood Section 7 inches x 1 inches 7 point 5 ft Length Heavy Duty

Teak Wood Section 7 inches x 1 inches 7 point 5 ft Length Heavy Duty

20 nos Delivery: 60 days
#150

Teak Wood Section 7 inches x 3 inches 7 point 5 ft Length Heavy Duty

Teak Wood Section 7 inches x 3 inches 7 point 5 ft Length Heavy Duty

8 nos Delivery: 60 days
#151

Teak Wood Section 8 inches x 1 inches 7 point 5 ft Length Heavy Duty

Teak Wood Section 8 inches x 1 inches 7 point 5 ft Length Heavy Duty

10 nos Delivery: 60 days
#152

Teak Wood Section 8 inches x 3 inches 7 point 5 ft Length Heavy Duty

Teak Wood Section 8 inches x 3 inches 7 point 5 ft Length Heavy Duty

10 nos Delivery: 60 days
#153

Teak Wood Section 9 inches x 1 inch 7 point 5 ft Length Heavy Duty

Teak Wood Section 9 inches x 1 inch 7 point 5 ft Length Heavy Duty

20 nos Delivery: 60 days
#154

Teak Wood Section 9 inches x 3 inches 7 point 5 ft Length Heavy Duty

Teak Wood Section 9 inches x 3 inches 7 point 5 ft Length Heavy Duty

10 nos Delivery: 60 days
#155

Telescopic Drawer channel 14 inches Soft Clouser Heavy Duty

Telescopic Drawer channel 14 inches Soft Clouser Heavy Duty

10 nos Delivery: 60 days
#156

Telescopic Drawer channel 16 inches Soft Clouser Heavy Duty

Telescopic Drawer channel 16 inches Soft Clouser Heavy Duty

10 nos Delivery: 60 days
#157

Telescopic Drawer channel 18 inches Soft Clouser Heavy Duty

Telescopic Drawer channel 18 inches Soft Clouser Heavy Duty

10 nos Delivery: 60 days
#158

Telescopic Drawer channel 20 inches Soft Clouser Heavy Duty

Telescopic Drawer channel 20 inches Soft Clouser Heavy Duty

20 nos Delivery: 60 days
#159

Thinner 1 ltrs pack Heavy Duty

Thinner 1 ltrs pack Heavy Duty

10 ltrs Delivery: 60 days
#160

Touch wood 1 ltrs pack Heavy Duty

Touch wood 1 ltrs pack Heavy Duty

10 ltrs Delivery: 60 days
#161

Truckey umber Golden Parrot colour Heavy Duty

Truckey umber Golden Parrot colour Heavy Duty

20 pkt Delivery: 60 days
#162

Turpentine Oil 1 ltrs pack Heavy Duty

Turpentine Oil 1 ltrs pack Heavy Duty

30 ltrs Delivery: 60 days
#163

Varnish Best Quality Heavy Duty

Varnish Best Quality Heavy Duty

20 ltrs Delivery: 60 days
#164

Varnish Powder Choclate in 500 gm pack Heavy Duty

Varnish Powder Choclate in 500 gm pack Heavy Duty

10 pkt Delivery: 60 days
#165

Veneer plywood 4mm 8 ft x 4 ft Heavy Duty

Veneer plywood 4mm 8 ft x 4 ft Heavy Duty

15 nos Delivery: 60 days
#166

Yellow colour Mitti Heavy Duty

Yellow colour Mitti Heavy Duty

15 kgs Delivery: 60 days

Categories 100

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer